User:NickRRC

From RESTORE
Revision as of 15:16, 4 December 2013 by NickRRC (talk | contribs)
Jump to navigation Jump to search

This is the user page for Nick Elbourne.

Actions:


Check for coverage on start/end dates, themes and measures

 LocationCountryApproval statusPlease enter a description of the projectProject startedProject completedBank and bed modifications measureRiver corridor measureChannel pattern measureOther technical measureManagement interventionsThemeBiological quality element monitoredHydromorphological quality element monitoredPhysico-chemical quality element monitoredOther response monitored
't Merkske51° 25' 4.63" N, 4° 50' 29.21" ENetherlands
Belgium
DraftEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Monitoring
Water quality
2e Lower Woodsford River and Floodplain Enhancement50° 43' 12.17" N, 2° 18' 50.69" WEnglandApproved1 January 20121 January 2014Removal of revetmentsTree planting
Lowering of embankments
Re-profiled ditchFisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
3Rivers - Lumburn:Walkham:Tavy50° 31' 45.52" N, 4° 9' 38.87" WEnglandApprovedfloodplain woodland plantingLand managementWater quality
Aaijen- Removal of bank fixation51° 34' 51.60" N, 6° 2' 25.80" ENetherlandsApproved1 January 2005Removal of bank reinforcementsFlood risk management
Monitoring
Water quality
Invertebrates: Abundance
Invertebrates: Taxonomic composition
Macrophytes
Continuity for organisms
Abaissement et démantèlement de trois clapets sur l’Orge aval48° 37' 57.50" N, 2° 18' 46.38" EFranceApproved1 March 201030 September 2012Lowering of checking valves
Removal of checking valves
Water supply channel lowering
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Water quality
Urban
Abbey Brook Weir52° 59' 13.60" N, 3° 11' 11.70" WWalesApproved1 August 20111 November 2011Rock ramp construction
Creation of fish passes
Fisheries
Habitat and biodiversity
Hydropower
Abbots Worthy Restoration Project51° 5' 16.75" N, 1° 17' 6.30" WEnglandDraft1 April 2018Flood risk management
Habitat and biodiversity
Abbotts Hall Managed Realignment Scheme51° 47' 5.40" N, 0° 50' 51.59" EEnglandApprovedFlood risk management
Habitat and biodiversity
Fish
Invertebrates
Macrophytes
Flow velocitiesSalinity
Adams Mill enhancements52° 5' 51.58" N, 0° 45' 14.71" WEnglandApproved1 September 2014Bank stabilisationIncrease in-channel hydromorphological diversityFisheries
Hydromorphology
FishQuantity & dynamics of flow
Substrate conditions
Habitat mapping
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins47° 35' 16.84" N, 2° 39' 47.11" WFranceApproved1 January 2004Weir partial removal or permanent opening of gates allowing self restoration of previously impunded stretchesMore natural reservoir releasesSocial representation of the river
Adare Fish Counter52° 39' 41.63" N, 8° 48' 20.72" WIrelandApprovedCreation of fish passesFisheries
Social benefits
Afon Clywdd53° 10' 57.73" N, 3° 22' 7.56" WWalesDraftRunoff pathway managementFlood risk management
Habitat and biodiversity
Land use management - agriculture
Land use management - forestry
Water quality
Afon Merin Natural Process Restoration52° 23' 56.58" N, 3° 46' 27.57" WWalesApproved1 February 201815 leaky dams and scrapes.Environmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - forestry
Monitoring
Water quality
Agreed definition of mobility area for the Adour43° 39' 8.51" N, 0° 0' 51.13" WFranceApproved1 January 2005Removal of bank reinforcementsDevelop riparian forestDefinition of erodble corridorChannel pattern/planform
Albany Park51° 40' 5.85" N, 0° 1' 59.94" WEnglandApproved4 January 2016Creation of berms
Creation of backwaters
River naturalisation
Reedbed creation
Scrapes
Fish habitat restoration
Environmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Spatial planning
Urban
Alkborough tidal defence scheme53° 42' 2.78" N, 0° 41' 31.70" WEnglandApproved2005Salt marsh and mudflat restorationFlood risk management
Social benefits
Invertebrates
Allt Lorgy River Restoration57° 16' 18.18" N, 3° 50' 33.26" WScotlandApproved1 March 2012Removal of in stream boulders and replacement with wood structures
Additional strategic wood structures introduced
Graded extracted gravel to be used for sediment reintroduction
Embankment lowering
Removal of 3 culvert pipes. Infilling of a large drainage ditch.Site fenced to enable natural regeneration to take place. Supplementary planting planned for Spring 2013. Long term site monitoring programmed planned.Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Alma Road Rain Gardens51° 38' 47.70" N, 0° 2' 3.53" WEnglandApproved1 April 201531 March 2016Sustainable urban drainage ponds (SUDs)Rain gardensEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Social benefits
Water quality
Urban
Amerongse Bovenpolder51° 59' 26.69" N, 5° 27' 46.93" ENetherlandsApproved1 January 200131 December 2015Habitat and biodiversity
Social benefits
Amwell Loop51° 47' 49.84" N, 0° 0' 2.16" WEnglandDrafthabitat improvements
Deflectors
Tree plantingEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot49° 14' 54.48" N, 5° 56' 12.04" EFranceApproved1 June 201230 June 2014Construction of a bypass channel
Dam removal
Creation of fish passes
Creation of lateral dike to regulate flows
Application of plant-engineering
Riparian planting
Remeandering
Creation of wetland
The banks are maintained if necessary by vegetal engineeringFlood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Ancholme and Coast habitat project53° 37' 34.86" N, 0° 32' 22.61" WEnglandDraft4 January 2018Fisheries
Flood risk management
Habitat and biodiversity
Anloërdiepje53° 2' 33.90" N, 6° 41' 22.12" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Monitoring
Water quality
Anton Crescent Wetlands Regeneration51° 22' 23.01" N, 0° 12' 8.64" WEnglandApprovedHabitat and biodiversity
Social benefits
Urban
Arasement du seuil des Treize Saules sur la Quilienne50° 9' 14.58" N, 2° 29' 25.30" EFranceApproved1 October 200931 October 2009Barrier removal
Planting of hydrophytes
Bank reprofiling
Filter masses were laid downstream of the dam to limit the impact of the work on the environmentFlood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise48° 44' 10.08" N, 1° 22' 15.20" EFranceApproved1 January 200831 December 2008Dismantling of the mill
Leveling threshold with the water level
Helophytes planted
Bank stabilisation
Installation of geotextile
Creation of a sinuous channelHabitat and biodiversity
Spatial planning
Water quality
Arborfield nature like bypass and weirs project51° 24' 28.95" N, 0° 55' 27.36" WEnglandApproved30 June 2010Introduction of spawning gravels
Riffle creation
Weir lowering
Bypass channel
Creation of backwater
Improving fish migration
Fisheries
Flood risk management
Habitat and biodiversity
Fish
Invertebrates
Macrophytes
Channel pattern/planform
Quantity & dynamics of flow
Habitat mapping
Arnos Park - Pymmes Brook51° 37' 16.08" N, 0° 8' 8.59" WEnglandDraft1 January 2008Creation of berms
Barrier removal
Embankment renaturalization
Creation of low flow channel
Creation of backwaters
River naturalisation
Scrapes
Floodplain reconnection
Remeandering
Fisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Urban
Ashlone Wharf FCRM scheme51° 28' 17.57" N, 0° 13' 22.45" WEnglandDraft1 May 2011Creation of fish passesFisheries
Flood risk management
Habitat and biodiversity
Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park52° 4' 17.35" N, 0° 49' 53.50" WEnglandApproved1 January 20071 January 2014Removal of sand from beneath agricultural fields and restoring marsh lands has increased floodplain capacity and improved floodwater managementEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Monitoring
Water quality
Aston Clinton River Restoration51° 47' 46.05" N, 0° 43' 29.72" WEnglandApproved1 August 2015DeculvertingBypass channel
Creation of new channel
Flood risk management
Habitat and biodiversity
Social benefits
Aubourn Rock Ramp and Habitat Works53° 9' 7.49" N, 0° 38' 10.62" WEnglandApproved5 January 2016Tree hinging over long section and large rock ramp installation to replace existing large weir that was a barrier to fish passage.Fisheries
Habitat and biodiversity
Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria47° 23' 45.38" N, 15° 16' 11.14" EAustriaApproved1 January 19951 January 2015Providing of continuityProtection of alluvial forests by connecting existing stocks to the fluvial dynamicsReconnection of cutoff meanderEconomic aspects
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydropower
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Social benefits
Spatial planning
Water quality
Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-200747° 11' 25.66" N, 14° 46' 38.03" EAustriaApproved1 August 200331 July 2007Creation of bars
Creation of Slips
Creation of undercut banks and islets
Creation of fish passes
Regeneration of alluvial forests
Creation of pond
Reconnection of water bodies to the riverEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-201547° 6' 19.47" N, 14° 12' 3.46" EAustriaApproved1 February 20101 February 2017implementation of Pool/riffle sequesnces
Creation of Slips
Creation of undercut banks
Creation of islands
Creation of bars
Improve longitudinal connectivity
Regeneration of alluvial forests
Floodplain reconnection
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Austria Upper Mur - Public relations in murerleben I + II LIFE III (LIFE03 NAT/A/000011) and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben I+II" 2003-201547° 10' 5.74" N, 14° 39' 29.20" EAustriaDraftHabitat and biodiversity
Monitoring
Social benefits
Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007)47° 11' 36.36" N, 14° 48' 42.24" EAustriaApproved17 September 2010Restoration of the connection of side armsEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Monitoring
Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015)47° 12' 9.04" N, 14° 50' 43.01" EAustriaDraftRemoval of bank reinforcements
Restoration of the connection of side arms
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015)47° 12' 9.70" N, 14° 34' 47.18" EAustriaApproved1 September 2015Embankment renaturalization
Restoration of the connection of side arms
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Austria Urban River Landscape - Urban River Landscape Graz47° 4' 14.57" N, 15° 26' 22.21" EAustriaApproved1 January 2004Structuring of shoreline
Construction gravel bays
Environmental flows and water resources
Habitat and biodiversity
Monitoring
Social benefits
Spatial planning
Water quality
Urban
Austria Urban River Landscape - Urban River Landscape Master Plan Leoben47° 22' 35.00" N, 15° 5' 28.07" EAustriaDraft1 January 201431 December 2014Social benefits
Spatial planning
Urban
Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013)46° 43' 16.52" N, 15° 49' 32.61" ESlovenia
Austria
Draft1 January 20091 January 2013Self-initiated bank erosion by sediment inputEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013)46° 41' 21.77" N, 15° 56' 59.21" ESlovenia
Austria
Approved1 January 200931 December 2013Construction gravel bays
Creation of islands
Removal of bank reinforcements
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007)46° 43' 7.14" N, 15° 48' 46.57" ESlovenia
Austria
Approved1 January 200231 December 2007Creation of undercut banks
Restoration of the connection of side arms
Creation of Slips
Creation of fords
Creation of potholes
Creation of gravel banks
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013)46° 43' 21.13" N, 15° 50' 0.96" ESlovenia
Austria
Approved1 January 200931 December 2013habitat improvementsChannel widening
Habitat creation
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg46° 41' 1.58" N, 15° 59' 13.74" ESlovenia
Austria
Draft2008Economic aspects
Environmental flows and water resources
Habitat and biodiversity
Social benefits
Spatial planning
Urban
Austria/Slovenia cross-border cooperation - “Die Murkommission” – Bilateral River Commission46° 41' 11.11" N, 15° 59' 14.61" ESlovenia
Austria
DraftEconomic aspects
Environmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Hydropower
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Social benefits
Spatial planning
Water quality
Urban
Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-201346° 43' 14.98" N, 15° 49' 3.13" ESlovenia
Austria
Draft1 January 200931 December 2013Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-200846° 43' 14.59" N, 15° 49' 3.41" ESlovenia
Austria
Draft1 January 200331 December 2008reactivation and extending of tributary streams
Bed load addition
Regeneration of alluvial forestsEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Avon Barriers Project55° 46' 2.99" N, 4° 1' 23.47" WScotlandApproved1 January 2015Weir modificationImproving fish migrationFisheries
Habitat and biodiversity
Avon Barriers Project: Ferengair Weir55° 46' 3.70" N, 4° 1' 22.57" WScotlandApproved1 January 2015Weir modificationImproving fish migrationFisheries
Habitat and biodiversity
BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT55° 4' 9.30" N, 6° 30' 26.56" WNorthern IrelandApproved7 April 2014Weir removal
Addition of substrate and in channel features
Alteration in channel dimensions
Creation of wetland
Creation of ponds and scrapes
Diversification of in-channel features
Meandering channel
management of wetland by council (new area of work)Fisheries
Flood risk management
Habitat and biodiversity
Social benefits
Urban
FishChannel pattern/planform
Freshwater flow regime
Channel bed morphology.
