Case study:Nine Chalk Rivers Project - Glaven Catchment

From RESTORE
Revision as of 15:55, 5 September 2013 by NickRRC (talk | contribs)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 57' 29.72" N, 1° 0' 59.07" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity, Water quality
Country England
Main contact forename Jonah
Main contact surname Tosney
Main contact user ID
Contact organisation Norfolk Rivers Trust
Contact organisation web site http://www.norfolkriverstrust.org/
Partner organisations Environment Agency, Norfolk Coast AONB, Norfolk Wildlife Trust, Norfolk
This is a parent project
encompassing the following
projects
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Nine Chalk Rivers project is a series of 16 restoration projects spread across nine unique chalk rivers flowing onto Norfolk’s north coast. The rivers face similar problems, most notably canalisation, disconnection from the floodplain, siltation, low flows and diffuse pollution. The projects are diverse, and include re-meandering, floodplain re-connection, silt and nutrient trapping and catchment management planning. Each project will improve the ecological health of the rivers and floodplains. To deliver these projects, Norfolk Rivers Trust is working with landowners across Norfolk as well as the Environment Agency, Natural England, The Universi-ty of East Anglia, Norfolk Wildlife Trust, Norfolk Coast AONB, RSPB, The Wild Trout Trust, The River Glaven Conservation Group and various other partners. The outcomes of the project are the following:improving water quality and river and floodplain habitats.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Subcatchment:Anglian


Site

Edit site
Name Glaven Catchment
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology Actively meandering
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Catchment Restoration Funds

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Pollution incident, canallisation, disconnection from the floodplain, siltation, low flows
Hydromorphology
Biology Fish, Macrophytes, Invertebrates
Physico-chemical Nutrient concentrations
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor Reconnection to the riparian zone, remeandering
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Community Involvement – Norfolk Rivers Trust is involving communities in catchment management planning and project delivery through local conservation groups, community councils and stakeholder workshops.


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


The location of Glaven Catchment


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information