Case study:Nine Chalk Rivers Project - Glaven Catchment
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Water quality |
Country | England |
Main contact forename | Jonah |
Main contact surname | Tosney |
Main contact user ID | |
Contact organisation | Norfolk Rivers Trust |
Contact organisation web site | |
Partner organisations | Environment Agency, Norfolk Coast AONB, Norfolk Wildlife Trust, Norfolk |
This is a parent project encompassing the following projects |
Project summary
The Nine Chalk Rivers project is a series of 16 restoration projects spread across nine unique chalk rivers flowing onto Norfolk’s north coast. The rivers face similar problems, most nota-bly canalisation, disconnection from the floodplain, siltation, low flows and dif-fuse pollution. The projects are diverse, and include re-meandering, floodplain re-connection, silt and nutrient trapping and catchment management planning. Each project will improve the ecological health of the rivers and floodplains.
To deliver these projects, Norfolk Rivers Trust is working with landowners across Norfolk as well as the Environment Agency, Natural England, The Universi-ty of East Anglia, Norfolk Wildlife Trust, Norfolk Coast AONB, RSPB, The Wild Trout Trust, The River Glaven Conservation Group and various other partners.
The outcomes of the project are the following:improving water quality and river and floodplain habitats.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Glaven Catchment |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | Remeandering |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information