Babbs Mill reed bed52° 29' 19.58" N, 1° 45' 43.95" WEnglandApprovedChannel reprofilingReedbed creationHabitat and biodiversity
Urban
Babingley River at Hillington52° 48' 26.32" N, 0° 33' 42.62" EEnglandApproved20061 February 2007Creation of wooden deflectors
Habitat diversification
Cleaning of spawning gravels
Riparian plantingAdding sinuosity
Channel narrowing
Channel naturalisation
Creation of fish passes
Removal of sluice gates
FisheriesFish: Abundance
Invertebrates: Taxonomic composition
Macrophytes
Bakenhof Dyke reconstruction51° 58' 0.73" N, 5° 55' 37.43" ENetherlandsApproved20011 January 2004creation of secondary channelCreation of backwatersFlood risk management
Habitat and biodiversity
Ballinderry Freshwater Pearl Mussel Rescue Project54° 39' 27.99" N, 6° 53' 20.13" WNorthern IrelandApproved1 January 20131 January 2015Improve the river for mussels to surviveImproving the scheme of captive-breeding of musselsEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Monitoring
Social benefits
Water quality
Barking Creek near A1351° 31' 40.97" N, 0° 4' 49.82" EEnglandApproved1 August 200431 March 2006retreat and renewal of folld defences
construction of new intertidal area
New footpaths
sand martin nesting tubes
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Urban
Estuary
Barking Creekmouth51° 30' 59.87" N, 0° 5' 48.53" EEnglandApproved31 March 2006Creation of backwatersChannel realignmentFisheries
Flood risk management
Habitat and biodiversity
Social benefits
Urban
Estuary
Fish
Barn Elms Sports Ground51° 28' 20.53" N, 0° 14' 13.97" WEnglandDraftReedbed creation
Riparian planting
Fisheries
Habitat and biodiversity
Barn Elms Wetland Centre, South West London51° 28' 42.97" N, 0° 13' 58.14" WEnglandApprovedReedbed creation
Creation of a lake
Wetland habitat
Economic aspects
Habitat and biodiversity
Social benefits
Urban
Barnes Common51° 28' 18.69" N, 0° 14' 35.54" WEnglandApprovedFlood risk management
Habitat and biodiversity
Social benefits
Barnes Common improvements51° 28' 15.24" N, 0° 14' 40.90" WEnglandApproved20 December 2011Tree management
Riparian planting
mowing regime
Flow deflectors
Reedbed creation
Fisheries
Habitat and biodiversity
Hydromorphology
Urban
Barney Beck: Abandoned Metal Mines54° 23' 11.31" N, 1° 58' 29.27" WEnglandApprovedCatchment Characterisation Programme to investigate water pollution from abandoned metal mines and determine remediation options of metal pollutionEnvironmental flows and water resources
Habitat and biodiversity
Monitoring
Water quality
Barton Brook53° 49' 4.20" N, 2° 44' 43.27" WEnglandDraft
Bastion Maria (QUERCUS)51° 41' 14.25" N, 5° 17' 50.59" ENetherlandsApproved1 April 200729 May 2010Economic aspects
Social benefits
Water quality
Urban
Bathgate Watercourse Restoration Project55° 53' 50.14" N, 3° 38' 56.33" WScotlandApproved1 June 2016Introducing large woody debris
Re-meandering
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Spatial planning
Urban
Beam washlands51° 32' 2.67" N, 0° 10' 11.33" EEnglandApprovedOffline storage areasEconomic aspects
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Beck from the Brink53° 8' 10.38" N, 0° 53' 37.30" WEnglandDraft1 April 2018Habitat and biodiversity
Beddington Park51° 22' 24.17" N, 0° 8' 24.27" WEnglandDraft1 January 2008Bank reprofiling
Planting
Removal of sediment
Toeboard removal
Reedbed creationFisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Water quality
Urban
Beddington Park Enhancements51° 22' 21.92" N, 0° 9' 2.89" WEnglandDraftWeir modification
Weir notched
Bank reprofiling
Tree plantingChannel narrowing
Cleaning of spawning gravels
Reedbed creation
Flood risk management
Habitat and biodiversity
Hydromorphology
Water quality
Urban
Beek Lage Raam51° 42' 23.62" N, 5° 47' 25.08" ENetherlandsApproved2012StroombaanmaaienHabitat and biodiversity
Land use management - forestry
Peat
Beekherstel Beekloop51° 19' 6.17" N, 5° 23' 59.32" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Beekherstel Beekloop BmN51° 17' 58.84" N, 5° 23' 38.22" ENetherlands
Belgium
Approved2010Dood hout
6 Vispassages
Beschaduwing
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Water quality
Beekherstel Buurserbeek52° 8' 10.28" N, 6° 42' 34.15" ENetherlandsApproved2015Vergraven van de oeverDood hout inbrengEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Monitoring
Fish
Invertebrates
Flow velocities
Substrate conditions
Width & depth variation
Nutrient concentrations
Oxygen balance
PH
Temperature
Concentration phosphate, Chloride and Nitrogen
Beekherstel Eefsebeek52° 10' 35.61" N, 6° 18' 21.42" ENetherlandsApproved2017StroombaanmaaienHabitat and biodiversity
Monitoring
Fish
Invertebrates
Macrophytes
Flow velocities
Substrate conditions
Width & depth variation
Oxygen balance
PH
Temperature
Beekherstel Keersop51° 23' 52.69" N, 5° 28' 51.07" ENetherlandsApproved2015Hout in de beekBeschaduwingEnvironmental flows and water resources
Hydromorphology
Fish
Macrophytes
Flow velocities
Quantity & dynamics of flow
Width & depth variation
Nutrient concentrations
Oxygen balance
PH
Temperature
Transparency
Beekherstel Lactariabeek51° 33' 52.48" N, 5° 54' 3.19" ENetherlandsDraft2014Dead wood depositionEnvironmental flows and water resourcesChannel pattern/planform
Flow velocities
Beekherstel Leerinkbeek52° 4' 51.16" N, 6° 34' 52.99" ENetherlandsApprovedBeschaduwingDood hout inbrengFlood risk management
Habitat and biodiversity
Monitoring
Fish
Invertebrates
Flow velocities
Substrate conditions
Width & depth variation
Nutrient concentrations
Oxygen balance
PH
Temperature
Concentration phosphate, Chloride and Nitrogen
Beekherstel Ramsbeek52° 4' 40.23" N, 6° 41' 26.07" ENetherlandsApprovedBeschaduwingDood hout inbrengHabitat and biodiversity
Monitoring
Fish
Invertebrates
Flow velocities
Substrate conditions
Width & depth variation
Oxygen balance
PH
Temperature
Concentration phosphate, Chloride and Nitrogen
Beekherstel Reusel Baarschot-Diessen51° 27' 28.81" N, 5° 10' 41.09" ENetherlandsApproved1 January 2014StroombaanmaaienTraditioneel BeekherstelEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Fish
Macrophytes
Flow velocities
Width & depth variation
Nutrient concentrations
Oxygen balance
PH
Salinity
Temperature
Transparency
Beekherstel Willinkbeek51° 59' 7.40" N, 6° 44' 40.31" ENetherlandsApproved2019Puinbestorting verwijderdEnvironmental flows and water resources
Habitat and biodiversity
Monitoring
Width & depth variationOxygen balance
PH
Temperature
Beekherstel Zuidelijk Afwateringskanaal52° 10' 46.91" N, 6° 31' 44.65" ENetherlandsApproved2017StroombaanmaaienHabitat and biodiversity
Monitoring
Fish
Invertebrates
Flow velocities
Substrate conditions
Width & depth variation
Oxygen balance
PH
Temperature
Concentration phosphate, Chloride and Nitrogen
Beentjesgraven52° 35' 45.38" N, 6° 15' 54.24" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Water quality
Belford Natural Flood Management Scheme, Northumberland55° 35' 51.54" N, 1° 49' 42.16" WEnglandApproved2007leaky woody damsFlood risk management
Habitat and biodiversity
Land use management - agriculture
Monitoring
Water quality
Bell Green Weir fish passage51° 25' 55.22" N, 0° 1' 48.46" WEnglandDraftWeir modificationImproving fish migrationFisheries
Belton Floodplain Reconnection and River Restoration52° 56' 11.52" N, 0° 37' 33.10" WEnglandApproved9 January 2017Channel narrowing
Bank lowering
Gravell added
Tree Hinging
Floodplain lowering
scrape added
floodplain roughening
Beaver dam analogue.
Flood risk management
Habitat and biodiversity
Social benefits
Beltringharder Koog Regulated Tidal Exchange Scheme54° 32' 56.43" N, 8° 53' 39.32" EGermanyApprovedHabitat and biodiversity
Estuary
Marine
Fish
Invertebrates
Phytoplankton
Continuity of sediment transport
Beneden Regge52° 28' 42.71" N, 6° 26' 28.41" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Monitoring
Water quality
Beneden-Berkel52° 9' 15.66" N, 6° 17' 50.82" ENetherlandsApproved1 September 2013Habitat and biodiversity
Land use management - agriculture
Water quality
Beneden-Leeuwen-Side channel51° 53' 18.60" N, 5° 31' 41.12" ENetherlandsApproved1 January 1994Bank reprofilingCreation of backwater
Side channel created
More natural water retentionHabitat and biodiversity
Monitoring
Water quality
Fish: Age structure
Invertebrates
Macrophytes
Beverley Brook Flow control structures51° 27' 56.77" N, 0° 15' 8.12" WEnglandDraftModelling
Monitoring strategy
Environmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Beverley Brook d/s of Rock’s Lane51° 28' 10.99" N, 0° 14' 46.77" WEnglandDrafthabitat improvementsTree planting
Creation of backwaters
coves and bays construction
Reedbed creation
Fisheries
Flood risk management
Habitat and biodiversity
Social benefits
Urban
Beverley Park51° 24' 17.25" N, 0° 14' 51.99" WEnglandDraft1 January 2008Bank reprofilingHabitat creation
Cut back of trees
Creation of wetland
Floodplain reconnection
Restoring riparian vegetation
Channel realignmentFlood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Water quality
Urban
Big Yellow51° 27' 18.27" N, 0° 20' 13.76" WEnglandDraft1 January 2010DeculvertingEconomic aspects
Habitat and biodiversity
Bijloop51° 32' 34.38" N, 4° 42' 24.91" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Water quality
Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras50° 17' 27.61" N, 2° 46' 39.13" EFranceApproved1 January 20091 January 2012Removal of metal sheet piles
installation of bio-engeneering bank protection
Helophytes planted
Installation of geotextile
Gabion bed
Planting of helophytes at the foot of banks
Seeding of work areas with a mix of herbaceous plant
restoration of wooded areas by planting white willows
Elimination of the invasive species found on site
Creation of pond
Habitat and biodiversity
Water quality
Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec48° 39' 34.04" N, 5° 58' 36.41" EFranceApproved1 September 20111 December 2011Removal of metal sheet piles
Installation of geotextile
Planting of helophytes at the foot of banksEnvironmental flows and water resources
Habitat and biodiversity
Birkin Brook Habitat Improvements, Cheshire53° 20' 53.71" N, 2° 21' 14.40" WEnglandDraft4 January 2018Fisheries
Habitat and biodiversity
Blackbrook Slow the Flow, St Helens53° 28' 3.93" N, 2° 42' 3.44" WEnglandApproved2012leaky woody damsFlood risk management
Habitat and biodiversity
Hydromorphology
Water quality
Blackhorse Lane Waterfront Park51° 35' 24.87" N, 0° 2' 25.44" WEnglandDraft1 January 2008DeculvertingFlood risk management
Habitat and biodiversity
Social benefits
Blackwater River Habitat Enhancements & Fish Passage51° 22' 32.59" N, 0° 57' 3.58" WEnglandApproved12 November 2014Introducing large woody debris
Adding sinuosity
Improvement of natural flows
Habitat enhancement
Improving fish migration
Environmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Land use management - agriculture
Water quality
Blake Avenue, Mayes Brook51° 31' 55.86" N, 0° 6' 1.16" EEnglandDraftBank reprofilingReedbed creationUK BAP habitat creation/restorationFlood risk management
Blauwe Kamer51° 56' 57.64" N, 5° 36' 28.20" ENetherlandsApprovedHabitat and biodiversity
Bleinheim Palace Project51° 52' 39.49" N, 1° 29' 42.45" WEnglandApproved1 September 2005Planting
Creation of pools and riffles
Introduction of spawning gravels
Creation of backwatersChannel narrowingHabitat and biodiversity
Hydromorphology
Water quality
Bockhampton Enhancement50° 42' 41.75" N, 2° 23' 58.60" WEnglandDraftEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Bocking Blackwater River Restoration51° 53' 8.66" N, 0° 33' 37.43" EEnglandApproved1 August 2012Soft engineering solutions
Bank improvement
Channel reprofiling
Bank reprofiling
Erosion protection
Creation of backwaters
Creation of wetland
Creation of pond
Habitat and biodiversity
Water quality
Urban
Bocq river (Walphy - LIFE project)50° 19' 21.02" N, 5° 0' 30.92" EBelgiumApproved1 January 200931 December 2013Barrier removalCreation of fish spawn nursing places
Improvement culvert bed
Adding sinuosityHabitat and biodiversity
Hydromorphology
Monitoring
Boldersbeek52° 0' 6.69" N, 6° 46' 33.76" ENetherlandsDraftEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Water quality
Bonesgate Phase 251° 22' 7.96" N, 0° 16' 35.42" WEnglandDraft1 January 2008Bank reprofilingCreation of pondCreation of meandersFisheries
Habitat and biodiversity
Social benefits
Boosting slivso55° 10' 0.00" N, 9° 29' 0.00" EDenmarkApproved1 January 1999Creation of dike
Introduction of gravel
Creation of wetland
Creation and flooding of lake
Land use management - agriculture
Habitat and biodiversity
Monitoring
Water quality
Fish: Abundance
Fish: Species composition
Invertebrates
Macrophytes
Nutrient concentrations
Borrowash fish pass52° 54' 6.21" N, 1° 23' 58.48" WEnglandApproved2 January 201221 September 2012Larinier fish passFisheries
Boston Manor51° 29' 20.60" N, 0° 19' 10.31" WEnglandDraftCreation of wetlandHabitat and biodiversity
Boulder Pool and Plough Lane51° 25' 44.10" N, 0° 11' 17.78" WEnglandDraft1 January 2008Bank reprofilingCreation of backwaterFlood risk management
Habitat and biodiversity
Social benefits
Bourne End Recreation Ground River Enhancement Project51° 34' 31.53" N, 0° 42' 20.83" WEnglandApproved4 May 201524 February 2016Creation of pools
Fish habitat restoration
Introducing large woody debris
Habitat restoration
Habitat creation
Tree management
Channel narrowing
Re-meandering
Environmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Social benefits
Urban
Boven-Dommel51° 17' 11.16" N, 5° 26' 19.89" ENetherlandsDraftHabitat and biodiversity
Water quality
Bow Brook Floodplain Restoration52° 7' 25.23" N, 2° 6' 30.12" WEnglandDraftFisheries
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Water quality
Bow Brook Living Landscape52° 12' 38.37" N, 2° 5' 7.23" WEnglandApprovedIntroducing large woody debris
Soft erosion solutions
Bank reprofiling
Cattle drinkers
Creation of wetland
Fencing
Tree planting
Pollarding
Control of invasive species
Arable reversion to wildflower meadow
Soil Health Plan
Fisheries
Habitat and biodiversity
Land use management - agriculture
Monitoring
Water quality
Bowston Weir Removal54° 21' 51.71" N, 2° 46' 31.47" WEnglandApproved16 June 201630 September 2020removal of dams
Rock ramp construction
Channel naturalisationFlood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Channel pattern/planform
Continuity for organisms
Continuity of sediment transport
Quantity & dynamics of flow
Bat Survey
Bathymetric Survey
Flood risk management
general assessment of habitat quality and diversity (repeat photography)
Bowthorpe Meadow, River Yare52° 37' 32.51" N, 1° 13' 6.40" EEnglandDraft1 April 2018Habitat and biodiversity
Brackenhurst Natural Flood Management53° 3' 52.89" N, 0° 58' 4.46" WEnglandApproved2016establishment of woodlandRunoff pathway managementFlood risk management
Habitat and biodiversity
Land use management - agriculture
Land use management - forestry
Monitoring
Braid Burn at Inch Park55° 55' 46.46" N, 3° 9' 13.24" WScotlandApproved1 January 20091 August 2012Embankment creationFloodplain reconnectionAdding sinuosityFlood risk management
