Case study:River Wandle: Silt & SuDs
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Hydromorphology, Social benefits, Water quality, Urban |
Country | England |
Main contact forename | Bella |
Main contact surname | Davies |
Main contact user ID | |
Contact organisation | Wandle Trust |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The overall aim of the project is to improve the ecological potential of the Wandle water bodies by reducing the impact of man-made structures on the river’s ecology, restoring natural features and processes and reducing the impact of urban diffuse pollution.
To reduce urban diffuse pollution, five innovative measures were installed and trialled to determine their effectiveness for mitigation of urban diffuse pollution, particularly road runoff:
Rain Gardens installed to intercept surface water and aesthetically enhance an area in Hackbridge. Downstream Defenders (DD) intercept surface water drains and remove sediment by centrifugal forces. Mycofiletrs are bags full of a substrate as a feedstock for the native oyster mushroom which accumulate toxins such as heavy metals from the passing water. Siltex is a natural chalk like substance which helps to increase the speed of silt breakdown by stimulating natural processes. Smart Sponges are a commercial product specially designed to absorb oils mixed in the water. When placed in gully pots, Smart Sponges can permanently remove oils from the drainage system before they enter the rivers.
Monitoring surveys and results
Lessons learnt
Challenges:
- Identify spaces for DDs underground amongst utilities.
- Each defender had to be custom made to match the angle of the various outfall pipes allowing them to integrate with the established system.
- Getting commitment from parties to empty the DDs.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Butter Hill Phase 2, River Wandle Restoration Project, River Wandle: Butter Hill Phase 1, River Wandle: Silt & SuDs, Wandle River Restoration Project: Hackbridge
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|