|Project summary=Background: The River Skerne is a tributary of the River Tees in North East England. The 2 km long rehabilitation reach lies in a sub-urban area on the outskirts of Darlington, County Durham. During the last 150 years, the River Skerne has been heavily modified as a result of industrialisation and urbanisation. Between 1850 and 1945 the river was straightened and channelized, and the river corridor was markedly narrowed. Widening and deepening was undertaken in the 1950s and the 1970s, and new housing developments were built along the entire north side of the river. The area has a rich industrial heritage including the first railway company Stockton and Darlington. The Skerne (railway) Bridge, which can be found just downstream of the site, was pictured on the old five pound notes.
|Project summary=Background: The River Skerne is a tributary of the River Tees in North East England. The restored reach lies in a sub-urban area on the outskirts of Darlington, County Durham. During the last 150 years, the River Skerne has been heavily modified as a result of industrialisation and urbanisation. Between 1850 and 1945 the river was straightened and channelized, and the river corridor was markedly narrowed. Widening and deepening was undertaken in the 1950s and the 1970s, and new housing developments were built along the entire north side of the river. The area has a rich industrial heritage including the first railway company Stockton and Darlington. The Skerne (railway) Bridge, which can be found just downstream of the site, was pictured on the old five pound notes.


Restoration: The River Skerne was included in a joint initiative between England and Denmark to demonstrate best practice in urban and rural river rehabilitation and encourage river restoration in Europe. The wider aim was to promote further river restoration and demonstrate how river restoration could provide multiple benefits such as enhancement in wildlife, landscape, recreation, water quality, fisheries, amenities and other local interests.  
Restoration: The River Skerne was included in a joint initiative between England and Denmark to demonstrate best practice in urban and rural river rehabilitation and encourage river restoration in Europe. The wider aim was to promote further river restoration and demonstrate how river restoration could provide multiple benefits such as enhancement in wildlife, landscape, recreation, water quality, fisheries, amenities and other local interests.  

Revision as of 10:51, 21 February 2014

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 54° 32' 11.23" N, 1° 31' 48.41" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Economic aspects, Habitat and biodiversity, Social benefits, Water quality, Urban
Country England
Main contact forename RRC
Main contact surname River Restoration Centre
Main contact user ID User:NickRRC
Contact organisation Life Project
Contact organisation web site http://www.therrc.co.uk
Partner organisations River Restoration Centre, Darlington Borough Council, Environment Agency, Natural England
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Aerial view of the completed Skerne works

Project summary

Edit project overview to modify the project summary.


Background: The River Skerne is a tributary of the River Tees in North East England. The restored reach lies in a sub-urban area on the outskirts of Darlington, County Durham. During the last 150 years, the River Skerne has been heavily modified as a result of industrialisation and urbanisation. Between 1850 and 1945 the river was straightened and channelized, and the river corridor was markedly narrowed. Widening and deepening was undertaken in the 1950s and the 1970s, and new housing developments were built along the entire north side of the river. The area has a rich industrial heritage including the first railway company Stockton and Darlington. The Skerne (railway) Bridge, which can be found just downstream of the site, was pictured on the old five pound notes.

Restoration: The River Skerne was included in a joint initiative between England and Denmark to demonstrate best practice in urban and rural river rehabilitation and encourage river restoration in Europe. The wider aim was to promote further river restoration and demonstrate how river restoration could provide multiple benefits such as enhancement in wildlife, landscape, recreation, water quality, fisheries, amenities and other local interests.

The restoration of 2 km of the Skerne was initiated in July 1995. Much of the floodplain had been raised by old industrial waste tipping, with gas and sewer pipes running alongside the river. As a result of these constraints, restoration opportunities were severely limited - typical of urban rivers elsewhere. At the upstream end, instream deflectors and a coarse sediment riffle were installed to enhance flow variability and habitat diversity. Further downstream four new meanders were cut across the old channel, which was used to create two backwaters. Soft revetments – such as willow mattress, willow spiling, underwater rock layer, fibre rolls, and geotextiles – were used on the outer meander bends to prevent erosion towards the gas main. As a flood water retention measure, about 25,000 m3 of spoil was removed from the river banks. This also aimed to increase the lateral connectivity between the river and the adjacent floodplain. The spoil was later used for landscaping purposes.

Thirteen ugly surface water outfalls were replaced with underground inspection /collection chambers that firstly intercept pollution and then discharge the water into the river below water level. New footpaths were constructed and a planting scheme engaging local residents carried out. At the downstream end of the restored section a new footbridge was constructed, designed to resemble a locomotive as a tribute to the historical significance of the Skerne Bridge.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Skerne River - RRC
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Northumbria
River basin Tees

Subcatchment

River name Tees US Low Worsall
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 152152 m <br />0.152 km <br />15,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB103025072593



Site

Name River Skerne at Haughton le Skerne
WFD water body codes GB103025072593
WFD (national) typology
WFD water body name Tees US Low Worsall
Pre-project morphology Straight
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Quick run-off
Dominant substrate
River corridor land use Urban
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 2000 m2 km <br />200,000 cm <br />
Project started 1995/01/01
Works started
Works completed
Project completed 1997/01/01
Total cost category 5000 - 10000 k€
Total cost (k€) 27502,750 k€ <br />2,750,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Riparian development
Hydromorphology Quantity & dynamics of flow, Width & depth variation, Structure & condition of riparian zones
Biology Fish: Species composition, Invertebrates, Macrophytes
Physico-chemical Oxygen balance
Other reasons for the project Bank erosion, Landscape enhancement, Recreation


Measures

Structural measures
Bank/bed modifications Re-grading and lowering, Deflector structures
Floodplain / River corridor Lowering of floodplain, Revegetate riparian zone, Creation of small wetlands
Planform / Channel pattern Introduction of sinuosity, Introduction of backwaters
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Participation in works, Information provision, Participation in design, Consultation


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Species composition Yes Yes Yes Improvement
Invertebrates Yes Yes Yes Improvement
Macrophytes Yes Yes Yes Improvement

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Public use of community park Yes Yes Yes Improvement


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://http://www.therrc.co.uk/projects/skerne brochure.pdf RRC report