Case study:Kentchurch Weir Removal: Difference between revisions
Mattleeson (talk | contribs) No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location |
Revision as of 15:41, 30 August 2012
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | River Restoration Centre |
Contact organisation web site | |
Partner organisations | Environment Agency Wales, Atkins |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
In 2008, EA Wales and Atkins completed a project to install a fish pass at Osbaston, downstream of Kentchurch Weir - to improve fish passage upstream. However, the 2 metre high Kentchurch Weir posed as a significant and impassable barrier to fish passage further upstream. A £100,000, 18 month-long project was undertaken, beginning in 2008, to remove this structure and open up the upper reaches of the Monnow.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Site
Name | Monnow at Kentchurch Weir |
---|---|
WFD water body codes | GB109055029720 |
WFD (national) typology | Mid, Medium, Calcareous |
WFD water body name | R Monnow - conf Afon Honddu to conf R Wye |
Pre-project morphology | High width:depth. Significant backwater upstream of impoundment. |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | 2011/08/01 |
Works completed | 2012/08/15 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 120120 k€ <br />120,000 € <br /> |
Benefit to cost ratio | |
Funding sources | UK European Fisheries Fund Operational Programme |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | Weir removed to allow free fish passage upstream. |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Bathymetric Survey | Yes | No | No | Yes | No | |
Sediment Contamination Assessment | Yes | No | No | Yes | No |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information
Considered to be the largest ever weir removal undertaken in Wales. Removal has allowed 160km of the Monnow catchment to be restored to its natural condition of flow and connectivity.