Case study:River Darent at Hawley Manor

From RESTORE
Revision as of 17:00, 3 July 2013 by NickRRC (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 25' 30.45" N, 0° 13' 51.03" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology
Country England
Main contact forename Tom
Main contact surname Cook
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.environment-agency.gov.uk/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The River Darent in the Dartford area has been heavily modified over many years,including changes to channel planform, the implementation of land drainage schemes and abstraction,leading to an over widened channel. Prior to restoration this section of river, two miles upstream of Dartford, was very uniform with a shallow gradient and uniform cross section. The natural substrate is dominated by pebbles and gravel but had become overlain by silt. Flow and habitat diversity was limited with negative impacts on fish and macroinvertebrate communities. The aim of the project was to demonstrate that the processes that sustain a healthy chalk stream could be restored and the habitat protected during drought periods. This was to be achieved in a cost-effective way by re-working the in-channel gravels to form a low flow channel. The restoration work contributed to Chalk Rivers Biodiversity Action Plan (BAP) targets and complemented the implementation of the Darent Action Plan (1992).

All of the bed modifications were carried out from within the channel, so the banks and trees were left untouched. The channel was re-profiled using a long reach excavator creating a sinuous channel, with pool and riffle sequences, still within the confines of the original channel. The excavator accessed the river where there were suitable gaps between trees and the creation of gravel berms at these points enabled the excavator to exit the river without damaging the banks.

A low flow channel was created by moving small amounts of gravel in a meandering path within the confines of the wider channel. Part of the bed was kept at a higher elevation to create a sequence of riffles. In other areas more significant quantities of gravel were redistributed enabling pools to be created. Pools, spaced at approximately 20m intervals, were designed to be self-cleaning. Gravels were placed upstream of each to narrow the flow and increase velocity to induce scour in the pools.

The whole of the construction phase was supervised by the designer who was on site throughout the work and provided instructions to the excavator driver. Existing bankside trees with large root systems acted as natural deflectors and provided a variety of marginal habitat. A small amount of planting was carried out, including water crowfoot which was sourced locally from the Darent.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name River Darent at Hawley Manor
WFD water body codes GB106040024222
WFD (national) typology
WFD water body name
Pre-project morphology Over-widened, uniform cross section and shallow gradient
Reference morphology Narrow, sinuous channel with flow variation
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Groundwater
Dominant substrate Chalk
River corridor land use Semi urban
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 250250 m <br />0.25 km <br />25,000 cm <br />
Project started
Works started 2005/09/24
Works completed 2005/09/24
Project completed 2005/09/25
Total cost category 1 - 10 k€
Total cost (k€) 2,114.002,114 k€ <br />2,114,000 € <br />
Benefit to cost ratio
Funding sources Environment Agency

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Substrate conditions Yes Yes Yes No No Improvement

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Invertebrates: Taxonomic composition Yes Yes No Yes No Improvement
Macrophytes Yes Yes Yes Yes No Improvement

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information