Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity, Social benefits, Water quality |
Country | England |
Main contact forename | Richard |
Main contact surname | Cooper |
Main contact user ID | |
Contact organisation | RSPB |
Contact organisation web site | |
Partner organisations | Cumbria Wildlife Trust, Cumbria Woodlands, Lune Rivers Trust, Morecambe Bay Partnership, Arnside & Silverdale AONB Partnership |
This is a parent project encompassing the following projects |
Project summary
Morecambe Bay and its river catchments should be considered as one interacting entity. Therefore, the Source to Sea Programme is a pan-Morecambe Bay Catchment Restoration Fund initiative that encompasses restoration projects for a range of waterbodies, protected sites, and associated priority hab-itats and species. The project will restore the natural connections along watercourses (removing barriers) and between water-courses and their floodplains and headwaters (restoring habitats). The project works in partnership with landowners and managers to bring about land management change to benefit water quality and raises awareness amongst Morecambe Bay coastal communities. Diffuse pollution, a lack of riparian habitat, unnatural flow regimes attributable to upland drainage and obstructions to fish passage are causing certain watercourses in the project area to fail to meet the required standards under the Water Framework Directive (WFD). Fish populations, particularly salmonids, have been found to be greatly diminished.
To ensure that the failing waterbodies achieve Good Ecological Status under the WFD, the project aims to improve the habitat and connectivity in order to generate sustainable fish populations. The creation of wetland habitats and riparian buffer zones will reduce diffuse pollution from farmland and roads, and some upland drainage grips are to be blocked to encourage a sustainable return to natural flow regimes.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Duddon catchments |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information