Case study:Millfield Plantation 2
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | http://http://www.essexrivershub.org.uk/ |
Themes | |
Country | England |
Main contact forename | Kieren |
Main contact surname | Alexander |
Main contact user ID | User:KierenAlexander |
Contact organisation | Essex Wildlife Trust |
Contact organisation web site | http://http://www.essexwt.org.uk/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The river restoration project at Millfield plantation builds on the work also being undertaken at Bocking Blackwater local nature reserve, Ironbridge Farm and Plough Hill farm. All the projects are linked both thematically and geographically and are focused on improving the status of the river under the water framework.
Currently the river Pant is failing under WFD, a number of issues have been identified including physical modification, fish passage and both point source and diffuse pollution. This manifests itself in a manner of ways, most notably with a heavily modified channel which has been deepened and in places straightened but most importantly disconnected from its floodplain by large artificial bunds. The land use is predominantly arable and this can lead to some pollution events both diffuse and one of such as oil and other contaminants. It should be noted that Essex and Suffolk water have done a huge amount to improve the status of this river by landowner interaction and education and this project aims to build on this.
After a period of consultation and a professional assessment looking at the feasibility of the project a plan was designed to start improving the water body. This will involve installing a pipe at the mouth of an old channel, we do not know exactly know what the original purpose of this channel was but it is likely to be an old mill race that due to historical management has been increasingly separated from the original channel. However, it now offers a unique chance to reconnect the floodplain and contribute to water quality via the installation of a new 300mm culvert and simple pipe.
This will allow the back channel to go from being inundated a handful of times a year to up to 15 or 16 times. This will only be transitory inundation, we are not planning on installing anything that will hold water back but it should be enough to kick start some changes in the vegetation structure promoting semi-aquatic and marginal vegetation.
Monitoring surveys and results
Fixed point photography will be utilised to monitor any changes in vegetation and land forming.
Lessons learnt
The River Pant has low flow issues during the summer, and is also a conduit for the Ely-Ouse transfer system, these must be protected at all costs. Therefore any connection to the floodplain must take this into account. Also, due to the constraints of having to ensure that the landowner can keep access to the surrounding fields we have had to go for a formal connection, in an ideal world we would go for a more informal connection that would offer additional benefits to fish fry and avoid the need for an eel screen to prevent eels from being deposited in the new back channel.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Bocking Blackwater River Restoration
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|