Case study:Louds Mill (Downstream)m Enhancement: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=50.71235916658981, -2.413497269153595 }} {{Project overview |Project title=Louds Mill (Downstream)m Enhancem...")
 
No edit summary
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Louds Mill (Downstream)m Enhancement
|Status=Complete
|Status=Complete
|Themes=Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology
|Themes=Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology
Line 14: Line 13:
|Main contact id=Alymaxwell
|Main contact id=Alymaxwell
|Contact organisation=Environment Agency
|Contact organisation=Environment Agency
|Name of parent multi-site project=Case_study:River Frome Rehabilitation Plan
|Multi-site=No
|Multi-site=No
|Name of parent multi-site project=Case_study:River Frome Rehabilitation Plan
|Project picture=1b Louds Mill Project Record.pdf
|Picture description=Louds Mill Project Record
|Project summary=The reach downstream of Louds Mill was an over wide channel with little marginal vegetation and poor in channel bed morphology.  During low flows the river was spread over the whole width of the channel leading to a shallow river.  Spawning potential in the reach were limited due to compacted and over silted gravels.  There was also very little cover and in channel structure provided by tree and in channel woody debris.
 
The River Frome Rehabilitation Plan states the main proposals to improve the SSSI condition and WFD objectives of unit 1b and to incorporate as part of the Louds Mill Enhancement were to: a) reprofile banks (to narrow the low flow channel and improve the marginal zone b) to reprofile river bed (to clean the gravels of silt break its compacted nature – improving spawning potential) c) introduce large woody debris to the reach (d) new riparian tree planting (willow whips to be inserted into the bank edges and soft margins at key locations.
 
|Monitoring surveys and results=Pre works electro fishing was complete.  This is due for repeat in 2015
|Lessons learn=The technique of installing Large Woody Debris at this site involved digging a trench securing up to a third of the limb in the trench with the remaining in the channel.  By using the thicker end of the limb in the trench it left only the thinner branches in the river.
 
Ideally the wood shoul dbe as large as possible when in the river to ensure it will be long lasting and have as big an impact on the flows lcoally as possible.
}}
}}
{{Image gallery}}
{{Image gallery}}

Revision as of 14:03, 8 July 2014

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 42' 44.49" N, 2° 24' 48.59" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology
Country England
Main contact forename Aly
Main contact surname Maxwell
Main contact user ID User:Alymaxwell
Contact organisation Environment Agency
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:River Frome Rehabilitation Plan

This is a parent project
encompassing the following
projects
No

File:1b Louds Mill Project Record.pdf

Project summary

Edit project overview to modify the project summary.


The reach downstream of Louds Mill was an over wide channel with little marginal vegetation and poor in channel bed morphology. During low flows the river was spread over the whole width of the channel leading to a shallow river. Spawning potential in the reach were limited due to compacted and over silted gravels. There was also very little cover and in channel structure provided by tree and in channel woody debris.

The River Frome Rehabilitation Plan states the main proposals to improve the SSSI condition and WFD objectives of unit 1b and to incorporate as part of the Louds Mill Enhancement were to: a) reprofile banks (to narrow the low flow channel and improve the marginal zone b) to reprofile river bed (to clean the gravels of silt break its compacted nature – improving spawning potential) c) introduce large woody debris to the reach (d) new riparian tree planting (willow whips to be inserted into the bank edges and soft margins at key locations.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Pre works electro fishing was complete. This is due for repeat in 2015

Lessons learnt

Edit project overview to modify the lessons learnt.


The technique of installing Large Woody Debris at this site involved digging a trench securing up to a third of the limb in the trench with the remaining in the channel. By using the thicker end of the limb in the trench it left only the thinner branches in the river.

Ideally the wood shoul dbe as large as possible when in the river to ensure it will be long lasting and have as big an impact on the flows lcoally as possible.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information