Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Land use management - agriculture, Monitoring, Water quality |
Country | England |
Main contact forename | Alex |
Main contact surname | Cripps |
Main contact user ID | |
Contact organisation | Yorkshire Esk Rivers Trust and North York Moors National Park Authority |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Glaisdale Beck faced many pressures, predominantly fine sedimentation, nutrient and organic matter enrichment. This project will work towards achieving good ecological status by 2021.
The main objectives for the Glaisdale Beck Restoration Project are:
1. Engage with key farms: between 7-10 farms
2. One-to-one farm advice (Water Friendly Farming): at 7-10 farms
3. Erect riverside fencing and create buffer strips: ~2km of riparian fencing and associated buffer strips
4. Install infrastructure improvements such as watering points and tracks
5. Tree planting: 200+
6. Large woody debris (materials for multiple sites): at 2+ sites
7. Coppicing (two man days with tractor): at 2 sites
8. Small-scale bank stabilisation (materials for multiple sites): at 2+ sites
Improvement works are focused on reducing the source of fine sediment, nutrients and bacterial loading primarily by addressing stretches of Glaisdale Beck (and associated ditch networks) where degraded habitat and large areas of poached bank sides were evident. Improvement works included: erecting livestock fencing to prevent access to Glaisdale Beck (and associated ditches), creating buffer strips to filter surface runoff by promoting natural re-vegetation and reducing bank erosion, providing alternative livestock watering points, addressing poached crossing points and planting trees to help create a riparian woodland corridor. The Catchment Partnership Officer's role was to work closely with local land managers, draw up and deliver works, and also work closely with the local Catchment Sensitive Farming (CSF) Officer to ensure the Glaisdale Beck Restoration Project worked alongside the new Countryside Stewardship Scheme.
Glaisdale Beck Restoration Project has delivered improvement works to reduce the impact of diffuse pollution that arises from rural land use. This project is working towards preventing further deterioration of this waterbody, and working towards achieving good ecological status.
Yorkshire Esk Rivers Trust has engaged with nine key land managers in the dale, providing one-to-one Water Friendly Farming advice. 2927m of riparian fencing has been installed along Glaisdale Beck, key tributaries and associated ditched networks, reducing sediment and phosphate pathways. Over 1.5ha of buffer strips have been created to promote natural regeneration of trees and allow vegetation such as Greater woodrush to establish in these un-grazed strips. Two cattle pasture pumps and six livestock draining bays have been installed and 65 trees have been planted in the new buffer strips to increase the tree age structure in the dale. 20m of bank stabilisation work has also been undertaken.
Additional benefits as a result of this project include - 1. The Esk is a Drinking Water Protected Area, and work will improve raw water quality which will help reduce water treatment costs, 2) Overall biodiversity will improve - robust and connected habitats supporting a diverse range of species will provide more resilience to other pressures such as global climate change, 3) Fish populations will benefit from the improved spawning habitat (with a knock on benefit to the endangered freshwater pearl mussel), 4) Reducing bacterial loading from livestock will benefit the bathing water quality downstream, 5) Recreation and associated economic costs will benefit; wildlife watching, angling, freshwater activities such as boating, bathing water/coastal recreation, 6) Improving farm infrastructure will have knock on benefits for farm productivity/and farm business gains, 7) Water Friendly Farming leaflet circulation and one-to-one farm advice will improve local rural education on best practice, 8) Engaging with key farmers and building up good relationships, along with the opportunity to complete detailed surveys of the catchment has built up a picture of further priority works which need to be delivered to work towards achieving good ecological status by 2021, 9) Lessons learnt from this project will benefit the wider Esk and Coastal Streams catchment and help shape future restoration projects/habitat improvement works.
Monitoring surveys and results
To record the length of riparian habitat not accessed by stock - on farm surveys and mapping were undertaken to create a baseline of the area prior to improvement works being delivered. An additional layer of final improvement works has subsequently been mapped.
To monitor the increase of ground cover and abundance and diversity of plant and tree species in newly created buffer strips - fixed point photographs have been taken before improvement works have been undertaken, and taken again very shortly after works have been completed. As we expect an ecological lag time to detect the benefits of the improvement works delivered, these fixed point photographs will be repeated again at key sites in three years time to assess long term change.
To monitor newly planted trees and ensure tree stakes and guards are upright and secure. Monitor large woody debris and bank stabilisation - newly planted trees will be monitored over the next five years by each farmer, who will report to the Catchment Partnership Officer if any have died (so that we can replace them), or if any work is needed such as re-staking after high flow conditions. (Large woody debris work was not undertaken and bank stabilisation work will be monitored using fixed-point photographs).
To monitor water quality, before and after restoration works, and highlight and pollution incidents - we have baseline data of macro-invertebrate monitoring (to family level identification and resulting BMWP scores); (three minute kick samples at 8 sites) from samples collected in Autumn 2014 and Spring 2015. We have some Riverfly Monitoring surveys before restoration works at two sites on Glaisdale Beck. Following the restoration works Riverfly Monitoring is being undertaken at two sites each month from May - October in 2016 and will continue in future years as we expect an ecological lag time (around three years for invertebrates). Our Riverfly Monitoring volunteers are now also recording phosphate and nitrate levels. We also hope to develop a new monitoring site in Glaisdale Beck to assess phosphate levels.
Following the commencement of the works (May 2016), an ecological lag time is expected before benefits to water quality and the riparian habitat will be evident. A monitoring planner will enable us to record these benefits in due course.
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|