Case study:River Wensum Rehabilitation Project - Bintree
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Hydromorphology, Social benefits, Water quality |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | River Restoration Centre |
Contact organisation web site | http://www.therrc.co.uk |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
In the past this section of the Wensum at Bintree Mill has been dredged creating a deepened and overwidened
channel with uniform flow, and has suffered from over-grazing and trampling by Limosin cattle. The
Bintree Angling Club had ownership of the fishing rights of this stretch of the river and implemnted habitat improvements that to promote wild brown trout fishery with less reliance on stocking. This was achieved through channel narrowing, riffle installation, fencing, flow deflectors, tree planting and the creation of fenced cattle crossing points.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Site
Name | Bintree |
---|---|
WFD water body codes | GB105034051100 |
WFD (national) typology | R19 |
WFD water body name | |
Pre-project morphology | Single channel |
Reference morphology | Single channel |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | Groundwater |
Dominant substrate | Gravel |
River corridor land use | Intensive agriculture |
Average bankfull channel width category | 2 - 5 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 1500 m1.5 km <br />150,000 cm <br /> |
---|---|
Project started | 2000/08/01 |
Works started | |
Works completed | |
Project completed | 2010/10/01 |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 73 k€73,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Environment Ahgency | Simon | Johnson | ||
Stakeholder engagement and communication | |||||
Works and works supervision | Environment Agency | Rob | Dryden | ||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | bed raising |
Floodplain / River corridor | |
Planform / Channel pattern | channel narrowing |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other | Participation in maintenance |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Invertebrates: Taxonomic composition | Yes | Yes |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://therrc.co.uk/case studies/wensum-%20bintree.pdf | River Restoration Centre Case Study 2009 |
http://therrc.co.uk/case studies/wensum%20at%20bintree%20final.pdf | River Restoration Centre Case Study 2010 |