Case study:River Quaggy- Chinbrook meadows

From RESTORE
Revision as of 15:26, 3 August 2012 by Ascarr (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 25' 45.54" N, 0° 1' 38.18" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Social benefits, Water quality
Country England
Main contact forename Dave
Main contact surname Webb
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.environment-agency.gov.uk
Partner organisations QWAG, Lewisham Council
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Chinbrook Meadows soon after the works had completed

Project summary

Edit project overview to modify the project summary.


This project is an excellent example of a partnership initiative that has not only restored the river and floodplain, but has also paid careful attention to improving the park amenities. The channel work was completed in spring 2002 and by September that year there had already been considerable movement of gravels. Natural geomorphological features including a pool/riffle sequence, gravel bars and steeper banks had formed. The pond has been colonised by invertebrates and the vegetation planted along the banks is now providing good cover in both the planted and unplanted sections.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Subcatchment:River Quaggy


Site

Edit site
Name River Quaggy
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Straight, Revetments
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body true
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Artificially regulated, Quick run-off
Dominant substrate Bedrock
River corridor land use Urban
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m)
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient 0.3
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 300 m0.3 km <br />30,000 cm <br />
Project started 2002/03/01
Works started
Works completed 2002/10/01
Project completed
Total cost category
Total cost (k€) 100 k€100,000 € <br />
Benefit to cost ratio
Funding sources Environment Agency

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Riparian development
Hydromorphology Quantity & dynamics of flow, Channel pattern/planform
Biology Invertebrates, Macrophytes
Physico-chemical Oxygen balance
Other reasons for the project Landscape enhancement, Flood risk management


Measures

Edit Measures
Structural measures
Bank/bed modifications Removal of revetments, Introduction of gravels, Planting of native species
Floodplain / River corridor Removal of embankments, Creation of wetlands, Creation of ponds
Planform / Channel pattern Introduction of sinuosity
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Information provision, Consultation


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Invertebrates Yes Yes Yes Improvement
Macrophytes Yes Yes Yes Improvement

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


The river Quaggy in Chinbrook meadows before restoration


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description
http://http://en.wikipedia.org/wiki/Chinbrook Meadows Wikipedia link
http://http://www.therrc.co.uk/case studies/chinbrook meadows.pdf RRC site description
http://www.qwag.org.uk/quaggy/restoration.php Quaggy Waterways Action Plan link
http://http://www.greenchain.com/learning/sites/chinbrook-meadows.php Green chain link

Supplementary Information

Edit Supplementary Information