Habitat and biodiversity
Brent Lodge Park Improvement51° 31' 18.07" N, 0° 21' 8.93" WEnglandDraft1 January 2008Deculverting
Removing of concrete structures
Reedbed creationCreation of backwaterEconomic aspects
Environmental flows and water resources
Habitat and biodiversity
Brent River Improvement Project- Brent Lodge Park to Ruislip Road Eastruislip51° 31' 26.82" N, 0° 20' 54.36" WEnglandDraft4 January 2018Habitat and biodiversity
Brent River Park Phase II51° 33' 12.56" N, 0° 15' 59.42" WEnglandApproved1 January 2010Removing of concrete structuresCreation of meandersEconomic aspects
Flood risk management
Habitat and biodiversity
Social benefits
Brightside Weir Fish Pass53° 24' 24.42" N, 1° 25' 9.56" WEnglandApprovedCreation of fish passesFisheries
Habitat and biodiversity
Urban
Bringing Back the Bulbourne51° 44' 38.07" N, 0° 29' 9.53" WEnglandApproved1 June 2013Re-grading
Bed raising
Scrapes
Floodplain reconnection
Channel narrowing
Introducing large woody debris
Fisheries
Habitat and biodiversity
Land use management - agriculture
Monitoring
Social benefits
Water quality
Bristol Frome Diffuse Pollution Project51° 34' 46.61" N, 2° 26' 59.64" WEnglandApprovedAgricultural/Farming improvements
improvement of structure of agricultural land
Farm advice and plansHabitat and biodiversity
Land use management - agriculture
Water quality
Broadwater Brook50° 49' 32.02" N, 0° 21' 3.73" WEnglandApproved1 January 201731 December 2021Channel realignmentChannel realignment
Conservation measures and environmental improvement
Creation of multi stage channel
Habitat creation
Channel realignment
Creation of new channel
Habitat creation
Habitat restoration
Improvement of channel morphology
Agricultural business changed its way of working
Arable reversion to wildflower meadow
Clean-up days
Diffuse pollution mitigation
Easier management
Ensuring biodiversity
Monitoring strategy
Habitat and biodiversity
Land use management - agriculture
Social benefits
Water quality
Urban
Fish: Species composition
Invertebrates: Taxonomic composition
Continuity of sediment transportNutrient concentrations
Oxygen balance
Bat Survey
Birds
Concentration phosphate, Chloride and Nitrogen
Macroinvertebrates (IBMWP)
Broadway Fields/ Seagers Distillary51° 28' 22.65" N, 0° 1' 20.17" WEnglandApprovedBank reprofiling
Removing of concrete structures
Economic aspects
Fisheries
Habitat and biodiversity
Broom Road Recreation Ground51° 25' 19.66" N, 0° 18' 25.79" WEnglandApproved1 January 2009Bank reprofiling
Removing of sheet piling
Flood risk management
Habitat and biodiversity
Building with Nature51° 14' 5.53" N, 6° 8' 42.43" ENetherlandsDraftFlood risk management
Habitat and biodiversity
Land use management - forestry
Monitoring
Peat
Buiten Ooij51° 51' 32.40" N, 5° 53' 42.00" ENetherlandsApproved1 January 2008Water release into floodplain in winter
Closing of sluice in summer
Future floodplain lowering
Creation of side channelmore natural reservoir releasesEconomic aspects
Habitat and biodiversity
Monitoring
Water quality
Fish: Abundance
Fish: Species composition
Invertebrates
Macrophytes
Continuity of sediment transport
Bullhead Dock and Bellamy’s Wharf - Rotherhithe51° 30' 6.55" N, 0° 3' 12.56" WEnglandDraftIntroducing large woody debrisReedbed creationNew shingle beachEconomic aspects
Flood risk management
Habitat and biodiversity
Bures Mill fish by-pass51° 58' 1.59" N, 0° 46' 51.97" EEnglandApprovedFish by-pass channelFisheries
Burn of Balmaleedy Restoration, Marykirk56° 46' 50.60" N, 2° 30' 28.16" WScotlandApproved1 March 201030 September 2019Step-pool section at d/s end of restored reachRe-meanderingFlood risk management
Burn of Mosset, Forres57° 35' 43.20" N, 3° 35' 30.93" WScotlandApproved1 January 200831 December 2008Create breaches in the bankFloodplain reconnection
Riparian planting
Channel naturalisationFisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Burton Weir (Upper) Fish Pass Project52° 48' 22.64" N, 1° 37' 22.31" WEnglandApproved1 July 20151 March 2015Weir removal/modification for easement of fish passageHabitat and biodiversity
Bury Lodge Wetlands51° 37' 56.14" N, 0° 4' 30.65" WEnglandApproved6 August 2012Creation of wetlandEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Monitoring
Social benefits
Water quality
Urban
Butter Hill Phase 251° 22' 16.38" N, 0° 9' 35.03" WEnglandApproved31 October 2010Weir notched
Bank reprofiling
Introduction of gravel
Introducing large woody debris
Planting of native species
Large scale planting of native speciesChannel narrowingFisheries
Habitat and biodiversity
Social benefits
Urban
Buulder Aa51° 17' 30.17" N, 5° 35' 5.97" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Buzzards Mouth Creek51° 31' 10.99" N, 0° 6' 13.97" EEnglandDraftEconomic aspects
Habitat and biodiversity
CASE STUDY OF QUALITY IMPROVEMENT IN SHROPSHIRE WILDLIFE TRUST AREA52° 37' 3.87" N, 2° 43' 13.73" WEnglandDraftLand use management - agriculture
Water quality
Cain weir removal52° 46' 2.00" N, 3° 16' 1.36" WWalesDraftEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Water quality
Camargue’s former saltworks43° 25' 2.33" N, 4° 37' 55.88" EFranceApproved1 January 2008Reconnection between the sea and the lagoons
artificial bird nesting islands.
installation of water sluices
wetland managementEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Cardiff Rivers Group51° 31' 9.30" N, 3° 15' 15.59" WWalesDraftEnvironmental flows and water resources
Habitat and biodiversity
Social benefits
Water quality
Urban
Carnon River: Abandoned Metal Mines50° 14' 23.41" N, 5° 8' 25.73" WEnglandApproved1 July 2013Remediation TreatmentEnvironmental flows and water resources
Habitat and biodiversity
Monitoring
Water quality
Castle Acre Rehabilitation Project52° 41' 59.91" N, 0° 41' 24.59" EEnglandApprovedCreation of pools and rifflesChannel narrowingHabitat and biodiversity
Castle Irwell Urban Wetland53° 30' 29.43" N, 2° 16' 10.91" WEnglandApproved13 August 201410 July 2017Introducing large woody debris
Floodplain reconnection
Floodplain creation
Buffer strips
Habitat creation
Habitat managementFlood risk management
Habitat and biodiversity
Social benefits
Urban
Catford Greyhound Stadium51° 26' 50.72" N, 0° 1' 29.03" WEnglandDraft1 January 2008Deflectors
Introduction of gravel
Habitat and biodiversity
Chambers Wharf51° 30' 2.79" N, 0° 3' 56.49" WEnglandApproved1 January 200831 December 2013Bank improvementremoval of jettyBrownfield land regeneration
SUDS
green roofs
nesting boxes
roosting posts
Flood risk management
Habitat and biodiversity
Spatial planning
Urban
Estuary
Channel Sea51° 40' 28.93" N, 0° 0' 46.14" WEnglandDraft1 January 2008Reedbed creationHabitat and biodiversity
Charlton St Peter A 851° 18' 21.85" N, 1° 49' 42.27" WEnglandApproved1 January 2009Bed raising
Weir modification
Weir removal
Remeandering
Modifying bank protection
Lowering of embankments
Riparian planting
Channel narrowing
Enhancing flow diversity
Fencing
Introducing large woody debris
Re-instatement of old course
altering flow splits
Fisheries
Flood risk management
Habitat and biodiversity
Chase Nature Reserve51° 33' 30.77" N, 0° 10' 23.23" EEnglandApproved1 January 2008FencingCreation of backwaterFisheries
Habitat and biodiversity
Chelmer Valley Local Nature Reserve51° 44' 41.26" N, 0° 28' 26.23" EEnglandApprovedCreation of bermsLowering of embankments
Floodplain reconnection
Riparian habitat restoration
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Water quality
Cheriton Stream Restoration Project51° 3' 49.03" N, 1° 10' 23.67" WEnglandDraft1 April 2018Fisheries
Habitat and biodiversity
Chertsey meads51° 23' 15.69" N, 0° 29' 6.78" WEnglandDraft1 January 2010Bank reprofiling
Introduction of gravel
Habitat and biodiversity
Hydromorphology
Chigwell Brook51° 37' 12.52" N, 0° 4' 26.67" EEnglandDraft1 January 2008Deculverting
Toe protection
Bank reprofiling
Flood risk management
Habitat and biodiversity
Chinbrook Meadows Wetlands51° 25' 36.24" N, 0° 1' 36.91" EEnglandApproved2016Partial diversion of riverWetland habitatPlanting wildflower mixes
Riparian tree planting
plug planting
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Monitoring
Social benefits
Water quality
Urban
Ching Brook at Walthamstow Greyhound Stadium51° 36' 9.95" N, 0° 0' 47.08" WEnglandApproved1 January 2008DeculvertingFlood risk management
Habitat and biodiversity
Social benefits
Chowder Ness Managed Realignment Scheme53° 41' 28.75" N, 0° 28' 53.44" WEnglandApprovedHabitat and biodiversityInvertebrates
Civic Way, Yeading Brook51° 33' 19.80" N, 0° 23' 21.43" WEnglandDraftBank reprofilingHydromorphology
Clayton Vale53° 29' 30.04" N, 2° 10' 36.62" WEnglandApprovedWeir removalFlood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Urban
Clitherow's Island, Brentford eel pass51° 29' 30.02" N, 0° 19' 21.92" WEnglandApproved1 January 2012Creation of fish passesFisheries
Clugston Burn (CASS)54° 53' 16.71" N, 4° 34' 6.00" WScotlandApproved1 July 200531 December 2005Removal of debrisEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Colfes School51° 26' 40.69" N, 0° 1' 49.48" EEnglandApproved1 January 2008Bank reprofiling
Removing of concrete structures
Creation of meandersFisheries
Flood risk management
Habitat and biodiversity
Social benefits
Colliers Row51° 35' 36.69" N, 0° 9' 14.39" EEnglandDraft1 January 2010Bank reprofiling
Deflectors
Habitat and biodiversity
Social benefits
Colne Brook51° 30' 55.67" N, 0° 29' 27.80" WEnglandDraft1 January 2008Tree managementHabitat and biodiversity
Social benefits
Colne Water Restoration Project53° 51' 12.01" N, 2° 9' 26.78" WEnglandApproved1 July 20121 March 2015Tree planting
Bank stabilisation
Removing barriers to water organisms migration in the riverEconomic aspects
Habitat and biodiversity
Hydromorphology
Social benefits
Water quality
Columbia Wharf51° 38' 37.22" N, 0° 1' 50.91" WEnglandDraftCreation of pondEconomic aspects
Habitat and biodiversity
Social benefits
Community Wetlands52° 33' 52.05" N, 1° 41' 17.65" WEnglandApproved2005Creation of wetland
Scrapes
Floodplain spillways
Floodplain reconnection
water meadow creation
Reedbed creationHabitat and biodiversity
Water quality
Compton Island and Meanders51° 3' 40.27" N, 1° 30' 53.54" WEnglandDraft1 April 2018Flood risk management
Habitat and biodiversity
Coniston Cold weir removal53° 59' 27.85" N, 2° 8' 16.41" WEnglandDraftFisheries
Habitat and biodiversity
Coniston Copper Mines54° 24' 10.44" N, 3° 4' 53.73" WEnglandDraftMonitoring
Connswater Community Greenway54° 35' 54.47" N, 5° 53' 27.25" WNorthern IrelandApprovedEconomic aspects
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Monitoring
Social benefits
Spatial planning
Water quality
Urban
Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration47° 34' 37.01" N, 14° 35' 20.30" EAustriaApproved1 February 20051 August 2011Creation of gravel banks
Removal of bank reinforcements
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration47° 34' 20.63" N, 14° 20' 12.45" EAustriaApproved1 August 20051 February 2011Creation of gravel banks
Bank improvement
Creation of pools and riffles
Bank stabilisation
Bank protection
Creation of pond
Develop riparian forest
Creation of a new estuaryMonitoring strategyHabitat and biodiversity
Hydromorphology
Land use management - forestry
Monitoring
Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs47° 55' 8.05" N, 1° 5' 12.33" EFranceApproved1 January 199831 December 1998Creation of a bypass
Creation of banks
Installation of a mobile threshold
Installation of a valve rack
Fisheries
Habitat and biodiversity
Social benefits
Water quality
Corfe River50° 39' 4.09" N, 2° 2' 59.46" WEnglandDraft1 April 2018Habitat and biodiversity
Cornmill Gardens (QUERCUS)51° 27' 47.52" N, 0° 0' 48.90" WEnglandApproved31 December 2007Removal of concrete banks and bed
Bank reprofiling
Buffer stripsImprovement of channel morphologySocial benefits
Spatial planning
County Gardens, Mayes Brook51° 31' 47.28" N, 0° 5' 39.90" EEnglandDraftCreation of wetlandCreation of backwaterFlood risk management
Habitat and biodiversity
Coutershaw FIP Project50° 57' 50.39" N, 0° 37' 13.66" WEnglandDraft4 January 2018Fisheries
Habitat and biodiversity
Craigton Riparian and NFM Orchard Planting56° 13' 7.23" N, 3° 57' 11.97" WScotlandApproved1 August 20138 March 2014Creation of wet woodland
orchard
Economic aspects
Fisheries
Flood risk management
Habitat and biodiversity
Social benefits
Crane Meadows Meander Connections51° 28' 26.93" N, 0° 24' 51.32" WEnglandApprovedRiffle creationRemoval of channel blockagesEnvironmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Urban
Crane Park51° 26' 35.94" N, 0° 22' 39.05" WEnglandApproved1 January 2008Reedbed creation
Tree management
UK BAP habitat creation/restorationHabitat and biodiversity
Cranford Park Phase 251° 29' 42.31" N, 0° 24' 44.96" WEnglandDraft1 January 2010DeflectorsTree managementHabitat and biodiversity
Cray River Enhancement51° 27' 14.52" N, 0° 11' 44.38" EEnglandDraft1 January 2009Tree managementEnvironmental flows and water resources
Habitat and biodiversity
Social benefits
Creamery Weir fish barrier easement54° 52' 23.38" N, 4° 4' 4.97" WScotlandApproved1 September 2014Weir removalFisheries
Habitat and biodiversity
Hydromorphology
Creation of a Constructed Farm Wetland52° 37' 9.67" N, 2° 43' 17.76" WEnglandDraftHabitat and biodiversity
Land use management - agriculture
Water quality
Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze48° 35' 12.42" N, 6° 29' 12.43" EFranceApproved1 May 200731 August 2007Construction of flood channels
Removal of material
Pond creation
Side channel creation
setting up of check valves & pumping stations
Tree planting
Planting of helophytes at the foot of banks
Channel wideningFlood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Urban
Crosthwaite Deculverting54° 18' 50.25" N, 2° 51' 13.84" WEnglandDraft1 April 2018Fisheries
Habitat and biodiversity
Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes50° 34' 23.80" N, 2° 19' 28.08" EFranceApproved1 November 201331 December 2015Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds
Creation of a bypass
Riverbed restoration
Bank modification
Adding sinuosityHabitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Social benefits
Water quality
Cuckolds Haven Nature Area51° 31' 44.86" N, 0° 4' 34.14" EEnglandApproved1 October 200431 March 2006Riparian plantingHabitat and biodiversity
Social benefits
Urban
Cuddington Park51° 22' 1.88" N, 0° 14' 24.80" WEnglandDraft1 January 2008Habitat and biodiversity
Spatial planning
Cudworth dyke restoration project53° 36' 11.80" N, 1° 25' 23.83" WEnglandApproved10 January 2011Creation of meandersEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Water quality
Urban
Fish: Species composition
Invertebrates
Macrophytes
Oxygen balance
Specific non-synthetic pollutants
Cumbria Angler Engagement54° 26' 40.26" N, 3° 27' 41.74" WEnglandDraft
Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria54° 36' 52.30" N, 3° 16' 47.61" WEnglandApproved1 March 20141 September 2014River channel diversion
