Case study:Restoring Brent Rivers and Communities: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Case study status}}
{{Case study status}}
{{Location}}
{{Location}}
{{Project overview}}
{{Project overview
|Status=Complete
|Project web site url=https://www.thames21.org.uk/brent-rivers-and-communities/
|Themes=Habitat and biodiversity, Hydromorphology, Social benefits, Urban
|Country=England
|Main contact forename=Carolina
|Main contact surname=Pinto
|Main contact id=Carolfp10
|Contact organisation=Thames 21
|Contact organisation url=www.thames21.org.uk
|Partner organisations=Greggs Foundation, Brent Council, The Rivers Trust
|Name of parent multi-site project=Brent catchment
|Multi-site=Yes
|Project picture=Brent rivers.jpeg
|Picture description=Volunteer Photographing river Brent at Quainton Street Open Space
}}
{{Image gallery}}
{{Image gallery}}
{{Case study image
{{Case study image

Revision as of 18:48, 9 February 2022

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status Complete
Project web site http://https://www.thames21.org.uk/brent-rivers-and-communities/
Themes Habitat and biodiversity, Hydromorphology, Social benefits, Urban
Country England
Main contact forename Carolina
Main contact surname Pinto
Main contact user ID User:Carolfp10
Contact organisation Thames 21
Contact organisation web site http://www.thames21.org.uk
Partner organisations Greggs Foundation, Brent Council, The Rivers Trust
This is a parent project
encompassing the following
projects
Volunteer Photographing river Brent at Quainton Street Open Space

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


LW installation.jpg
LW Deflectors.JPG
Coir.jpg
Large wood Installation.JPEG
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information