Case study:Arborfield nature like bypass and weirs project
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity |
Country | England |
Main contact forename | Dominic |
Main contact surname | Martyn |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
In this reach, impassable flow control structures impounded the river by 1.4m, for over 4km upstream. WFD fisheries surveys determined moderate to poor ecological status upstream of the structures, with good ecological status downstream.
Project objectives to improve WFD status upstream of weir structures from 'moderate' to 'good', along with flood alleviation. Works involved lowering of 5 structures along an 800m section of river, construction of a 200m nature-like bypass channel, in addition to two backwaters and creation of 80m of new riffle habitat for spawning.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information Post-project ecological/hydromorphological monitoring assessments during 2011/12. Data should be available during 2012.
|