Floodplain reconnection
Habitat creation
Tree plantingFisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Social benefits
Cumbria River Restoration Strategy54° 34' 38.04" N, 2° 47' 50.94" WEnglandApproved3 March 2014Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Dagenham Brook de-silting51° 34' 36.36" N, 0° 2' 25.84" WEnglandApproved1 January 2009Removal of sedimentFlood risk management
Habitat and biodiversity
Dagenham Washlands Phase 251° 31' 49.30" N, 0° 9' 55.58" EEnglandApproved1 January 2008Bank reprofilingCreation of wetlandCreation of backwater
Creation of meanders
UK BAP habitat creation/restorationEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Social benefits
Darent Valley Path51° 26' 5.55" N, 0° 13' 29.03" EEnglandDraft1 January 2011Bank reprofilingCreation of meandersEconomic aspects
Habitat and biodiversity
Darley Abbey Fish Pass Project52° 56' 38.71" N, 1° 28' 21.04" WEnglandApproved1 July 20121 March 2015Creation of fish passesEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Day Brook Rain Gardens52° 59' 31.17" N, 1° 8' 43.60" WEnglandApprovedSustainable urban drainage ponds (SUDs)Flood risk management
Habitat and biodiversity
Monitoring
Social benefits
Urban
Day Brook Restoration - Gedling52° 59' 38.90" N, 1° 8' 15.42" WEnglandApprovedChannel reprofiling
Recovery of channel morphology
Floodplain reconnectionChannel naturalisation
Re-meandering
Flood risk management
Habitat and biodiversity
Urban
Ddu Restoration Project52° 57' 36.89" N, 4° 8' 28.76" WWalesDraft1 June 2005Boulder restoration
Addition of substrate and in channel features
Fencing of riparian zoneCreation of fish passesDeculvertingAgricultural business changed its way of workingFisheries
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Monitoring
De Doorbraak52° 18' 48.01" N, 6° 37' 5.22" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Water quality
De-culverting Moselle Brook at Lordship Recreation Ground51° 35' 40.76" N, 0° 5' 11.85" WEnglandApprovedCulvert replacement/repair
Bank reprofiling
Riparian planting
Sustainable urban drainage ponds (SUDs)
DeculvertingHabitat and biodiversity
Social benefits
InvertebratesRiver Habitat Survey
Debenham Flood Storage Options - flood modelling and economic assessment52° 13' 30.36" N, 1° 11' 30.30" EEnglandDraftRunoff pathway managementFlood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Water quality
Defra Strategic Environmental Partnership Project (DSEPP) 201151° 59' 45.14" N, 3° 13' 56.37" WWales
England
Approved2011Joining of River TrustsFisheries
Habitat and biodiversity
Land use management - agriculture
Water quality
Delivering Multiple Benefits for Water on Foston Brook52° 56' 20.99" N, 1° 44' 18.42" WEnglandApproved30 June 2015Fenced off riverbankHardened crossing points
drinking bays
Farm advice and plansLand use management - agriculture
Water quality
Derbyshire Habitat Improvements52° 54' 2.45" N, 1° 23' 6.25" WEnglandDraft1 April 2018Habitat and biodiversity
Deurningerbeek52° 18' 43.23" N, 6° 48' 29.15" ENetherlandsDraftHabitat and biodiversity
Monitoring
Water quality
Devon Beaver Project and River Otter Beaver Trail50° 43' 13.54" N, 3° 47' 13.39" WEnglandApproved2011leaky woody damsEconomic aspects
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Social benefits
Water quality
Diffusing the Issue in Rural Ribble - River Loud53° 51' 1.81" N, 2° 37' 20.28" WEnglandApprovedTree plantingImproving fish migrationEconomic aspects
Habitat and biodiversity
Social benefits
Water quality
Diffusing the Issue in rural Ribble53° 54' 39.38" N, 2° 21' 45.15" WEnglandApproved1 July 20121 March 2015Bank reprofiling
Reduce diffuse pollution
Barrier removal
Small scale easement installation
Tree plantation
Creation of fish passes
Fish habitat restoration
Farm infrastructure interventions
UK BAP habitat creation/restoration
Fencing
Non/agricultural business changed its way of working
Economic aspects
Fisheries
Habitat and biodiversity
Land use management - agriculture
Social benefits
Water quality
Diffusing the Issue in rural Ribble - Easington53° 57' 19.08" N, 2° 24' 23.30" WEnglandApproved1 July 20121 March 2015Bank reprofiling
Reduce diffuse pollution
Weir removal/modification for easement of fish passage
Tree planting
Fencing
Farm infrastructure interventions
UK BAP habitat creation/restoration
Agricultural business changed its way of workingEconomic aspects
Fisheries
Habitat and biodiversity
Land use management - agriculture
Social benefits
Water quality
Diffusing the Issue in rural Ribble - Skirden Beck53° 58' 59.78" N, 2° 20' 8.49" WEnglandApproved1 July 20121 March 2015Bank reprofiling
Weir removal/modification for easement of fish passage
Tree planting
Fencing
Farm infrastructure interventions
UK BAP habitat creation/restoration
Agricultural business changed its way of workingEconomic aspects
Fisheries
Habitat and biodiversity
Land use management - agriculture
Social benefits
Water quality
Diffusing the Issue in rural Ribble - Stock Beck53° 56' 1.46" N, 2° 11' 31.00" WEnglandApproved1 July 20121 March 2015Bank reprofilingTree planting
Fencing
Farm infrastructure interventions
UK BAP habitat creation/restoration
Agricultural business changed its way of workingEconomic aspects
Fisheries
Habitat and biodiversity
Land use management - agriculture
Social benefits
Water quality
Diffusing the Issue in rural Ribble - Swanside53° 54' 21.11" N, 2° 15' 55.23" WEnglandApproved1 July 20121 March 2015Bank reprofiling
Reduce diffuse pollution
Barrier removal
Small scale easement installation
Tree plantation
Creation of fish passes
Fish habitat restoration
Farm infrastructure interventions
UK BAP habitat creation/restoration
Fencing
Non/agricultural business changed its way of working
Economic aspects
Fisheries
Habitat and biodiversity
Land use management - agriculture
Social benefits
Water quality
Dinkel Noord52° 24' 47.56" N, 6° 59' 1.40" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Water quality
Diversion of the River Nith55° 22' 42.47" N, 4° 18' 11.36" WScotlandApprovedIntroduction of gravel
Habitat diversification
Bank stabilisation
Bank protection
Containment bund to prevent floodingAddition of boulders to bed
Fish habitat restoration
Economic aspects
Habitat and biodiversity
Invertebrates
Macrophytes
Channel bed morphology.
Substrate particle size/composition.
Dommeldal: cross-border habitat restoration in the Dommel Valley51° 9' 43.64" N, 5° 33' 52.47" EBelgiumApproved
Dorset CPAF Projects50° 45' 18.17" N, 2° 28' 29.23" WEnglandApprovedBuffer strips
Floodplain reconnection
Cut back of treesEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Land use management - agriculture
Monitoring
Social benefits
Water quality
Dove Weir removal53° 2' 0.13" N, 1° 45' 39.48" WEnglandApproved1 July 2010Vegetation cut back
Weir removal
Cut back of trees
Introducing large woody debris
Adding sinuosityHabitat and biodiversity
Hydromorphology
Land use management - agriculture
Monitoring
Spatial planning
Fish: Abundance
Fish: Species composition
Substrate conditions
Dovers Corner51° 31' 14.19" N, 0° 11' 13.31" EEnglandDraftBank reprofilingEconomic aspects
Flood risk management
Habitat and biodiversity
Social benefits
Downham Playing Fields51° 25' 24.06" N, 0° 0' 4.63" EEnglandApprovedHabitat and biodiversity
Social benefits
Urban
Downton Millennium Gardens- Hampshire Avon50° 59' 3.00" N, 1° 45' 32.51" WEnglandDraft1 April 2018Fisheries
Habitat and biodiversity
Drayton52° 30' 55.05" N, 0° 47' 13.34" WEnglandApproved1 December 2011Deflectors
Bank stabilisation
Cattle drinkers
Introduction of gravel
Tree planting
Tree management
Channel narrowingFencingHabitat and biodiversityFish
Invertebrates
Substrate conditions
Dumbreck Marsh & Garrel Burn Restoration55° 58' 24.21" N, 4° 4' 16.63" WScotlandApproved1 April 2016re-meandering
lowland shallow channel form
pool/riffle sequences
Floodplain reconnection with Dumbreck Marsh LNRRe-meanderingEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Social benefits
Urban
Dunruchan Farm Peatland Restoration Project56° 18' 21.83" N, 3° 57' 40.28" WScotlandApproved2015Surface drainage systems improvedFlood risk management
Habitat and biodiversity
Water quality
Dunston Beck Restoration53° 9' 11.91" N, 0° 23' 59.15" WEnglandApproved16 November 201429 March 2017faggot berms
Creation of wooden deflectors
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Social benefits
Durand Close51° 22' 45.02" N, 0° 9' 51.37" WEnglandDraft1 January 2008Bank reprofilingFisheries
Habitat and biodiversity
Social benefits
Dysart Park, Grantham Habitat Improvement52° 54' 10.45" N, 0° 37' 44.31" WEnglandApproved9 January 2020Day lighting and addition of woody material to form narrowing bermsHabitat and biodiversity
Démantèlement de l’ouvrage du Pont Fourneau sur la Selle50° 6' 14.19" N, 3° 32' 39.25" EFranceApproved1 September 201028 February 2011Barrier removal
Creation of mini-treshold
Installation of fish caches
Installation of geotextile
Planting
Habitat and biodiversity
Hydromorphology
Démantèlement de neuf ouvrages sur le cours de l’Aa50° 37' 36.94" N, 2° 6' 49.71" EFranceApproved1 July 200930 September 2009Dismantling of the gates that block the water current
Creation of fish pass
Bottom racks and banks were kept in order to prevent erosion
One gate was kept in the river to prevent erosion
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas48° 5' 41.48" N, 2° 47' 46.94" WFranceApproved1 September 200931 December 2011Installation of a distribution structure and monks
Creation of a bypass
Filling of drainage ditches
rehabilitation of ponds
Three tresholds are removed or redevelopped
Removal of ponds
Bank protection
Meandering channelThe level of the water bodies is lowered during two months in summer and are completely drained every three to five years.Flood risk management
Habitat and biodiversity
Land use management - agriculture
EDF Weir removal51° 27' 40.50" N, 0° 11' 38.93" WEnglandDraft1 January 2010Weir removalFisheries
ERCIP - European River Corridor Improvement Plans51° 27' 16.35" N, 0° 1' 8.60" WItaly
Germany
Greece
Romania
England
ApprovedEconomic aspects
Flood risk management
Habitat and biodiversity
Hydropower
Land use management - forestry
Social benefits
Spatial planning
Water quality
East Devon Diffuse Pollution Project50° 46' 35.60" N, 3° 19' 22.10" WEnglandApproved19 August 20151 August 2016Restored species-rich wet grasslandsLand use management - agriculture
Water quality
East Mascalls Fish Pass51° 0' 42.85" N, 0° 3' 18.17" WEnglandApprovedCreation of fish passesFisheries
East Tullos Burn Environment Improvements Project57° 8' 1.19" N, 2° 3' 54.32" WScotlandDraftEconomic aspects
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Water quality
Urban
Eastridge Estate restoration project51° 25' 59.06" N, 1° 32' 51.71" WEnglandApproved1 October 2013Creation of fish passes
Introduction of gravel
lowering river bankChannel narrowing
Introducing large woody debris
Environmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Eau Blanche River (Walphy - LIFE project)50° 5' 21.42" N, 4° 32' 14.20" EBelgiumApproved1 January 200931 December 2014Creation of fish spawn nursing placesHabitat diversificationCreation of meanders
Reconnection of cutoff meander
Habitat and biodiversity
Hydromorphology
Monitoring
Ecclesbourne Farm project52° 59' 34.39" N, 1° 30' 21.07" WEnglandApproved1 April 201431 March 2015Installing riverside fencing
pasture pumps
trackway improvements
Fisheries
Habitat and biodiversity
Land use management - agriculture
Water quality
Eddleston water55° 40' 53.00" N, 3° 12' 6.57" WScotlandApproved20091 May 2013Introducing large woody debris
Embankment renaturalization
Connection to wider floodplain
Floodplain creation
Meandering channelFlood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Monitoring
Social benefits
Water quality
Eden Crayfish Restoration Project54° 36' 24.80" N, 2° 36' 16.53" WEnglandApproved20 July 2012Planting
Installing riverside fencing
Agricultural/Farming improvements
Best practice for river habitat restoration
Economic aspects
Fisheries
Habitat and biodiversity
Land use management - agriculture
Monitoring
Social benefits
Water quality
Eden crayfish eDNA project54° 49' 8.31" N, 2° 41' 27.32" WEnglandDraftHabitat and biodiversity
Hydromorphology
Water quality
Edgeware Brook, Honeypot Lane51° 36' 11.41" N, 0° 17' 43.01" WEnglandDraftDeculvertingHabitat and biodiversity
Eel Pass over tilting weir at Ravensbury Park51° 23' 52.10" N, 0° 11' 3.91" WEnglandDraft1 January 2012Weir modificationFisheries
Effacement du seuil de Carayon sur le Thoré43° 29' 24.37" N, 2° 22' 35.68" EFranceApproved1 July 201130 November 2011Removal of treshold
Removal of supply canal to protect the banks
Arches have been cleared
Placement of stone walls
dry work by setting up a cofferdam to temporarily deflect flow of the watercourse
Realization of an electric fishing of backupFlood risk management
Habitat and biodiversity
Hydropower
Hydromorphology
Land use management - agriculture
Urban
Effacement du seuil de Chelles Basse sur le Miodet45° 40' 32.03" N, 3° 28' 58.20" EFranceApproved1 June 201031 July 2010Abundant sand was being put on the banks
Barrier removal
Blocks were used to diversify the flow
Cutting trees that could be a potential danger
Setting up of a diversion channel
Flood risk management
Habitat and biodiversity
Hydropower
Hydromorphology
Land use management - agriculture
Effacement du seuil du Moulin d’Hatrize sur l’Orne49° 11' 37.04" N, 5° 54' 30.09" EFranceApproved1 March 201131 October 2011Removal of spillway
Destruction of large part of the dike
Implantation of vegetated banquettes
Bank stabilisation
Planting
Creation of meanders
Development of a flow control structure
tightening of the minor bed
Flood risk management
Habitat and biodiversity
Land use management - agriculture
Social benefits
Effacement du seuil du moulin du Bourg sur le Vicoin47° 59' 10.47" N, 0° 47' 0.73" WFranceApproved1 June 201131 October 2012Removal of central slab
valves and spillway
Creation of ramp
Placing of mini-treshold in order to stabilise banks
Tree planting
Planting of grass
Environmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste49° 0' 55.32" N, 6° 58' 12.02" EFranceApproved1 September 200930 November 2009Creation of notches
Planting of grass
Tree planting
Laying of drinking troughs and the creation of pits to house the fish fauna.Maintenance of anchorages and other structuresFlood risk management
Habitat and biodiversity
Hydromorphology
Water quality
Effacement partiel de cinq seuils sur le ruisseau du Bagas43° 37' 9.69" N, 2° 5' 24.41" EFranceApproved1 October 200930 November 2009Partially deletion of barriers
Building of armourstone downstream of the structure was built to consolidate the bank and create a channel preferential flow to guide the fish
The work was carried out dry by temporary diversion of the watercourse (cofferdam
pumping and return of water downstream site) to limit their impact on the environment.
