Case study:Knepp Rewilding Project: Difference between revisions
Penny Green (talk | contribs) No edit summary |
Penny Green (talk | contribs) No edit summary |
||
Line 59: | Line 59: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Creation of 1 km of new meandering river channel with naturally variable bed and bank profiles | |Bank and bed modifications measure=Creation of 1 km of new meandering river channel with naturally variable bed and bank profiles. Re-naturalisation of an additional 1.5 km of channel through bank reprofiling. The uniform, high banks were “pushed” into the channel to create a low flow channel with natural bank profiles that support a range of emergent and marginal habitats. | ||
|Floodplain / River corridor=Using a historical course of the river as a basis, the new channel has a much smaller capacity that the modified channel that it replaced, concentrating low flows and improving floodplain connectivity during periods of higher flow. Blocking and diversion of floodplain drains and creation of scrapes to retain water on the floodplain | |||
|Other technical measure=Removal of two obsolete in-channel structures to restore natural flow and sediment transport processes and allow the free passage of fish. Creation of two backwaters to provide valuable habitats for aquatic plants and invertebrates. | |||
|Management interventions=Installation of large woody debris to increase flow and habitat diversity | |Management interventions=Installation of large woody debris to increase flow and habitat diversity | ||
}} | }} |
Revision as of 12:48, 14 May 2015
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://knepp.co.uk |
Themes | Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Social benefits, Water quality |
Country | England |
Main contact forename | Penny |
Main contact surname | Green |
Main contact user ID | User:Penny Green |
Contact organisation | Knepp Castle Estate |
Contact organisation web site | http://knepp.co.uk |
Partner organisations | Environment Agency, Sussex Wildlife Trust, West Sussex County Council and Natural England |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Jointly funded by Natural England and the Knepp Estate, the restoration of the upper reaches of the River Adur lies at the heart of the largest rewilding project in lowland UK.
The work, carried out by the Environment Agency, has involved removing 4 weirs, returning 2.4km of canalised river to its original meanders and linking it to 5.5kms of restored floodplain upstream.
It is part of a landscape-scale conservation enterprise aimed at restoring the full range of hydrological processes from the moment raindrops fall on the land, filtering through vegetation and the soil, to their passage into watercourses towards the sea.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|