Case study:Nar SSSI project

From RESTORE
Revision as of 17:34, 31 July 2012 by AndyL (talk | contribs) (XML import)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 41' 59.18" N, 0° 36' 42.61" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Spatial planning, Hydromorphology, Monitoring
Country England
Main contact forename
Main contact surname
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Anglian
River basin North West Norfolk

Subcatchment

River name Nar
Area category
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion
Dominant land cover
Waterbody ID



Site

Edit site
Name Narbough Trout Fishery
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Single channel, Straight, Embanked, High width:depth
Reference morphology Sinuous, Pool-riffle
Desired post project morphology
Heavily modified water body true
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Groundwater
Dominant substrate Silt, Sand
River corridor land use Urban, Woodland, Grassland
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 5 - 10 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 1000 m1 km <br />100,000 cm <br />
Project started 2011/02/01
Works started
Works completed 2011/03/01
Project completed
Total cost category Less than 10 k€"Less than 10 k€" is not in the list (Less than 1 k€, 1 - 10 k€, 10 - 50 k€, 50 - 100 k€, 100 - 500 k€, 500 - 1000 k€, 1000 - 5000 k€, 5000 - 10000 k€, more than 10000 k€) of allowed values for the "Total cost category" property.
Total cost (k€) 3 k€3,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Flood defence
Hydromorphology Quantity & dynamics of flow, Flow velocities, Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project Enhancement of flow diversity


Measures

Edit Measures
Structural measures
Bank/bed modifications Creation of shoulders, Material was removed from bed to build out banks, Creation of pools downstream
Floodplain / River corridor
Planform / Channel pattern Narrowing of channel
Other Maintain water vole habitat
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Flow velocities Yes Yes Yes Awaiting results
Quantity & dynamics of flow Yes Yes Yes Awaiting results

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information