Case study:River Thame Catchment Conservation Project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 122: Line 122:
{{Other_responses_header}}
{{Other_responses_header}}
{{End_table}}
{{End_table}}
{{Monitoring_documents}}
{{Monitoring documents}}
{{Case study monitoring documents
|Monitoring document=TH022 monitoring framework table.docx
|Description=RRC Monitoring table - River Thame
}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Additional Documents}}
{{Additional Documents}}

Revision as of 14:26, 28 April 2014

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 42' 29.17" N, 1° 8' 4.23" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Economic aspects, Habitat and biodiversity, Social benefits, Water quality
Country England
Main contact forename Pascale
Main contact surname Nicolet
Main contact user ID
Contact organisation The Freshwater Water Habitats Trust
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The project has two main objectives (i) to install a comprehensive range of diffuse pollution control and biodiversity enhancement measures in a pilot area covering c.40km2 on the lower Thame which can subsequently be rolled out across the whole catchment. (ii) to complete the preparation of a strategic overview plan for the River Thame catchment, jointly developed by all catchment partners, to maximise the benefits of stakeholder involvement in achieving the aims of the Water Framework Directive. The overview plan will apply the techniques and lessons learned in the pilot area, and elsewhere, to outline a rolling programme of practical works throughout the Thame catchment.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin Thame and South Chilterns

Subcatchment

River name Thame (Scotsgrove Brook to Thames)
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 154154 m <br />0.154 km <br />15,400 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB106039030240



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Defra Catchment Restoration Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident, Riparian development
Hydromorphology
Biology Invertebrates, Macrophytes
Physico-chemical Nutrient concentrations, PH, Salinity
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Community involvement
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents




Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information