Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Sutcliffe Park |
---|---|
WFD water body codes | GB106039023290 |
WFD (national) typology | Calcareous |
WFD water body name | Quaggy |
Pre-project morphology | Closed culvert |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Channel pattern/planform | Yes | Yes | No | No | No |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish | Yes | Yes | No | Yes | No | |
Invertebrates | Yes | Yes | No | Yes | No | |
Macrophytes | Yes | No | No | No | No |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
stakeholder liaison | Yes | Yes | No | No | No | |
health benefits | No | Yes | No | No | No | Improvement |
economic benefits | No | Yes | No | No | No | Inconclusive |
River Corridor Survey | Yes | Yes | No | No | No | |
Bat Survey | Yes | No | No | No | No | |
Mammel survey | Yes | No | No | No | No |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information
construction The works were designed to alleviate flooding in the Lewisham area. The flood detention area was constructed on the Quaggy River. The location of the detention area is approximately 3km east of Lewisham, in the London Borough of Greenwich, in Sutcliffe Park, formerly eight football pitches. The construction includes a 2.5m high x 480m long earth embankment, which surrounds Sutcliffe Park. The embankment is 2.5m high at its highest point to the west side of the site and at existing ground level to the east. The embankment retains floodwaters within the reservoir basin that has been excavated. The culvert carrying the river follows two sides of the park and is to remain. The low flow inlet control structure was formed through cutting slots into the side of the culvert and a reinforced concrete channel to direct the flow into the park. A few metres downstream of the low flow inlet is a 0.5m high weir to direct the majority of the flow through the park.
The high flow inlet also has slots cut into the side of the culvert and a concrete slab in front to prevent erosion. Just downstream of the high flow inlet a flume has been constructed within the culvert to constrict the flow. The spillway also has slots in the side of the culvert and the landform is at a lower level to allow the water back into the culvert at this location. The outlet structure is constructed from reinforced concrete and has a plastic pipe connecting the flow from the park back into the culvert. The low flow inlet and outlet structures have penstocks within them to control the water movements.