Case study:Wansbeck 100

From RESTORE
Revision as of 09:44, 1 June 2017 by Alexrrc (talk | contribs)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 55° 46' 50.26" N, 2° 4' 44.37" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Water quality
Country England
Main contact forename Peter
Main contact surname Kerr
Main contact user ID
Contact organisation Northumberland Rivers Trust
Contact organisation web site
Partner organisations National Trust, Environment Agency, Community Foundation
This is a parent project
encompassing the following
projects
Wansbeck 100
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Wansbeck and many of its tributaries are currently viewed as ‘failing’ under the requirements of the Water Framework Directive (WFD). The main reason for failure is numbers of fish. The main issue behind this appears to be the amount of silt, sediment and nutrients that are washed into the rivers and streams from farmland and forests. Other factors include weirs that hold up fish migration, and a lack of bank-side and in-stream habitat. This ambitious community project aims to help address these issues, and improve the quality, WFD status and local enjoyment of 100km of river and stream. The rivers and streams that are part of the project include:The Upper Wansbeck; The Font; The Hartburn; The Delf Burn; The Ray Burn. The project will work closely with schools and communities to help renew local interest and ‘ownership’ of the rivers in this rural part of Northumberland. Outputs will include: improvements to fish passage; lengths of fenced buffer strip to filter out sediments; new and improved wetland features to settle out sediment and nutrients; improvements to vehicle crossings; new native woodland; work with farmers and land managers to reduce run-off in ways that reduce their costs; engagement and communications activity with schools, communities and angling clubs.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


During works
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Northumbria
River basin Northumberland Rivers

Subcatchment

River name Wansbeck from Source to Ray Burn
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 347347 m <br />0.347 km <br />34,700 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Improved grassland
Waterbody ID GB103022076960



Site

Name Wansbeck
WFD water body codes GB103022076960
WFD (national) typology
WFD water body name Wansbeck from Source to Ray Burn
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 100,000100,000 m <br />100 km <br />10,000,000 cm <br />
Project started 2012/07/01
Works started
Works completed
Project completed 2015/03/31
Total cost category 100 - 500 k€
Total cost (k€) 465465 k€ <br />465,000 € <br />
Benefit to cost ratio
Funding sources Defra Catchment Restoration Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Water quality
Hydromorphology Continuity for organisms
Biology Fish
Physico-chemical Nutrient concentrations
Other reasons for the project Improved farming practices; Improved community involvement, knowledge and ownership.


Measures

Structural measures
Bank/bed modifications Fenced off riverbank, Weir removal
Floodplain / River corridor Creation of wet woodland, Creation of wetland, Riparian planting
Planform / Channel pattern
Other Hardened crossing points
Non-structural measures
Management interventions
Social measures (incl. engagement) Work with schools and communities
Other Work with farmers and land managers


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents




Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information