Case study:Charlton St Peter A 8: Difference between revisions
No edit summary |
No edit summary |
||
Line 26: | Line 26: | ||
|Subcatchment=Hampshire Avon (West) | |Subcatchment=Hampshire Avon (West) | ||
}} | }} | ||
{{Site}} | {{Site | ||
|WFD water body code=GB108043022370 | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
}} | |||
{{Project background}} | {{Project background}} | ||
{{Motivations}} | {{Motivations}} |
Revision as of 10:54, 1 September 2015
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Flood risk management, Habitat and biodiversity |
Country | England |
Main contact forename | Mike |
Main contact surname | Porter |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project |
Case_study:Strategic Framework for Restoration of the River Avon (SFfRRA) |
This is a parent project encompassing the following projects |
No |
Project summary
This reach is located at Charlton St Peter and is 1945m in length. The reach is designated SSSI but not SAC. There is good marginal habitat along both banks due to electric fencing being used to protect the banks from livestock. The upstream end of the channel is deeply incised with low floodplain connectivity as a result; the upstream end of the reach may have been dredged in the past. Ranunculus fluitantis is prevalent when the channel opens up and is not densely shaded. There is a private fishery nearby managed by the Rushall Estate.
There is evidence that the channel downstream of Charlton St Peter has been dredged. This has resulted in the formation of some high levees adjacent to the channel, which cut off the river from the floodplain and over-shades it in places.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: France Farm (Phase 1) A 9
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|