Case study:River Slea Rehabilitation: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 23: Line 23:


In 2015 section two was completely uniform with no pools or any habitat features. Following the work, 22 berms were constructed providing cover for fish and providing deeper areas that would help maintain the depth during low flow periods. Planting was successful, and in time, the vegetation will grow and create a natural meandering flow.
In 2015 section two was completely uniform with no pools or any habitat features. Following the work, 22 berms were constructed providing cover for fish and providing deeper areas that would help maintain the depth during low flow periods. Planting was successful, and in time, the vegetation will grow and create a natural meandering flow.
|Lessons learn=Work could not be carried out in section 3 due to the firmness of the riverbed. It is reccomended in the future that the firmness of the riverbed should be tested to ensure habitat improvement works can be carried out.  
|Lessons learn=Work could not be carried out in section 3 due to the firmness of the riverbed. It is reccomended in the future that the firmness of the riverbed should be tested to ensure habitat improvement works can be carried out.  
Install coir matting vegetation at the same time as installing brushwood, we had to rely on individual plug plants when planting. Although plugs are cheaper than matting.
Install coir matting vegetation at the same time as installing brushwood, we had to rely on individual plug plants when planting. Although plugs are cheaper than matting.
}}
}}

Revision as of 15:29, 3 January 2017


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Social benefits, Urban
Country England
Main contact forename Marie
Main contact surname Taylor
Main contact user ID
Contact organisation Lincolnshire Rivers Trust
Contact organisation web site http://www.lincsrivers.org.uk/
Partner organisations The Wild Trout Trust
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Section 2 following faggot installation to create berms with the help of volunteers

Project summary

Edit project overview to modify the project summary.


The River Slea is an 18 mile long tributary of the River Witham, Lincolnshire. The River Slea is groundwater fed from Lincolnshire limestone aquifer and the flow depends on the on groundwater levels. Historically the River Slea flowed all year round. In the early 60s the flow of the river began to slow and ceased in 1962. This was due to a number of reasons such as over abstraction, increase in population and changes in weather cycles. After a public campaign in 1992, a pump was installed by the Environment Agency which delivers groundwater to the river at times of no flow. The Lincolnshire Rivers Trust (LRT) commissioned Clear Environmental to deliver the Sleaford Urban Opportunities Study, which was funded by Natural England. This study highlighted how the river would benefit from various rehabilitation techniques to enable wildlife to be more resilient during low flow periods and also contribute towards WFD objectives. With the help of the Wild Trout Trust, three sections of river were identified where restoration could be completed, this covered approximately 1.2km of river. Unfortunately, due to site constraints, work could only be completed on two sections (sections one and two). There were three phases to the works completed, these are detailed below;

Phase 1: Using an excavator, a low flow channel was created in section one and pools were created in section two. River bed material removed was used to create berms and meanders within the existing channel.

Phase 2: Brushwood bundles were installed, to construct berms which created pinch points, narrowing the channel to speed up the flow and maintain the pools created. This part of the project was made possible with the help of volunteers.

Phase 3: Planting of vegetation using coir matting and plug plants, to increase the rate of colonisation of berms and make them appear more natural.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


In September 2015, section one of the river was completely dry, but following the creation of the low flow channel, in September 2016 there was still 1ft of water retained within that section.

Before the works were completed, a water vole survey carried out in 2015 only found old unused burrows, with no signs of water voles. In 2016 another water vole survey was carried out, detecting 12 feeding stations and four latrines.

In 2015 section two was completely uniform with no pools or any habitat features. Following the work, 22 berms were constructed providing cover for fish and providing deeper areas that would help maintain the depth during low flow periods. Planting was successful, and in time, the vegetation will grow and create a natural meandering flow.

Lessons learnt

Edit project overview to modify the lessons learnt.


Work could not be carried out in section 3 due to the firmness of the riverbed. It is reccomended in the future that the firmness of the riverbed should be tested to ensure habitat improvement works can be carried out. Install coir matting vegetation at the same time as installing brushwood, we had to rely on individual plug plants when planting. Although plugs are cheaper than matting.