Case study:Chambers Wharf
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 51° 30' 2.79" N, 0° 3' 56.49" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Spatial planning |
Country | England |
Main contact forename | James |
Main contact surname | Togher |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | St Martins Property Investments Ltd; |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
Situated just to the east of Tower Bridge on the south bank of the River Thames, Chambers Wharf was for many years one of
the capital’s major cold stores. Having fallen into disuse, the site, owned by international property development company
St Martins, now has planning permission for 587 new homes; 180 of these homes will be affordable and there will be some retail units at ground level, fronting Chambers Street. Demolition of the former cold stores has been completed and the new scheme is scheduled to be finished in 2013.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Site
Name | Chambers Wharf |
---|---|
WFD water body codes | GB530603911402 |
WFD (national) typology | Intertidal |
WFD water body name | Thames Middle |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | EU - WFD protected area (drinking water, shellfish etc.) |
Local/regional site designations | |
Protected species present | Yes |
Invasive species present | Yes |
Species of interest | |
Dominant hydrology | Estuary |
Dominant substrate | Estuarine mud |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 160160 m <br />0.16 km <br />16,000 cm <br /> |
---|---|
Project started | 2008/01/01 |
Works started | |
Works completed | |
Project completed | 2013/12/31 |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | St Martins Property Investments Ltd |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Bank improvement |
Floodplain / River corridor | |
Planform / Channel pattern | removal of jetty |
Other | roosting posts, Brownfield land regeneration, green roofs, SUDS, nesting boxes |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | riverside walkway |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information