Case study:Babbs Mill reed bed: Difference between revisions
No edit summary |
No edit summary |
||
Line 22: | Line 22: | ||
A new reed bed has been created (March 2013) to improve water quality in Babbs Mill lake by cleansing the urban watercourse which flows through York’s Wood. | A new reed bed has been created (March 2013) to improve water quality in Babbs Mill lake by cleansing the urban watercourse which flows through York’s Wood. | ||
The watercourse itself was restored as it was moved out of its existing concrete channel and into a more natural | The watercourse itself was restored as it was moved out of its existing concrete channel and into a more natural course. | ||
It's hoped that the more natural and visible watercourse will help deter fly tipping and increase the reporting of pollution incidents. | |||
A shallow-water shelf was also created in Babbs Mill Lake from material excavated during the creation of the reedbed. This area will be allowed to develop into a second reed bed to provide additional treatment of the watercourse. | A shallow-water shelf was also created in Babbs Mill Lake from material excavated during the creation of the reedbed. This area will be allowed to develop into a second reed bed to provide additional treatment of the watercourse. |
Revision as of 03:15, 19 March 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Urban |
Country | England |
Main contact forename | Will |
Main contact surname | Groves |
Main contact user ID | User:Wgroves |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | Environment Agency, Solihull Metropolitan Borough Council, Friends of Kingfisher Park |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The project will help improve the water quality of both Babb’s Mill lake and the River Cole and should also eradicate the unpleasant smell associated with one of the waterways in the area, known locally as the ‘smelly brook’.
A new reed bed has been created (March 2013) to improve water quality in Babbs Mill lake by cleansing the urban watercourse which flows through York’s Wood.
The watercourse itself was restored as it was moved out of its existing concrete channel and into a more natural course.
It's hoped that the more natural and visible watercourse will help deter fly tipping and increase the reporting of pollution incidents.
A shallow-water shelf was also created in Babbs Mill Lake from material excavated during the creation of the reedbed. This area will be allowed to develop into a second reed bed to provide additional treatment of the watercourse.
Photos of the scheme are available at http://www.flickr.com/photos/environment-agency/sets/72157632746487191/#
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|