Case study:Sowe Valley Project
Project overview
Status | In progress |
---|---|
Project web site | http://www.warwickshirewildlifetrust.org.uk/sowe-valley-project |
Themes | Social benefits, Water quality |
Country | England |
Main contact forename | Anna |
Main contact surname | Squires |
Main contact user ID | |
Contact organisation | Warwickshire Wildlife Trust |
Contact organisation web site | http://www.warwickshirewildlifetrust.org.uk |
Partner organisations | Coventry City Council, Environment Agency, BKW Housing Consortium |
This is a parent project encompassing the following projects |
Project summary
The Sowe Valley Project is a community based river restoration project, working with local communities along an 8 1/2 mile stretch of the River Sowe in Coventry to help improve it for both people and wildlife.
The project, with local volunteers deliver the following work along the valley:
1) himalayan balsam control 2) mink monitoring 3) removal of polluting items from the channel 4) bank side vegetation work to improve light and shade levels in the river 5) bank side planting of native species.
The project has at least 4 volunteer days per month - see the website for full details.
The Sowe Valley project has also supported the formation of the Friends of Sowe Valley, a voluntary group set up to keep the river conservation work going after the project funding ends.
The Sowe Valley Project has received £211,512 of funding from Natural England’s Access to Nature Programme, funded by £25m from the Big Lottery Fund’s Changing Space programme. The project has also received funding from the Environment Agency, BKW housing consortium and kind donations from Warwickshire Wildlife Trust members. It is also supported by Coventry City Council.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Sowe Valley |
---|---|
WFD water body codes | GB109054044660 and GB109054044550 |
WFD (national) typology | |
WFD water body name | River Sowe |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | Yes |
Invasive species present | Yes |
Species of interest | Water Vole, otter (Lutra lutra) |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Predominantly urban corridor, with some agricultual land use |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 8 1/2 miles"/2miles" is not declared as a valid unit of measurement for this property. |
---|---|
Project started | 2009/10/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | Natural England, Big Lottery, Environment Agency, BKW Housing Consortium, Warwickshire Wildlife Trust Members |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://www.facebook.com/#!/pages/Sowe-Valley-Project/132893750072998 | Sowe Valley Facebook Page |
http://www.warwickshirewildlifetrust.org.uk/sowe-valley-project | Sowe Valley Project webpage |
Supplementary Information
Edit Supplementary Information