Case study:Millfield Plantation 2
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | http://http://www.essexrivershub.org.uk/ |
Themes | |
Country | England |
Main contact forename | Kieren |
Main contact surname | Alexander |
Main contact user ID | User:KierenAlexander |
Contact organisation | Essex Wildlife Trust |
Contact organisation web site | http://http://www.essexwt.org.uk/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The River pant in this location has undergone a high degree of physical modification and has limited or no connectivity with the floodplain on either bank. As such the project proposes to reconnect the surrounding meadows, creating a secondary channel and some wet grassland.
To do this it is proposed that a 300mm pipe is installed approximately at a height that will allow regular inundation, especially during high rainfall events and will facilitate the creation of the back channel.
The back channel will then be further enhanced by limited excavation and pool creation to form bays and hold water during periods of drought.In the main river we plan to install some woody debris. This is an area that suffers repeatedly from drying out in the summer months causing issues with the fish populations and a reduction of in stream diversity.
By installing the woody debris we hope to create some riverbed diversity which will create pools and hold water for longer in the summer months, the flow deflectors will also hold water back in the catchment and alleviate conditions for fish. The faster moving water will also oxygenate the water and provide better conditons for fish fry and spawning fish.
Monitoring surveys and results
Fixed point photography will be utilised to monitor any changes in vegetation and land forming.
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Bocking Blackwater River Restoration
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|