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Effacement partiel du seuil Cros sur la Dunière45° 13' 4.30" N, 4° 20' 31.77" EFranceApproved1 August 200931 December 2009Removal of a part of the dam up to 1 m
Installation of three mini tresholdsto prevent erosion
realization of a fishery backup and dry work with the installation of a cofferdam to temporarily deflect the flows
Installation of geotextile
Bank protection
Flood risk management
Habitat and biodiversity
Hydromorphology
Effacement partiel du seuil de Vas sur le Céans44° 18' 50.61" N, 5° 41' 36.56" EFranceApproved1 October 200731 October 2007Partially deletion of barriers
Deposition of blocks to counter erosion and create a diverse profile
Preservation of side walls to prevent erosionEconomic aspects
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Elgin Flood Alleviation Scheme57° 39' 10.35" N, 3° 19' 1.06" WScotlandApproved1 January 2005Bank improvement
Channel reprofiling
Creation of berms
Depth variation
Lowering of floodplain
Creation of wetland
Removal of embankments
Creation of new channelEconomic aspects
Fisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Water quality
Urban
Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes48° 5' 46.46" N, 0° 21' 26.44" WFranceDraft1 May 201031 August 2010Emptying reservoir
Removal of flap gate
Removal of spillway
Dam removal
Creation of side leats
Implementation of distribution structures
Planting of banksEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Social benefits
Water quality
Elmbridge Meadows51° 23' 32.76" N, 0° 16' 23.42" WEnglandDraftFisheries
Flood risk management
Habitat and biodiversity
Emergency works after breach on Lough Neas Drain (Cloghcor)54° 53' 4.54" N, 7° 24' 10.74" WNorthern IrelandApprovedBed raising
rock groynes
Channel reprofiling
Creation of pools and riffles
Removal of a flap valveFisheries
Flood risk management
Emmanuel’s Common Reconnection Project52° 43' 12.08" N, 0° 42' 57.57" EEnglandApproved2 June 201414 November 2014Reinstating old channel
Remeandering
Fisheries
Habitat and biodiversity
Hydromorphology
Ems floodplain52° 22' 38.64" N, 7° 20' 11.26" EGermanyApproved1 January 2004Removal of bank reinforcementsDevelop riparian forest
Protect/restore riparian zone
Channel widening
Lengthening of channel
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Fish: Abundance
Fish: Species composition
Channel pattern/planformPublic use of trails
Enfield Town Park Wetlands51° 39' 1.43" N, 0° 5' 14.16" WEnglandDraftEnvironmental flows and water resources
Flood risk management
Social benefits
Urban
Enhancement of the River Crouch following a pollution incident51° 37' 12.15" N, 0° 32' 4.89" EEnglandApproved21 December 201210 October 2014Bank reprofilingWoody-debris flow deflectorsFisheries
Habitat and biodiversity
Hydromorphology
Social benefits
Enhancements in Hampstead Heath51° 33' 45.32" N, 0° 9' 38.93" WEnglandDraft1 January 2008Creation of wetlandFlood risk management
Habitat and biodiversity
Social benefits
Enler River enhancement project54° 35' 23.38" N, 5° 47' 23.51" WNorthern IrelandApproved4 November 201325 April 2014Deflectors
Creation of groynes
Riffle creation
Introduction of spawning gravels
Fish habitat restoration
Fisheries
Habitat and biodiversity
Hydromorphology
FishChannel pattern/planform
Freshwater flow regime
Width & depth variation
Ennerdale Mill Weir Removal54° 28' 31.05" N, 3° 31' 33.80" WEnglandApproved4 January 201731 July 2019Weir removalEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Urban
Essex Healthy Headwaters River Restoration Project52° 0' 6.19" N, 0° 34' 49.63" EEnglandApproved1 July 20121 March 2015Bank reprofiling
Diversification of in-channel features
Farm infrastructure interventionsEconomic aspects
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Essex Wharf51° 33' 45.82" N, 0° 2' 45.69" WEnglandDraft1 January 2008Reedbed creationEconomic aspects
Fisheries
Habitat and biodiversity
Social benefits
European Fisheries Fund51° 46' 29.74" N, 2° 52' 33.33" WWalesApproved1 September 20091 August 2012Habitat restoration
Removal of fish barriers
Cut back of trees
Fisheries
Habitat and biodiversity
Evenlode Catchment Project51° 51' 42.97" N, 1° 36' 17.84" WEnglandApproved2016Runoff pathway managementFlood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Water quality
Exmoor Mires Partnership51° 8' 26.76" N, 3° 44' 52.73" WEnglandApproved2010Moorland restoration
Surface drainage systems improved
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Social benefits
Water quality
Peat
Eycott Hill54° 39' 36.00" N, 2° 56' 8.16" WEnglandApproved2014Surface drainage systems improvedFlood risk management
Habitat and biodiversity
Hydromorphology
Fairham Brook Restoration Project52° 52' 10.74" N, 1° 10' 9.04" WEnglandApproved2 April 201231 March 2015Diversification of in-channel features
Creation of fish passes
Cut back of trees
Tree managementEnvironmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Land use management - agriculture
Water quality
Fairlop Plain and Fairlop Water51° 36' 41.72" N, 0° 7' 31.25" EEnglandDraftDeculverting
Removing of concrete structures
Habitat and biodiversity
Farm Irrigation Trials53° 38' 32.07" N, 2° 53' 17.32" WEnglandDraft
Farming For Water52° 24' 17.42" N, 1° 30' 23.77" WEnglandDraft1 April 2015Land use management - agriculture
Water quality
Farming with water - Ullswater Catchment54° 34' 59.98" N, 2° 57' 49.17" WEnglandDraft
Fazakerley Brook Wetland53° 27' 43.92" N, 2° 55' 50.19" WEnglandDraft
Fender River Restoration Project - Bidston, Wirral53° 24' 43.97" N, 3° 5' 24.39" WEnglandDraft1 April 2018Habitat and biodiversity
Ferry Lane North drainage realignment51° 30' 52.76" N, 0° 11' 15.92" EEnglandDraftHabitat and biodiversity
Social benefits
Fingringhoe Managed Realignment51° 50' 25.96" N, 0° 56' 57.92" EEnglandApproved2015Salt marsh and mudflat restorationFlood risk management
Habitat and biodiversity
Land use management - agriculture
Social benefits
Water quality
Firs Farm Wetlands51° 37' 41.59" N, 0° 5' 12.88" WEnglandDraftDeculverting
Ponds and pools inside the wetland
Creation of wetland
Creation of wet woodland
Creation of pond
Creation of side channel
Deculverting
Extensive planting
Sustainable urban drainage ponds (SUDs)
Floodplain creation
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Monitoring
Social benefits
Water quality
Urban
Fish and Flow at Arcadia - Phase 251° 26' 5.72" N, 0° 13' 28.25" EEnglandDraft
Fish migration aid KW Melk48° 13' 38.91" N, 15° 18' 5.28" EAustriaApprovedHabitat and biodiversity
Hydropower
Monitoring
Fishery/habitat enhancement on the Grand Union Canal51° 37' 1.72" N, 0° 29' 46.88" WEnglandApproved1 January 2010Creation of backwaterFisheries
Habitat and biodiversity
Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river48° 35' 39.25" N, 6° 29' 6.50" EFranceApprovedRiverbank revegetation
Removal of bank reinforcements
Floodplain reconnection
Creation of a flood expansion area
Channel wideningSurface drainage systems improvedFlood risk managementQuantity & dynamics of flowhydrography, topography and geology of site
Flood detention basin (HRB) Ickern-Mengede51° 34' 58.57" N, 7° 21' 27.28" EGermanyApproved1 January 2005removal of bottom slab formwork
Adding sinuosity
Increase water retention area
Connection to wider floodplain
Wetland habitat
Channel naturalisation
Enabling dynamics
Improvement of channel morphology
Meandering channel
Habitat and biodiversity
Hydromorphology
Fish
Invertebrates
Macrophytes
Channel pattern/planform
Structure & condition of riparian/lake shore zones
Width & depth variation
Nutrient concentrations
Oxygen balance
PH
Salinity
Temperature
Flood management and ecological restoration in the Dijle valley51° 2' 15.77" N, 4° 28' 55.87" EBelgiumApprovedFlood risk management
Habitat and biodiversity
Hydromorphology
Floodplain restoration in the River IJssel at Gelderland52° 19' 37.13" N, 6° 5' 26.47" ENetherlandsApprovedHabitat and biodiversity
Floodplain restoration in the River Traisen48° 11' 21.14" N, 15° 42' 59.79" EAustriaApprovedEnvironmental flows and water resources
Hydromorphology
Force Crag Mine Remediation54° 35' 1.78" N, 3° 14' 17.44" WEnglandApprovedVertical flow pond which uses compost
limestone and woodchips to remove metals from the water without the need for added energy or chemicals
Habitat and biodiversity
Water quality
Fordmill weir51° 26' 13.43" N, 0° 1' 20.03" WEnglandDraftBank reprofiling
Removing of concrete structures
Weir removal
Fisheries
Habitat and biodiversity
Forest Halt, Saltburn Valley Gardens54° 34' 44.58" N, 0° 58' 13.21" WEnglandDraft11 October 20174 September 2018Economic aspects
Flood risk management
Social benefits
France Farm (Phase 1) A 951° 18' 7.22" N, 1° 48' 48.04" WEnglandApproved1 September 20131 October 2013opening up of hatches to reconnect reaches of the riverEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Free the Frome51° 28' 2.79" N, 2° 34' 18.82" WEnglandDraftEconomic aspects
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Social benefits
Spatial planning
Water quality
Urban
Freiston Managed Realignment Scheme52° 57' 25.44" N, 0° 5' 34.64" EEnglandApprovedManaged realignment (Three 50m wide breaches were created in the outer sea wall)Habitat and biodiversity
Fresh Wharf51° 31' 58.61" N, 0° 4' 18.62" EEnglandDraftReedbed creationEconomic aspects
Habitat and biodiversity
Social benefits
Friary Park51° 36' 53.99" N, 0° 9' 25.15" WEnglandDraft1 January 2008Habitat and biodiversity
Social benefits
Friends of Afon Llwyd (FOAL)51° 42' 51.49" N, 3° 3' 17.17" WWalesApproved1 March 2010Removal of invasive plants
Gravel traps
Bank improvement
Cut back of trees
Litter pickingEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Monitoring
Friends of Bottesford Beck53° 32' 52.15" N, 0° 38' 58.89" WEnglandApproved24 January 2017Riverbed restorationPlanting
Creation of pond
Rain gardens
Removal of rubbish
Flood risk management
Habitat and biodiversity
Social benefits
Water quality
Friern Barnet Former Sewage Works51° 36' 26.60" N, 0° 8' 18.57" WEnglandDraft1 January 2008DeculvertingHabitat and biodiversity
Social benefits
Frog Island51° 30' 31.12" N, 0° 10' 32.25" EEnglandDraftRemoving of concrete structuresFisheries
Flood risk management
Habitat and biodiversity
Social benefits
Garratt Park51° 26' 2.01" N, 0° 11' 29.87" WEnglandDraft1 January 2008Bank reprofiling
Removing structures
Habitat and biodiversity
Social benefits
Gastersche Diep53° 2' 26.11" N, 6° 38' 29.21" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Monitoring
Gategill Beck: Abandoned Metal Mines54° 37' 15.38" N, 3° 2' 44.44" WEnglandApproved2010Deculverting
Sealing the culvert
Dam loweringLowering of impoundment
Pipe through dam for mine water to travel to future treatment scheme
Clean up pollution with Defra funding
Passive treatment
potential locations for a treatment system to be constructed
research on how to capture mine water
reviewed treatment technologies
Environmental flows and water resources
Habitat and biodiversity
Monitoring
Water quality
Gaywood restoration project52° 45' 29.67" N, 0° 24' 49.28" EEnglandDraft1 April 2018Habitat and biodiversity
Giving up the Weed52° 2' 43.01" N, 3° 12' 4.46" WEnglandApproved1 October 2007Removal of invasive speciesHabitat and biodiversity
Monitoring
Glaisdale Beck Restoration Project54° 25' 21.47" N, 0° 50' 11.36" WEnglandApproved31 May 2016Cattle drinkersFencing
Livestock fencing
Buffer strips
Tree planting
Restoring riparian vegetation
Habitat and biodiversity
Land use management - agriculture
Monitoring
Water quality
Glaisdale Beck diversion scheme54° 25' 31.81" N, 0° 49' 31.28" WEnglandApproved21 September 20071 October 2014River channel diversionEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Monitoring
Water quality
Channel pattern/planform
Continuity of sediment transport
Glenbrook Wetlands51° 38' 51.89" N, 0° 7' 3.60" WEnglandApproved1 September 2012Bed raisingTree management
Creation of swales and wetland basin
n/an/aOpening of tree canopy to encourage varied ground floraFlood risk management
Habitat and biodiversity
Monitoring
Social benefits
Water quality
Urban
Goldrill Beck River Restoration54° 30' 55.86" N, 2° 55' 19.69" WEnglandApproved2018embankment removalfloodplain reconnectionditch restoration
drain blocking
re-meandering
wet woodland restoration through channel blockingFlood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Water quality
Goodmayes Park, Mayes Brook51° 33' 17.16" N, 0° 6' 32.02" EEnglandDraftDeculvertingFisheries
Habitat and biodiversity
Goresbrook Park51° 32' 19.92" N, 0° 8' 33.97" EEnglandApproved1 January 2008Bank reprofiling
Deculverting
Creation of wetlandEnvironmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Social benefits
Goresbrook and Ship and Shovel Sewer51° 32' 0.62" N, 0° 8' 27.85" EEnglandDraft1 August 2008Flood risk management
Habitat and biodiversity
Social benefits
Goshen Weir removal project, River Roch, Bury53° 34' 40.58" N, 2° 17' 12.55" WEnglandApprovedWeir removal/modification for easement of fish passageFisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Gottar Water weir fish barrier easement55° 52' 2.90" N, 4° 36' 46.42" WScotlandApproved1 March 2015Feasibility and Optioneering study nearing completion. Preferred option yet to be identified.Fisheries
Habitat and biodiversity
Grantham Blue Green - Urban Reach52° 54' 49.38" N, 0° 38' 17.41" WEnglandDraft7 January 2021Tree Hinging adding gravel
berm creation
daylighting.
