(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=51.88573855172504, 0.560397282242775 }} {{Project overview |Project title=Bocking Blackwater River Restorati...")
 
No edit summary
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Bocking Blackwater River Restoration
|Status=In progress
|Status=In progress
|Country=England
|Country=England
Line 15: Line 14:
|Contact organisation url=www.essexwt.org.uk
|Contact organisation url=www.essexwt.org.uk
|Multi-site=No
|Multi-site=No
|Project summary=Currently, the River Blackwater (Pant, upstream) is classed under the WFD framework as being heavily modified with poor potential. It is this assessment that drives the restoration project. This project is funded by the Environment Agencies Catchment Restoration fund and is part of the Essex Healthy headwaters scheme. Physical earthworks are due to commence in Winter 2014/15
The two main aspects  the first is to repair river banks to reduce erosion, poaching and silt inputs, the second is to improve riparian habitat diversity by sensitively thinning tree's and installing a new wetland area including ponds and sedge beds at an area known locally as the Spreads. 
The river banks will be restored using a mixture of bioengineering schemes including Coir roles, willow spiling and bank re-profiling, the aim is to restore 466 metres of bank, establishing emergent vegetation, decreasing silt input from the eroding banks and reducing the poaching effect from dog walkers.
New wetland habitat will be created at an area know as the spreads. This will involve creating three new ponds and diverting an existing land drain.
|Monitoring surveys and results=Fixed point photography will be used to monitor physical changes both post and pre work. In addition a baseline survey of macrophytes, invertebrates and water quality surveys – data gathered will include – turbidity, sediment, Ammonia/Dissolved Oxygen/Phosphate using field phosphate sampling equipment. This project site will be resurveyed against baseline at the conclusion of the project in 2015.
}}
}}
{{Image gallery}}
{{Image gallery}}

Revision as of 15:10, 6 June 2014

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 53' 8.66" N, 0° 33' 37.43" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes
Country England
Main contact forename Kieren
Main contact surname Alexander
Main contact user ID User:KierenAlexander
Contact organisation Essex Wildlife Trust
Contact organisation web site http://www.essexwt.org.uk
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Currently, the River Blackwater (Pant, upstream) is classed under the WFD framework as being heavily modified with poor potential. It is this assessment that drives the restoration project. This project is funded by the Environment Agencies Catchment Restoration fund and is part of the Essex Healthy headwaters scheme. Physical earthworks are due to commence in Winter 2014/15

The two main aspects the first is to repair river banks to reduce erosion, poaching and silt inputs, the second is to improve riparian habitat diversity by sensitively thinning tree's and installing a new wetland area including ponds and sedge beds at an area known locally as the Spreads.

The river banks will be restored using a mixture of bioengineering schemes including Coir roles, willow spiling and bank re-profiling, the aim is to restore 466 metres of bank, establishing emergent vegetation, decreasing silt input from the eroding banks and reducing the poaching effect from dog walkers.

New wetland habitat will be created at an area know as the spreads. This will involve creating three new ponds and diverting an existing land drain.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Fixed point photography will be used to monitor physical changes both post and pre work. In addition a baseline survey of macrophytes, invertebrates and water quality surveys – data gathered will include – turbidity, sediment, Ammonia/Dissolved Oxygen/Phosphate using field phosphate sampling equipment. This project site will be resurveyed against baseline at the conclusion of the project in 2015.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information