Case study:Millfield Plantation 2
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | |
Country | England |
Main contact forename | Kieren |
Main contact surname | Alexander |
Main contact user ID | User:KierenAlexander |
Contact organisation | Essex Wildlife Trust |
Contact organisation web site | http://http://www.essexrivershub.org.uk/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The River pant in this location has undergone a high degree of physical modification and has limited or no connectivity with the floodplain on either bank. As such the project proposes to reconnect the surrounding meadows, creating a secondary channel and some wet grassland.
To do this it is proposed that a 300mm pipe is installed approximately at a height that will allow regular inundation, especially during high rainfall events and will facilitate the creation of the back channel.
The back channel will then be further enhanced by limited excavation and pool creation to form bays and hold water during periods of drought.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|