Case study:Wandle River Restoration Project: Hackbridge: Difference between revisions
No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
Line 33: | Line 33: | ||
|Subcatchment=Wandle (Carshalton Branch at Carshalton) | |Subcatchment=Wandle (Carshalton Branch at Carshalton) | ||
}} | }} | ||
{{Site}} | {{Site | ||
|WFD water body code=GB106039017640 | |||
|WFD water body name=Wandle (Carshalton Branch at Carshalton) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
}} | |||
{{Project background | {{Project background | ||
|Project started=2012/09/01 | |Project started=2012/09/01 |
Revision as of 13:46, 2 November 2015
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | http://www.wandletrust.org/wp-content/uploads/2014/07/Culvers_Island_Info_for_Website_pdf.pdf |
Themes | Habitat and biodiversity, Hydromorphology, Social benefits |
Country | England |
Main contact forename | Tim |
Main contact surname | Longstaff |
Main contact user ID | User:JoshRRC |
Contact organisation | Wandle Trust |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This project is one of four sites in the Wandle River Restoration Project being delivered through the Defra Catchment Restoration Fund.
Four weirs were removed and 125m of river narrowed using bioengineering techniques. An island was regraded and a backwater created with 250 tonnes of gravel used to enhance geomorphology and habitat along with 6000 plants planted by volunteers.
Designs were developed based on detailed 2D flood modelling undertaken in conjunction with cbec eco-engineering. Practical works were deliverd during summer 2014 with appointed contractors, Cain Bioengineering.
Monitoring surveys and results
Lessons learnt
Challenges:
- Very urban nature of the site. Complex flood modelling and design was required.
- Multiple underground utilities which had to be identified and avoided during the works.
- Many and varied stakeholder needs and opinions.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Butter Hill Phase 2, River Wandle Restoration Project, River Wandle: Butter Hill Phase 1, River Wandle: Silt & SuDs
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|