Urban wetlands and wildflower meadowsHabitat and biodiversity
Great Ryburgh End Restoration Scheme52° 48' 16.25" N, 0° 54' 45.19" EEnglandApprovedDiversification of in-channel features
Soft erosion solutions
Introducing large woody debris
Tree planting
Creation of backwaters
Fisheries
Habitat and biodiversity
Hydromorphology
Greater Thames Estuary Fish Migration Roadmap51° 31' 25.92" N, 0° 7' 42.81" WEnglandDraftEconomic aspects
Fisheries
Flood risk management
Habitat and biodiversity
Monitoring
Social benefits
Spatial planning
Urban
Greatham Managed Realignment Scheme54° 37' 30.83" N, 1° 13' 34.36" WEnglandApprovedFlood risk management
Habitat and biodiversity
Water quality
Estuary
Fisheries
Urban
Greatham Marsh Restoration54° 37' 58.98" N, 1° 14' 14.75" WEnglandDraftEstuary
Fisheries
Flood risk management
Habitat and biodiversity
Greenwich Peninsula51° 30' 11.64" N, 0° 0' 10.92" EEnglandApproved1 January 1997Bank improvement
creation of intertidal terraces
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Spatial planning
Urban
Estuary
Fish
Groote Beek52° 0' 44.67" N, 6° 16' 17.17" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Grote Aa51° 21' 51.66" N, 5° 34' 25.76" ENetherlandsDraftHabitat and biodiversity
Monitoring
Water quality
Grovelands Park Wetlands51° 38' 8.36" N, 0° 6' 32.79" WEnglandApproved1 February 201410 July 2015DeculvertingCreation of swales and wetland basin
stream allowed to find new course
Meandering channelEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Water quality
Urban
Guash Habitat Restoration Project (Phase 1 and 2)52° 40' 56.62" N, 0° 29' 19.17" WEnglandApproved1 May 20121 March 2014Habitat enhancementChannel narrowing
Removal of channel blockages
Environmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Water quality
Guisborough Flood Alleviation Scheme54° 32' 1.50" N, 1° 2' 41.98" WEnglandApproved2015Offline storage areasFlood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Gunnerside Gill: Abandoned metal mines54° 22' 46.14" N, 2° 4' 22.64" WEnglandApproved2012Catchment Characterisation Programme
Options for remediation
Spot flow gauging
Environmental flows and water resources
Habitat and biodiversity
Monitoring
Water quality
Gunville Phase I51° 13' 14.48" N, 1° 46' 51.48" WEnglandApproved1 June 201213 December 2012Restoring gravel bed
Introducing large woody debris
lowering river bank
Wetland habitat
Enhancing flow diversity
Habitat restoration
Meandering channel
Flow managementEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Guphill Brook Riverine Enhancement52° 24' 43.15" N, 1° 33' 31.22" WEnglandApproved1 October 2014Bank reprofilingCreation of backwaters
Lowland meadow
Creation of pond
Creation of wooden deflectorsFisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Social benefits
Water quality
Urban
HLS New Forest50° 52' 37.36" N, 1° 37' 53.29" WEnglandApprovedBed raising
Removal/retreat of embankments
Re-instatement of old course
Re-meandering
Habitat and biodiversity
Monitoring
Fish: Species composition
Invertebrates: Abundance
Channel pattern/planform
Habitat Enhancements, River Glaven at Wiveton, Norfolk52° 56' 31.28" N, 1° 2' 18.91" EEnglandDraftHabitat and biodiversity
Hydromorphology
Water quality
Habitat Enhancments, Reepham Stream, River Blackwater, Norfolk52° 45' 51.25" N, 1° 8' 8.82" EEnglandDraftHabitat and biodiversity
Hydromorphology
Water quality
Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration51° 25' 18.27" N, 1° 41' 55.12" WEnglandApproved1 July 20121 March 2015Bank reprofiling
Removal of fish barriers
Creation of fish passes
Fisheries
Hydromorphology
Habitat Improvements on the River Colne at West Drayton51° 30' 0.52" N, 0° 29' 19.29" WEnglandDraft1 January 2008Installation of coir rolls
Introduction of gravel
Creation of backwaterFisheries
Habitat and biodiversity
Habitat enhancement of the River Waveney through Bressingham52° 22' 45.29" N, 1° 2' 17.05" EEnglandApprovedFisheries
Habitat and biodiversity
Hydromorphology
Habitat improvements in the upper Kennet51° 26' 25.13" N, 1° 41' 40.71" WEnglandApproved1 July 20121 March 2015Creation of meandersHabitat and biodiversity
Social benefits
Water quality
Habitat restoration of the Kleine Net Valley51° 23' 20.12" N, 4° 51' 41.22" EBelgiumApproved1 January 201131 December 2015Habitat and biodiversity
Hackbridge Restoration51° 22' 38.43" N, 0° 9' 37.93" WEnglandDraft1 January 2009Bank reprofiling
Deflectors
Installation of coir rolls
Fisheries
Habitat and biodiversity
Social benefits
Hackbridge weir notch51° 22' 34.77" N, 0° 9' 28.61" WEnglandDraft1 January 2008Deflectors
Installation of coir rolls
Removal of sediment
Fisheries
Habitat and biodiversity
Social benefits
Urban
Hackney Marsh recreation grounds51° 33' 32.81" N, 0° 1' 34.97" WEnglandDraftBank reprofilingHabitat and biodiversity
Hackney Marshes - Wick Field recreation ground51° 33' 0.15" N, 0° 1' 37.26" WEnglandDraftCreation of wetlandFlood risk management
Habitat and biodiversity
Hadfield Weir Fish Pass53° 24' 51.85" N, 1° 24' 52.20" WEnglandApproved11 February 2013Eel pass
Creation of fish passes
Economic aspects
Fisheries
Flood risk management
Habitat and biodiversity
Hainburg River Restoration48° 8' 47.04" N, 16° 55' 39.23" EAustriaApprovedFlood risk management
Habitat and biodiversity
Hydromorphology
Hale Wharf51° 35' 24.45" N, 0° 3' 15.14" WEnglandDraftEconomic aspects
Fisheries
Habitat and biodiversity
Social benefits
Hall Place weir modification51° 27' 0.62" N, 0° 10' 23.36" EEnglandDraftFlow managementFisheries
Haltwhistle burn; a total catchment approach54° 59' 21.41" N, 2° 26' 9.72" WEnglandApproved17 September 2012Barrier removalTree plantingImprove forest management and agricultural
Management of organic and inorganic sediments
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Water quality
Hampton Court Palace51° 24' 10.17" N, 0° 20' 27.36" WEnglandApproved1 January 2009Bank reprofilingHabitat creation
Reedbed creation
Flood risk management
Habitat and biodiversity
Monitoring
Water quality
Urban
Harbertonford Flood Alleviation Scheme50° 23' 27.36" N, 3° 43' 19.76" WEnglandApproved1999Bed lowering
Creation of pools and riffles
Weir modification
Containment bund to prevent flooding
Construction of flood wall
Channel wideningSUDS
Surface drainage systems improved
Flood risk management
Social benefits
Harrow Lodge Park51° 33' 40.29" N, 0° 12' 36.61" EEnglandApproved1 January 2008Deculverting
Removing of concrete structures
Fisheries
Habitat and biodiversity
Haynes Park51° 34' 50.57" N, 0° 12' 50.49" EEnglandDraftRemoving of concrete structures
Weir removal
Social benefits
Healthy Rivers51° 39' 0.84" N, 3° 11' 43.85" WWalesApproved1 April 2015Weir removal
Weir modification
Barrier removal
Habitat creation
Monitoring strategy
Walkover surveys and water sample data collection
Environmental flows and water resources
Fisheries
Habitat and biodiversity
Social benefits
Hedleyhope Burn54° 46' 56.48" N, 1° 44' 6.98" WEnglandApproved20121 September 2012creation of rock pools downstream of culvertFisheries
Heiligenbergerbeek52° 6' 32.57" N, 5° 24' 8.85" ENetherlandsDraftHabitat and biodiversity
Water quality
Help for the Forgotten Farms Upper Lune (Plugging the gap)54° 9' 28.31" N, 2° 44' 6.73" WEnglandDraftHydropower
Water quality
Herefordshire Asset Restoration Project (HARP)52° 3' 23.03" N, 2° 42' 57.51" WEnglandApproved1 August 201031 December 2011Developing angling infrastructureEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Herinrichting Beekloop51° 18' 53.27" N, 5° 23' 37.00" ENetherlandsApproved1 January 2010Dood hout
Vispassages
BeschaduwingEnvironmental flows and water resources
Fisheries
Hydromorphology
Land use management - agriculture
Fish
Macrophytes
Flow velocities
Width & depth variation
Nutrient concentrations
Oxygen balance
PH
Salinity
Specific synthetic pollutants
Temperature
Transparency
Herinrichting beekdal Tongelreep51° 23' 52.46" N, 5° 28' 51.23" ENetherlandsApproved1 January 2007Dood hout
Grind bedden
Bouwen met NatuurEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Fish
Macrophytes
Flow velocities
Width & depth variation
Nutrient concentrations
Oxygen balance
PH
Salinity
Specific synthetic pollutants
Temperature
Hesketh Out Marsh Managed Realignment53° 42' 48.02" N, 2° 50' 51.51" WEnglandApproved2014Salt marsh and mudflat restorationEconomic aspects
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Social benefits
Water quality
Heybarnes Recreation Ground Cole Restoration52° 28' 4.69" N, 1° 49' 53.11" WEnglandApprovedFlood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Water quality
Hierdense Beek52° 19' 22.30" N, 5° 42' 17.44" ENetherlandsApproved2013Sand deposit
dead wood deposit
ShadingMowing managementHabitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Fish
Macrophytes
Flow velocities
Quantity & dynamics of flow
Width & depth variation
Acid neutralising capacity
Oxygen balance
PH
Temperature
Transparency
Highland Water at Warwickslade Lawn50° 51' 28.12" N, 1° 36' 31.52" WEnglandApproved1 June 20091 November 2009Planting
Introduction of gravel
Re-meanderingFlood risk management
Habitat and biodiversity
Hightown Sand Dune Restoration53° 31' 37.65" N, 3° 4' 13.59" WEnglandApprovedSand dune restorationFlood risk management
Habitat and biodiversity
Monitoring
Social benefits
Hills to Levels51° 5' 57.11" N, 2° 57' 52.06" WEnglandApproved1 January 2015Bank stabilisation
habitat creation
Floodplain reconnection
floodplain scrapes
floodplain woodland planting
Opening long sections of culverts
leaky woody dams
Run-off interception
attenuation
diversion
Soil managment and land use to improve infiltration and water qualityFlood risk management
Habitat and biodiversity
Land use management - agriculture
Land use management - forestry
Monitoring
Water quality
Historic Mill Restoration Project54° 54' 46.21" N, 8° 50' 21.08" EDenmarkApprovedEconomic aspects
Habitat and biodiversity
Social benefits
Hoffer Brook52° 7' 43.94" N, 0° 4' 1.75" EEnglandApproved1 February 20131 May 2014Bed lowering at impoundment and bed raising with gravel (and mesh)
Bank reprofiling
Sensitive desilt
Livestock fencing
Tree management
Cattle drinkers
Habitat and biodiversity
Hydromorphology
Hogsmill River Connectivity Project51° 21' 21.99" N, 0° 15' 27.75" WEnglandApproved1 August 201231 October 2013Weir removal
Deculverting
Weir modification
Environmental flows and water resources
Fisheries
Flood risk management
Social benefits
Hogsmill Sewage Treatment Works phase 151° 24' 4.18" N, 0° 17' 16.08" WEnglandApproved1 January 2011Bank reprofilingCreation of wetlandCreation of backwaterEconomic aspects
Flood risk management
Habitat and biodiversity
Social benefits
Hogsmill river enhancement51° 22' 59.40" N, 0° 16' 0.98" WEnglandDraft1 April 2018Flood risk management
Habitat and biodiversity
Hollyoak Wood and Willersley Park51° 26' 46.67" N, 0° 5' 22.21" EEnglandDraft1 January 2008Bank reprofilingHabitat and biodiversity
Hydromorphology
Social benefits
Holmsley Inclosure Stream Restoration50° 48' 0.41" N, 1° 41' 4.88" WEnglandApproved1 July 200231 December 2006Bed raising
Tree management
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Monitoring
Holnicote multi-objective flood risk management demonstration project51° 12' 21.49" N, 3° 33' 43.18" WEnglandApproved1 April 200931 March 2015Large woody derbis damsCreation of a flood expansion area
Interventions in direct/rapid flow pathways on hillsopes & connectivity to watercourses
Grip blocking
Moorland restoration
Woodland extension
Implementation of best practice land & soil managementEconomic aspects
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Social benefits
Water quality
Hoo Brook root plates52° 22' 10.79" N, 2° 14' 48.97" WEnglandDraft4 January 2018Flood risk management
Habitat and biodiversity
Hooge Raam51° 43' 22.58" N, 5° 42' 25.45" ENetherlandsDraftHydromorphology
Horne Way Weir51° 28' 14.68" N, 0° 13' 27.48" WEnglandDraftWeir removalHabitat and biodiversity
Hospital Bridge Road51° 26' 33.79" N, 0° 21' 50.25" WEnglandDraft1 January 2011Creation of backwaterFisheries
Flood risk management
Social benefits
Houghton 'trout stream' enhancements52° 19' 30.02" N, 0° 6' 26.70" WEnglandApproved1 May 2014Creation of wooden deflectors
Cleaning of spawning gravels
Fencing
Tree planting
Fisheries
Hydromorphology
Fish
Houndsden Road Rain Gardens51° 38' 21.52" N, 0° 6' 25.57" WEnglandApproved6 August 2012Creation of swales and wetland basinOpening of tree canopy to encourage varied ground floraFlood risk management
Habitat and biodiversity
Social benefits
Water quality
Urban
Hoveton Wetlands Restoration Project52° 42' 53.18" N, 1° 24' 43.08" EEnglandDraftHabitat and biodiversity
Hydromorphology
Water quality
