Case study:The Dart and Teign River Improvement Project (DTRIP)
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity, Social benefits, Water quality |
Country | England |
Main contact forename | Layla |
Main contact surname | Ousley |
Main contact user ID | |
Contact organisation | Westcountry Rivers Trust |
Contact organisation web site | |
Partner organisations | Environment Agency, Natural England, Dartmoor National Park, Dart Fisheries Association, Teign Fisheries Association, Duchy of Cornwall, Dartmoor Hill Farm Project, Fountains Forestry, South West Water, Forestry Commission, University College London |
This is a parent project encompassing the following projects |
Project summary
DTRIP is a partnership project that will use CRF funds to manage restoration work and to deliver habitat improvements in the Dart and Teign catchment. The partnership, led by the Westcountry Rivers Trust, has been working together for many years, carrying out river restoration and addressing the causes of Wa-ter Framework Directive issues.Through restoration work, the project will address issues including: sediment, which has a direct adverse effect on water quality; diffuse pollution from agriculture and roads, which can impact on river ecology and causes WFD failures; barriers to fish migration, preventing fish from reaching habitat where modeling shows they should be present; interrupted conveyance of river gravels, resulting in reduced spawning habitats for salmonids; habitat loss of wetted and wooded land that has an important role to play in improving water quality & quantity; acidified moorland that creates low pH levels that are detrimental to ecological health of the rivers.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information