Case study:Haltwhistle burn; a total catchment approach
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology, Water quality |
Country | England |
Main contact forename | Ceri |
Main contact surname | Gibson |
Main contact user ID | |
Contact organisation | Tyne Rivers Trust |
Contact organisation web site | http://tyneriverstrust.org/ |
Partner organisations | Haltwhistle Town Council, Northumber-land National Park, Northumberland County Council, Forestry Commission, Natural England, Environment Agency, Newcastle University (NiRES), Hadrian’s Wall Heritage Ltd |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Haltwhistle Burn: ‘a total catchment’ approach is a partnership project which will use CRF funds to improve the whole catchment which has suffered the pressures of quarrying, farming, industry and an increasing population. Although the ‘official’ reasons for failure concern pressures on fish according to the criteria provided by the Water Framework Directive (WFD) this project addresses total waterbody issues deriving from a multitude of pressures, each creating ‘sub-lethal’ but chronic stresses.
Haltwhistle’s ‘Centre of Britain’ identity, together with attraction of Hadrian’s Wall makes it a po-tentially significant tourism centre, with a focus on both heritage and natural features. There are however significant economic difficulties and youth behaviour issues. Haltwhistle Burn is a central focus and has already attracted works of improvement and interpretation by the Haltwhis-tle Partnership.
Since the 2007 floods in the town, Tyne Rivers Trust has nurtured excellent relationships with agencies and extremely enthusiastic individuals directly connected to their catchment. Whilst the project is not a flood defence project this CRF funding now gives us a clear focus for agency action and direct spending on mitigating excess runoff and pollution.
Tyne Rivers Trust have already carried out geomorphological and habitat assessment of the entire burn, concluding that the ‘catchment approach’ would, by combining the small issues, create a significant benefit for the South Tyne and address the WFD ‘poor status’ classification.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information