Hull and East Riding Catchment Partnership53° 43' 5.51" N, 0° 18' 33.60" WEnglandApprovedEconomic aspects
Environmental flows and water resources
Fisheries
Flood risk management
Hydromorphology
Land use management - agriculture
Monitoring
Social benefits
Water quality
Urban
Humber Estuary Erosion Protection Programme53° 44' 37.92" N, 0° 19' 42.07" WEnglandApproved2017Salt marsh and mudflat restoration
Hunze bij Torenveen53° 0' 19.98" N, 6° 49' 38.38" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Monitoring
Water quality
Hurst Bridge (downstream)50° 42' 47.18" N, 2° 17' 22.94" WEnglandDraftFisheries
Habitat and biodiversity
Hydromorphology
Hurst Park51° 24' 37.07" N, 0° 21' 38.87" WEnglandApproved1 January 2008Habitat creation
Creation of wetland
Environmental flows and water resources
Flood risk management
Habitat and biodiversity
Social benefits
INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract43° 30' 8.69" N, 4° 45' 46.82" EFranceApproved1 November 201631 October 2019Maintain the South dike; Respect the natural hydrological functioning of the South basin (rain fed) to favor the installation of a vegetation characteristic of temporary low-salt marshes and vegetation of salt meadowsAdd signage and interpretation on birds in the observatoryEnsure compliance with hunting regulations (ensure guarding)Environmental flows and water resources
Social benefits
Improvement of the River Varde at the Wadden Sea estuary55° 27' 47.83" N, 8° 18' 40.17" EDenmarkApprovedHabitat and biodiversity
Improving conservation condition of the National Trust managed river test SSSI51° 12' 23.82" N, 1° 21' 34.22" WEnglandApprovedMonitoring strategyFisheries
Habitat and biodiversity
Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters52° 27' 19.75" N, 3° 12' 51.23" WEnglandApprovedRiparian habitat restoration
Tree planting
Cut back of trees
Livestock accessLivestock exclusion
Sustainable livestock watering
Environmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Monitoring
Social benefits
Water quality
Improving water quality in Loweswater54° 34' 59.62" N, 3° 21' 24.07" WEnglandApproved1 July 2012Non/agricultural business changed its way of workingEconomic aspects
Habitat and biodiversity
Social benefits
Water quality
Inchewan Burn Bed restoration56° 33' 26.66" N, 3° 34' 45.15" WScotlandApproved1 September 2007Removal of artificial wire/stone bed
Replicated upstream boulder bed step/pool sequence
Removal of non-native species
Large scale planting of native species
In-channel placement of boulders to provide flow diversityFisheries
Habitat and biodiversity
Hydromorphology
Fish
Inspiring Water Action in the Torne (iWAIT)53° 30' 48.20" N, 1° 1' 1.70" WEnglandApproved2016establishment of woodlandFlood risk management
Habitat and biodiversity
Social benefits
Water quality
Investigating the Impacts of Upland Land Use Management on Flood Risk at Pontbren, Wales52° 39' 16.55" N, 3° 23' 38.15" WWalesApproved2005establishment of woodlandEconomic aspects
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Monitoring
Investigating the impact of floodplain woodland on flood flows in the River Cary catchment, Somerset51° 3' 31.73" N, 2° 43' 9.62" WEnglandApprovedestablishment of woodlandFlood risk management
Habitat and biodiversity
Land use management - forestry
Monitoring
Water quality
Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England55° 5' 41.08" N, 2° 28' 50.47" WEnglandApprovedestablishment of woodlandFlood risk management
Habitat and biodiversity
Land use management - forestry
Monitoring
Water quality
Investigating the interaction between semi-natural floodplain woodland and flood flows at Great Triley Wood51° 51' 22.95" N, 2° 59' 59.83" WWalesApproved2005establishment of woodlandFlood risk management
Habitat and biodiversity
Land use management - forestry
Monitoring
Water quality
Ironbridge Farm51° 55' 41.94" N, 0° 31' 6.19" EEnglandApproved1 April 2012Habitat restorationCreation of backwaters
Creation of wetland
Creation of pond
Creation of backwater
Habitat restoration
UK BAP habitat creation/restorationEnsuring biodiversity
Promoting riparian vegetation
Woodland management
Habitat and biodiversity
Water quality
Isar-Plan48° 7' 40.09" N, 11° 34' 41.73" EGermanyApproved1 January 1998Deepening of river floor
Removal of bank reinforcements
Creation of gravel banks
Bank reprofiling
Large scale planting of native species
Creation of a flood expansion area
Channel naturalisation
Channel widening
Creation of braided channel
Creation of willow island
Creation of new bicycle path
embedding of rootballs and tree trunks
natural seating stones places on banks
Waste management
provision of temporary toilet facilities
Fisheries
Flood risk management
Habitat and biodiversity
Hydropower
Hydromorphology
Land use management - forestry
Monitoring
Social benefits
Spatial planning
Water quality
Urban
Continuity of sediment transport
Structure & condition of riparian zones
Public use
Jufferbeek52° 17' 11.76" N, 6° 53' 54.31" ENetherlandsDraftHabitat and biodiversity
Water quality
Kanaal van Deurne51° 24' 51.98" N, 5° 52' 5.60" ENetherlandsDraftFlood risk management
Keent51° 46' 15.18" N, 5° 41' 44.93" ENetherlandsDraft1 January 20074 July 2014Connection between river channel and former side branches
Riverbed dug out
GrazingFlood risk management
Habitat and biodiversity
Land use management - agriculture
Kelham Island Weir Fish Easement53° 23' 25.16" N, 1° 28' 31.61" WEnglandDraftCreation of fish passes
Improving fish migration
Fisheries
Habitat and biodiversity
Urban
Kensworth Quarry Chalk Pit Restoration51° 51' 56.35" N, 0° 31' 15.49" WEnglandApprovedEnvironmental flows and water resources
Habitat and biodiversity
Kensworth Quarry Chalk Pit Site Restoration51° 51' 56.35" N, 0° 31' 15.49" WEnglandDraft
Kensworth Quarry Chalk Pit Site Restoration 251° 51' 56.35" N, 0° 31' 15.49" WEnglandDraft
Kentchurch Weir Removal51° 55' 25.48" N, 2° 51' 0.57" WWales
England
ApprovedWeir removal
Weir modification
Improving fish migrationHabitat and biodiversityBathymetric Survey
Sediment Contamination Assessment
Kimpton Park51° 22' 31.47" N, 0° 12' 37.15" WEnglandDraft1 January 2008Bank reprofilingCreation of new channel
Habitat creation
Flood risk management
Social benefits
King Georges Park51° 26' 51.78" N, 0° 11' 35.17" WEnglandDraft1 January 2008Removing of sheet pilingCreation of meandersSocial benefits
King Georges Playing Field51° 33' 51.04" N, 0° 11' 3.67" EEnglandDraft1 January 2008Tree managementCreation of backwaterFisheries
Habitat and biodiversity
Social benefits
Kirkstall Valley Weir Fish Passes Project53° 48' 44.13" N, 1° 36' 0.82" WEnglandApproved9 August 201225 June 2014Creation of fish passesEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Social benefits
Urban
Kirkstone Beck River Restoration54° 29' 59.68" N, 2° 55' 39.33" WEnglandApproved2019Embankment removal
Diversification of in-channel features
Rejuvination of river delta
widening of river channel
Widening to allow wandering sectionsFlood risk management
Habitat and biodiversity
Hydromorphology
Water quality
Klassiek beekherstel Astense Aa51° 25' 16.61" N, 5° 46' 23.66" ENetherlandsApproved2011Traditioneel beekherstelEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Water quality
Kleblach-Side channel46° 46' 33.60" N, 13° 20' 45.60" EAustriaApproved1 January 1992PlantingRemoval of embankmentsCreation of groynes
Creation of side channel
Habitat and biodiversity
Monitoring
Hydromorphology
Water quality
Fish: Abundance
Fish: Species composition
Invertebrates: Abundance
Invertebrates: Diversity
Channel pattern/planform
Flow velocities
Kleine Aa, traject Smalwater Noord51° 35' 42.36" N, 5° 16' 35.87" ENetherlandsApproved1 March 2008Habitat and biodiversity
Spatial planning
Fish
Macrophytes
Kleine Beerze51° 25' 15.72" N, 5° 16' 47.28" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Monitoring
Water quality
Knepp Rewilding Project50° 58' 40.98" N, 0° 21' 33.26" WEnglandApproved1 January 200631 December 2013Bank modification
Re-profiling
Creation of low flow channel
Habitat restoration
Barrier removal
Creation of backwaters
Introducing large woody debris
Riverbed restoration
Floodplain reconnection
Scrapes
Increase water retention area
Wetland habitat
Channel realignment
Enhancing flow diversity
Habitat restoration
Meandering channel
Re-meandering
Create more natural flow regime
Improvement of natural flows
Improving fish migration
Selective removal of organic muds and sludge contaminated with toxic
Flow managementEnvironmental flows and water resources
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Social benefits
Water quality
Knock Burn low flow channel54° 35' 58.03" N, 5° 50' 20.99" WNorthern IrelandApproved2 December 201025 January 2011Creation of low flow channelRe-meanderingEnvironmental flows and water resources
Habitat and biodiversity
Social benefits
Urban
Fish
Macrophytes
Channel pattern/planform
Koningsdiep53° 2' 26.51" N, 6° 3' 3.28" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Monitoring
Water quality
LARA (Lugg and River Arrow)52° 18' 18.24" N, 3° 4' 22.93" WWales
England
Approved15 August 200830 November 2010Creation of fish passes
Bank improvement
Cut back of trees
Livestock fencing
Fisheries
Habitat and biodiversity
Water quality
LIFE IP IRIS Enns Mandling Restoration47° 24' 2.34" N, 13° 33' 34.29" EAustriaApprovedFlood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
LIFE+ Traisen48° 21' 46.32" N, 15° 52' 20.50" EAustriaDraft1 January 2009Within the construction process the river was extended by 7.6 kilometres and the estuary of the Traisen River was relocatedEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Monitoring
LIFE03NAT/A/000009 WachauAustriaApprovedHabitat and biodiversity
Monitoring
LIFE07 NAT/A/000010 Living space in the rivers of Mostviertel - WachauAustriaApprovedHabitat and biodiversity
Hydromorphology
Monitoring
Lactariabeek51° 34' 53.12" N, 5° 54' 33.24" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Monitoring
Lady Island/Friars Meadow - Sudbury - River Stour52° 2' 9.15" N, 0° 44' 19.71" EEnglandDraft1 April 2018Fisheries
Habitat and biodiversity
Lady's Bridge Fish Easement53° 23' 8.21" N, 1° 27' 51.81" WEnglandDraftFisheries
Habitat and biodiversity
Urban
Ladywell Fields (QUERCUS)51° 27' 16.31" N, 0° 1' 7.68" WEnglandApproved1 June 2006Planting
Depth variation
Removal of fencing
Creation of backwaters
Creation of terraces
New footpaths
Creation of meandersFisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Social benefits
Urban
FishStructure & condition of riparian zones
Width & depth variation
Public Accessibility
Ladywell Fields Phase 251° 26' 47.49" N, 0° 1' 34.54" WEnglandDraft1 January 2008Bank reprofiling
Removing of concrete structures
Weir removal
Creation of wetlandCreation of meanders
Creation of pools and riffles
Flood risk management
Habitat and biodiversity
Social benefits
Ladywell Fields to Cornmill Gardens51° 27' 24.63" N, 0° 1' 3.79" WEnglandDraft1 January 2008Bank reprofiling
Removing of concrete structures
Creation of meanders
Creation of pools and riffles
Tree management
Fisheries
Flood risk management
Habitat and biodiversity
Social benefits
Ladywell Fields toeboarding51° 27' 14.67" N, 0° 1' 5.95" WEnglandDraft1 January 2009Bank reprofiling
Toeboard removal
Habitat and biodiversity
Lage Raam51° 42' 26.13" N, 5° 47' 19.88" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Monitoring
Lake District Foundation - Building future environmental investment54° 22' 30.20" N, 2° 54' 11.24" WEnglandDraft
Land acquisition on the banks of the Ouche River47° 15' 10.55" N, 5° 9' 34.07" EFranceApprovedland acquisitionEnvironmental flows and water resources
Habitat and biodiversity
Land use management - agriculture
Spatial planning
Fish
Land at Buzzards Mouth Creek51° 30' 50.23" N, 0° 6' 23.91" EEnglandDraft1 January 2008Bank reprofiling
Deculverting
Creation of backwaterFlood risk management
Habitat and biodiversity
Land opposite Wanstead Park51° 34' 22.82" N, 0° 2' 38.16" EEnglandDraft1 January 2008Bund removal
Creation of wetland
Fisheries
Flood risk management
Habitat and biodiversity
Social benefits
Langford Lakes project51° 8' 10.69" N, 1° 57' 11.05" WEnglandApproved1 October 2002Planting
Sediment trap building
Morphological diversification
Diversification of in-channel features
Weir construction
Economic aspects
Flood risk management
Land use management - agriculture
Social benefits
Spatial planning
Langonnet river48° 5' 33.92" N, 3° 30' 18.48" WFranceApproved1 January 2000Creation of pools and riffles
Creation of groynes
introduction of blocks
Creation of berms
Develop riparian forest
Tree plantation
Habitat and biodiversity
Hydromorphology
Monitoring
Water quality
Fish: Species compositionChannel pattern/planformTemperature
