Case study:Plough Lane weir removal: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 35: Line 35:
}}
}}
{{Site
{{Site
|Name=
|WFD water body code=GB106039023460
   
|WFD water body name=Wandle (Croydon to Wandsworth) and the R. Gravney
   
|Heavily modified water body=No
     
|Protected species present=No
|WFD water body code=
|Invasive species present=No
     
|WFD (national) typology=
     
|WFD water body name=
     
|Pre-project morphology=
     
|Reference morphology=
     
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Project_background

Revision as of 10:36, 27 October 2015

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 26' 2.19" N, 0° 11' 26.53" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Flood risk management, Habitat and biodiversity
Country England
Main contact forename Tanya
Main contact surname Houston
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.gov.uk/government/organisations/environment-agency
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Primary objectives - Reprofile reach, improve instream diversity, naturalise the flow regime, introduce a pool-riffle sequence and reduce the backwater effect. Secondary objectives include to narrow the river channel, manage flood risk, improve water quality, introduce gravels and woody debris, improve fish stocks and passage for fish and eel. Complete removal of a weir on Plough Lane, and enhancement works.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Photographs pre-works
Fisheries survey
Photographs post-works

Lessons learnt

Edit project overview to modify the lessons learnt.


Outlined hydromorph and ecological objectives set. Seen to have a beneficial impact on reach profile, water level, flood risk, instream diversity, flow regime, spawning habitats and macrophytes/phytobenthos. Extremely positive impact on reducing the backwater effect, and in improving fish stocks and passage.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin London

Subcatchment

River name Wandle (Croydon to Wandsworth) and the R. Gravney
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 282282 m <br />0.282 km <br />28,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Suburban
Waterbody ID GB106039023460



Other case studies in this subcatchment: Beddington Park, Beddington Park Enhancements, Boulder Pool and Plough Lane, Durand Close, EDF Weir removal, Eel Pass over tilting weir at Ravensbury Park, Garratt Park, Hackbridge Restoration, Hackbridge weir notch, King Georges Park... further results


Site

Name
WFD water body codes GB106039023460
WFD (national) typology
WFD water body name Wandle (Croydon to Wandsworth) and the R. Gravney
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2010/01/01
Works started
Works completed 2010/01/01
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Barriers to fish migration, Flood risk management
Hydromorphology
Biology Fish
Physico-chemical Nutrient concentrations
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Bank reprofiling, Gravel placement, Installation of LWD
Floodplain / River corridor
Planform / Channel pattern Creation of pools and riffles
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information