Case study:Alkborough tidal defence scheme

From RESTORE
Revision as of 09:25, 30 September 2013 by Marinela (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status Complete
Project web site http://www.environment-agency.gov.uk/research/planning/108978.aspx
Themes Flood risk management, Social benefits
Country England
Main contact forename Volker
Main contact surname Stevin
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site
Partner organisations Natural England, Associated British Ports, North Lincolnshire Council, Department for Environment, Food and Rural Affairs (Defra), Yorkshire Forward, Heritage Lottery Fund, European Union (EU)
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Alkborough area

Project summary

Edit project overview to modify the project summary.


Alkborough Flats are on the south bank of the Humber Estuary, on the eastern side of the confluence between the River Trent and the River Humber. The site is around 440 hectares of agricultural land, of which approximately 375 hectares are protected by a flood embankment constructed in the late 1950s. The Alkborough tidal defence scheme increases the level of flood protection to an area stretching from the Humber Bridge to Goole up the tidal River Ouse and as far as Keadby Bridge on the tidal River Trent. The scheme features include a 20 metre-wide breach of the existing flood bank, a 1,500 metre length of lowered embankment or spillway and a new section of floodbank to protect assets at the edge of the site. The scheme has been designed to: reduce the impact of sea level rise; safeguard the internationally important nature conservation interest of the Humber by creating new wetland habitat; provide a focus for education and access opportunities for local communities.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


During works_1
During works_2
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Alkborough
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring

Supplementary funding information

Funding for the scheme has come from the Environment Agency via the Department for Environment, Food and Rural Affairs (Defra,) Yorkshire Forward, the Heritage Lottery Fund and the European Union (EU) through the Interreg programme. The Alkborough Flats project is one of five being funded by the EU through the Interreg programme to promote new approaches to the impacts of sea level rise. Associated British Ports (ABP) have also contributed by allowing some of their land to be used as part of the scheme.



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information