Case study:Improving water quality in Loweswater: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Status=In progress
|Status=Complete
|Themes=Economic aspects, Habitat and biodiversity, Social benefits, Water quality
|Themes=Economic aspects, Habitat and biodiversity, Social benefits, Water quality
|Country=England
|Country=England
Line 12: Line 12:
|Main contact surname=Webb
|Main contact surname=Webb
|Contact organisation=West Cumbria Rivers Trust
|Contact organisation=West Cumbria Rivers Trust
|Contact organisation url=westcumbriariverstrust.org/
|Partner organisations=National Trust, Environment Agency, Natural England, United Utilities, Centre for Ecology and Hydrology, University College London, Cumbria Wildlife Trust
|Multi-site=No
|Multi-site=No
|Project picture=Loweswater.jpg
|Project picture=Loweswater.jpg

Revision as of 15:44, 15 March 2016

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 54° 34' 59.62" N, 3° 21' 24.07" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Economic aspects, Habitat and biodiversity, Social benefits, Water quality
Country England
Main contact forename Leslie
Main contact surname Webb
Main contact user ID
Contact organisation West Cumbria Rivers Trust
Contact organisation web site http://westcumbriariverstrust.org/
Partner organisations National Trust, Environment Agency, Natural England, United Utilities, Centre for Ecology and Hydrology, University College London, Cumbria Wildlife Trust
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


To ensure that Loweswater achieves good ecological status under the WFD, diffuse pollution will be reduced through changes to farming practices and restoration of tributaries, and methods will be trialled to reduce algal populations within the lake including ultrasound and wind-powered aerating and mixing equipment.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district North West
River basin Derwent (NW)

Subcatchment

River name Dub (Park) Beck
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 611611 m <br />0.611 km <br />61,100 cm <br />
Dominant geology Siliceous
Ecoregion Great Britain
Dominant land cover Acid Grassland
Waterbody ID GB112075070360



Site

Name
WFD water body codes GB112075070360
WFD (national) typology
WFD water body name Dub (Park) Beck
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2012/07/01
Works started
Works completed
Project completed 2015/03/01
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Defra Catchment Restoration Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident, Riparian development
Hydromorphology
Biology Phytoplankton
Physico-chemical Nutrient concentrations
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions Non/agricultural business changed its way of working
Social measures (incl. engagement) Community involvement
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents




Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information