Langor Beck (part of River Wensum SSSI)52° 49' 27.81" N, 0° 54' 41.56" EEnglandDraft1 April 2018Habitat and biodiversity
Laymer Road Silt Trap and Recreational Ground51° 37' 45.90" N, 0° 4' 1.30" WEnglandDraftToeboard removalFlood risk management
Habitat and biodiversity
Social benefits
Lea Bridge Waterway Wall Improvements51° 33' 44.40" N, 0° 2' 50.32" WEnglandDraft1 January 2010Sandmartin tubes installationHabitat and biodiversity
Lebendige Alster53° 32' 56.16" N, 9° 59' 8.24" EGermanyDraft2011Habitat and biodiversity
Hydromorphology
Water quality
Urban
Lee Navigation by Walthamstow Marshes51° 34' 15.03" N, 0° 3' 22.09" WEnglandDraftRemoving of sheet pilingCreation of wetland
Reedbed creation
Creation of pond
Habitat and biodiversity
Social benefits
Lek Bij Everdingen51° 58' 4.80" N, 5° 10' 26.40" ENetherlandsApprovedIntroduction of coil rolls to protect groynesHabitat and biodiversity
Monitoring
Water quality
Fish: Abundance
Invertebrates
Macrophytes
Letting the Dove Flow53° 5' 22.20" N, 1° 47' 35.69" WEnglandApproved1 August 2014Allowing stone weirs and bank reinforcements to break down
removing or breaching weirs and reinforcements
Installing large woody materialEncouraging tree growth and natural supply of large woody materialEnvironmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Letting the Dove Flow 253° 4' 0.00" N, 1° 47' 0.00" WEnglandDraft2015removing or breaching weirs and reinforcements
Allowing stone weirs and bank reinforcements to break down
Removal of bank reinforcements
Improvement of natural flows
Improve longitudinal connectivity
Introducing large woody debris
r
Channel naturalisation
Improvement of channel morphology
Removal of impoundments
Monitoring strategyFisheries
Habitat and biodiversity
Hydromorphology
Social benefits
Letting the Dove Flow 353° 4' 2.61" N, 1° 47' 4.67" WEnglandDraftFlood risk management
Habitat and biodiversity
Levington Saltmarsh Restoration, Suffolk51° 59' 41.32" N, 1° 16' 33.79" EEnglandApproved1997Salt marsh and mudflat restorationFlood risk management
Habitat and biodiversity
Water quality
Lewisham College weir51° 28' 31.11" N, 0° 1' 21.75" WEnglandDraftRemoving of concrete structuresHabitat creationFisheries
Habitat and biodiversity
Lidl51° 27' 37.41" N, 0° 0' 21.84" WEnglandDraft1 January 2008Installation of coir rolls
Introduction of gravel
Habitat creation
Reedbed creation
Tree management
Economic aspects
Environmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Social benefits
Limestone Ribble Restoration Project53° 44' 46.59" N, 2° 48' 49.94" WEnglandApproved1 July 20121 March 2015Tree plantingBarrier removal
The blocking of certain grips
Economic aspects
Habitat and biodiversity
Hydromorphology
Social benefits
Water quality
Linde52° 50' 57.03" N, 6° 0' 10.19" ENetherlandsDraftHabitat and biodiversity
Hydromorphology
Water quality
Linear Park51° 26' 22.70" N, 0° 1' 34.90" WEnglandDraftBank reprofiling
Removing of concrete structures
Toeboard removal
Tree managementCreation of meandersFisheries
Habitat and biodiversity
Social benefits
Urban
Lippeaue Klostermersch51° 39' 41.04" N, 8° 13' 44.40" EGermanyApproved1 January 1996Bed raising
Removal of rip-rap
Floodplain reconnection
Tree planting
Connection to wider floodplain
Former channel filledMore sensitive grazingEconomic aspects
Flood risk management
Monitoring
Fish: AbundanceContinuity of sediment transport
Width & depth variation
Lippenbroek Regulated Tidal Exchange Scheme51° 5' 9.46" N, 4° 10' 19.53" EBelgiumApprovedFlood risk management
Habitat and biodiversity
Litter Clear-Ups (Since 2004)52° 5' 27.23" N, 3° 4' 4.56" WWales
England
Approved2004Habitat and biodiversity
Water quality
Little Don Catchment Case Study53° 29' 58.91" N, 1° 40' 10.60" WEnglandApprovedEnvironmental flows and water resources
Little Ponton52° 52' 21.71" N, 0° 37' 21.40" WEnglandApproved2 January 2013brushwood mattress installation
Hinged Trees
Log Flow Deflectors and Vanes.
Improved stock fencing and ford refurbishment.Fisheries
Habitat and biodiversity
Little Waltham Meadows Back Channel creation51° 46' 26.36" N, 0° 28' 50.59" EEnglandApproved1 October 201231 March 2015New sluice structuresCreation of backwaters
Creation of wet woodland
Protect/restore riparian zone
Habitat and biodiversity
Hydromorphology
Livestreaming Leeds53° 48' 9.54" N, 1° 29' 7.70" WEnglandDraft1 April 2018Habitat and biodiversity
Living Vechte-Dinkel52° 14' 9.13" N, 7° 0' 26.35" ENetherlandsDraftEnvironmental flows and water resources
Habitat and biodiversity
Hydromorphology
Water quality
Lodge Burn Flood Alleviation Scheme55° 8' 1.57" N, 6° 40' 11.08" WNorthern IrelandApproved1 September 20081 July 2012Culvert replacement/repair
silt-trapping weir installation
habitat improvements
Rock ramp construction
Creation of fish passes
Construction of flood wallRemoval of pond to restore natural course and sediment transport.Diversion of water main and supporting beam - obstruction to flow.Flood risk management
Lodge Burn cascade fish pass and culvert bed restoration (as part of the Lodge Burn FAS)55° 7' 58.17" N, 6° 40' 0.06" WNorthern IrelandApproved1 May 201231 May 2012Creation of fish passes
Bed reprofiling
Creation of pool cascadeFisheries
Flood risk management
Logie Burn Restoration Project57° 5' 48.29" N, 2° 55' 19.68" WScotlandApprovedRe-profiling
construction of bunds
Creation of revetments
Bank stabilisation
Bank protection
Creation of backwaters
Creation of wetland
Livestock fencing
Fencing
Re-meanderingThe meanders were cleared of sediment
vegetation and organic debris
Flood risk management
Habitat and biodiversity
Hydromorphology
Monitoring
Water quality
FishContinuity of sediment transport
Flow velocities
Quantity & dynamics of flow
Substrate conditions
Width & depth variation
Nutrient concentrations
London Olympics Parklands51° 32' 49.21" N, 0° 1' 2.57" WEnglandApproved1 January 20051 January 2012Marginal planting
Habitat diversification
Reedbed creation
Creation of wetland
Creation of wet woodland
Spatial planning
Long Eau (Great Eau)53° 21' 22.58" N, 0° 6' 55.08" EEnglandApproved19921 January 1996Displacement of flood defences
Lowering of embankments
Creation of backwaterFlood risk management
Habitat and biodiversity
Land use management - agriculture
Long Preston Deeps Flood Plain Project54° 2' 37.29" N, 2° 17' 26.80" WEnglandApproved1 January 2004Realignment of flood banksRiver naturalisation
Scrapes
Reconnecting palaeo riverine features
Floodplain reconnection
Environmental flows and water resources
Fisheries
Flood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Social benefits
Water quality
Longbridge West52° 23' 47.55" N, 1° 59' 29.13" WEnglandDraft2019Flood risk management
Habitat and biodiversity
Social benefits
Spatial planning
Water quality
Urban
Longford Community Nature Park Reedbed Restoration Project52° 26' 57.79" N, 1° 29' 20.19" WEnglandDraftReedbed creationFlood risk management
Habitat and biodiversity
Social benefits
Water quality
Urban
Longstreet A 91a51° 15' 35.35" N, 1° 48' 0.92" WEnglandApproved1 January 2013Gravel berms
Riffle creation
Bank reprofiling
Introducing large woody debris
Lowering of impoundment
Tree management
Fisheries
Habitat and biodiversity
Looe Bathing Waters Project50° 21' 14.85" N, 4° 27' 13.89" WEnglandDraftHabitat and biodiversity
Land use management - agriculture
Water quality
Urban
Louds Mill (Downstream)m Enhancement50° 42' 44.49" N, 2° 24' 48.59" WEnglandApproved1 January 2013Bank reprofiling
Re-profiling
Cleaning of spawning gravels
Introducing large woody debris
Tree planting
Marginal planting
Environmental flows and water resources
Fisheries
Habitat and biodiversity
Hydromorphology
Loutre BeLu: Restoration of European otter habitats (Belgium & Luxemburg)50° 24' 1.80" N, 5° 8' 0.65" EBelgiumApproved1 October 20051 March 2011Habitat and biodiversity
Monitoring
Love My River53° 39' 25.08" N, 2° 38' 32.15" WEnglandApprovedHabitat enhancement
Vegetation removal
Clean-up days
Walkover surveys and water sample data collection
Economic aspects
Environmental flows and water resources
Habitat and biodiversity
Monitoring
Water quality
Love My River Douglas53° 32' 43.21" N, 2° 37' 37.82" WEnglandDraft
Love Your River Bromsgrove52° 20' 2.76" N, 2° 4' 20.48" WEnglandDraftHabitat and biodiversity
Monitoring
Social benefits
Water quality
Urban
Love Your River Telford52° 40' 42.31" N, 2° 26' 42.93" WEnglandApprovedFlood risk management
Habitat and biodiversity
Monitoring
Social benefits
Water quality
Urban
Low Gardens Bridge Weir Removal54° 37' 5.42" N, 2° 44' 35.33" WEnglandDraftFlood risk management
Habitat and biodiversity
Hydromorphology
Water quality
Low Stanger Floodplain Reconnection Project54° 38' 15.05" N, 3° 20' 19.10" WEnglandApprovedLowering of embankmentsFlood risk management
Habitat and biodiversity
Hydromorphology
Lowdham NFM53° 0' 39.79" N, 1° 0' 21.83" WEnglandApproved1 February 20181 March 2021Containment bund to prevent flooding
Tree planting
Floodplain reconnection
Deculverting
leaky woody damsFlood risk management
Habitat and biodiversity
Land use management - agriculture
Monitoring
Water quality
Lowdham NFM Project53° 0' 19.20" N, 1° 4' 40.13" WEnglandDraft1 April 2018Habitat and biodiversity
Lower Bockhampton50° 42' 51.24" N, 2° 23' 41.76" WEnglandDraftFisheries
Habitat and biodiversity
Hydromorphology
Lower Darwen Weir Removal53° 42' 38.54" N, 2° 28' 24.63" WEnglandApprovedWeir removalFisheries
Hydromorphology
Lower Otter Restoration Project50° 37' 50.88" N, 3° 18' 29.34" WEnglandApproved4 January 2021Estuary
Flood risk management
Habitat and biodiversity
Lower River Roding Regeneration Project51° 31' 41.59" N, 0° 4' 48.90" EEnglandApproved1 May 200431 March 2006construction of new intertidal areaFlood risk management
Habitat and biodiversity
Social benefits
Urban
Estuary
Lower Thame Barbel Project51° 40' 27.46" N, 1° 8' 0.11" WEnglandDraft1 April 2018Fisheries
Habitat and biodiversity
Lower Woodsford50° 43' 9.63" N, 2° 18' 58.73" WEnglandDraftIntroducing large woody debris
Removal of bank reinforcements
Tree planting
Riparian planting
Removal of embankments
Scrapes
Re-profiled ditchHabitat and biodiversity
Hydromorphology
Lowering the weir of the Houël mill on the Leff River48° 44' 43.53" N, 3° 4' 18.83" WFranceDraft1 September 201030 September 2010Weir lowering
Spreading of debris
Trimming of treesHabitat and biodiversity
Social benefits
Loxford Water51° 32' 53.10" N, 0° 5' 26.00" EEnglandDraft1 January 2008Deculverting
Removing of concrete structures
Fisheries
Flood risk management
Habitat and biodiversity
Lugg & Arrow, Radnorshire52° 21' 24.38" N, 3° 12' 33.30" WWalesApproved1 June 20061 June 2008Removal of fish barriers
Fencing
Supporting local fisheries through marketing initiativesEconomic aspects
Fisheries
Habitat and biodiversity
Lugton Water Fish Barrier Easement55° 39' 49.54" N, 4° 38' 57.23" WScotlandDraft2 January 2015Weir modificationFisheries
Habitat and biodiversity
Lullingstone Castle51° 21' 32.29" N, 0° 12' 0.39" EEnglandApproved200931 December 2011Placement of faggots
Deflectors
Marginal planting
Channel narrowing
Decrease sedimentation
Cut back of trees
Tree management
Fisheries
Habitat and biodiversity
Hydromorphology
Lullingstone Castle phase 251° 21' 9.84" N, 0° 11' 24.29" EEnglandApproved1 January 2011Habitat creationFisheries
Habitat and biodiversity
Lunterse Beek52° 4' 3.69" N, 5° 31' 27.79" ENetherlandsApproved2011Dead wood deposit
Sand deposit
Environmental flows and water resources
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Monitoring
Water quality
Fish
Macrophytes
Channel pattern/planform
Flow velocities
Width & depth variation
Oxygen balance
PH
Salinity
Temperature
Transparency
Lustrum Beck Flood Alleviation Scheme: Phase 254° 32' 34.27" N, 1° 23' 4.67" WEnglandApproved2014Offline storage areasFlood risk management
Habitat and biodiversity
Hydromorphology
Land use management - agriculture
Land use management - forestry
Mackworth and Markeaton Brooks52° 57' 19.37" N, 1° 32' 12.67" WEnglandDraft1 April 2018Habitat and biodiversity
Mains of Dyce57° 12' 49.37" N, 2° 11' 22.06" WScotlandApproved1 August 20091 September 2010step poolHydromorphology
Malden Golf Course51° 24' 37.95" N, 0° 15' 10.60" WEnglandDraftToeboard removalFlood risk management
Habitat and biodiversity
Malltraeth Marsh53° 12' 53.43" N, 4° 19' 42.23" WWalesApproved19931 January 1996excavation of historic channels
Bed raising
Creation of wetland
Floodplain reconnection
Habitat and biodiversity
Maltby WASH53° 25' 3.39" N, 1° 11' 9.19" WEnglandDraft4 January 2018Habitat and biodiversity
Manor House Gardens51° 27' 17.98" N, 0° 0' 12.69" EEnglandDraft1 January 2008Removing of concrete structuresEconomic aspects
Fisheries
Habitat and biodiversity
Social benefits
... further results