Case study:Sherborne Windrush Restoration Project
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits, Water quality |
Country | England |
Main contact forename | Vaughan |
Main contact surname | Lewis |
Main contact user ID | |
Contact organisation | Cotswold Flyfishers |
Contact organisation web site | http://www.cotswoldsriverstrust.org |
Partner organisations | National Trust; Environment Agency; Defra; River Restoration Centre |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Sherborne Windrush Restoration Project is a partnership project that will use CRF funds to improve the River Windrush and the Sherborne Brook in the Sherborne area of Gloucestershire.
The river suffers from a degraded habitat aris-ing from insensitive dredging which has removed river bed gravels and built up banks causing a disconnect from the water meadows as well as suppressing in stream habitat varia-tion. There are also problems caused by dif-fuse agricultural pollution and areas of over sharing. These issues are preventing this stretch of water from meeting the required standards under the Water Framework Directive (WFD). This project will build on the work already completed by addressing the following issues: inadequate levels of fish spawning gravels; lack of in-stream habitat variation; pollution from agricultural run off; poaching of the banks by cattle; lack of hydrological connectivity with the flood plain; over shading by streamside vegetation.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Site
Name | River Windrush |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | Re-connection to the meadows |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 109.636109.636 k€ <br />109,636 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information