Case study:Improving water quality in Loweswater: Difference between revisions
Jump to navigation
Jump to search
Hazel Wilson (talk | contribs) No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
Line 35: | Line 35: | ||
|Project started=2012/07/01 | |Project started=2012/07/01 | ||
|Project completed=2015/03/01 | |Project completed=2015/03/01 | ||
|Total cost category=100 - 500 k€ | |||
|Total1 cost=350 | |||
|Funding sources=Defra Catchment Restoration Fund | |Funding sources=Defra Catchment Restoration Fund | ||
}} | }} |
Revision as of 15:45, 15 March 2016
Location: 54° 34' 59.62" N, 3° 21' 24.07" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity, Social benefits, Water quality |
Country | England |
Main contact forename | Leslie |
Main contact surname | Webb |
Main contact user ID | |
Contact organisation | West Cumbria Rivers Trust |
Contact organisation web site | http://westcumbriariverstrust.org/ |
Partner organisations | National Trust, Environment Agency, Natural England, United Utilities, Centre for Ecology and Hydrology, University College London, Cumbria Wildlife Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
To ensure that Loweswater achieves good ecological status under the WFD, diffuse pollution will be reduced through changes to farming practices and restoration of tributaries, and methods will be trialled to reduce algal populations within the lake including ultrasound and wind-powered aerating and mixing equipment.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|