Case study:Source to Sea Programme

From RESTORE
Revision as of 11:03, 5 August 2013 by Marinela (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

4.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status In progress
Project web site
Themes Economic aspects, Habitat and biodiversity, Social benefits, Water quality
Country England
Main contact forename Richard
Main contact surname Cooper
Main contact user ID
Contact organisation RSPB
Contact organisation web site
Partner organisations Cumbria Wildlife Trust, Cumbria Woodlands, Lune Rivers Trust, Morecambe Bay Partnership, Arnside & Silverdale AONB Partnership
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Morecambe Bay and its river catchments should be considered as one interacting entity. Therefore, the Source to Sea Programme is a pan-Morecambe Bay Catchment Restoration Fund initiative that encompasses restoration projects for a range of waterbodies, protected sites, and associated priority hab-itats and species. The project will restore the natural connections along watercourses (removing barriers) and between water-courses and their floodplains and headwaters (restoring habitats). The project works in partnership with landowners and managers to bring about land management change to benefit water quality and raises awareness amongst Morecambe Bay coastal communities. Diffuse pollution, a lack of riparian habitat, unnatural flow regimes attributable to upland drainage and obstructions to fish passage are causing certain watercourses in the project area to fail to meet the required standards under the Water Framework Directive (WFD). Fish populations, particularly salmonids, have been found to be greatly diminished. To ensure that the failing waterbodies achieve Good Ecological Status under the WFD, the project aims to improve the habitat and connectivity in order to generate sustainable fish populations. The creation of wetland habitats and riparian buffer zones will reduce diffuse pollution from farmland and roads, and some upland drainage grips are to be blocked to encourage a sustainable return to natural flow regimes.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information