Case study:3Rivers - Lumburn:Walkham:Tavy

From RESTORE
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 31' 45.52" N, 4° 9' 38.87" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://http://wrt.org.uk/project/3rivers-project/
Themes Water quality
Country England
Main contact forename Hazel
Main contact surname Kendall
Main contact user ID User:David chapman
Contact organisation West Country Rivers Trust
Contact organisation web site http://wrt.org.iluk
Partner organisations Devon Wildlife Trust, South West Water, Tamar Valley AONB, Tavy Walkham and Plym Fishing Club
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The project focused on Water Framework Directive Failures on these three rivers which largely related to phosphate inputs. There are a range of diffuse and point source phosphate inputs into these rivers from both rural and urban sources. We worked with partners to contact farmers who were likely to be having impacts through their land based activities and households who may have impacts through the use of non-mains foul drainage systems.

26 farm visits and associated integrated farm plans were undertaken, three agricultural events were attended and three agricultural demonstrations were delivered (soil decompaction, cross compliance, efficient slurry spreading). Three farm grants (surface water management x 2, streamside fencing) were also completed.

With regard to urban drainage, over 100 of the most vulnerable properties on non-mains drainage were visited to disseminate information on the recently introduced General Binding Rules. Local estate agents were also contacted to help disseminate information on the General Binding Rules as were the caravan/ campsites in this area (8).


Other actions included the completion of 15km of river walkover surveys, engaging and training 14 volunteers, and half a hectare of native broadleaf woodland was planted.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Water chemistry testing was regularly undertaken as part of the project to help identify phosphate sources. This testing was undertaken by Westcountry Rivers Trust and Students from Plymouth University. A more detailed study of metals in these rivers was also undertaken to help to understand more fully the historical issue with regard to heavy metals in the catchments.

Lessons learnt

Edit project overview to modify the lessons learnt.


Relatively short term projects (12 months or less) such as this make it difficult to build moment to any degree and identify and contact the most relevant land/ home owners with regard to impact on the rivers. Higher impact farms, such as the larger dairy units are particularly difficult to engage. Householders on non-mains drainage are also difficult to engage with through the normal methods such as attendance at events and markets etc.; the most effective way of engaging with non-mains drainage householders was through cold calling.

Good numbers of volunteers were available for tasks such as the undertaking of walkover surveys.

Landowners were reticent to plant trees, generally because land is being used for agricultural and the grants available for tree planting aren't significant.

Further water quality monitoring is required to provide greater details of phosphate and other pollution inputs.


Image gallery


Newly planted trees - Lower Tavy
Farmers event - Soil de-compaction, River Walkham
Water Quality Testing, Black Brook, River Walkham
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information