Case study:Cuckolds Haven Nature Area: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=51.529128417488806, 0.07615026118776314 }} {{Project overview |Project title=Cuckolds Haven Nature Area |Sta...") |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity, Social benefits | |Themes=Habitat and biodiversity, Social benefits | ||
Line 12: | Line 11: | ||
|Main contact forename=Toni | |Main contact forename=Toni | ||
|Main contact surname=Scarr | |Main contact surname=Scarr | ||
|Main contact id=Ascarr | |||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=www.environment-agency.gov.uk | |Contact organisation url=www.environment-agency.gov.uk | ||
|Name of parent multi-site project=Case_study:Lower River Roding Regeneration Project | |||
|Multi-site=No | |Multi-site=No | ||
| | |Project picture=Cuckolds haven.jpg | ||
|Picture description=interpretation panel | |||
|Project summary='''Previous site use/issues''' | |||
• Nature area owned by LB Newham (little known/used by local people) | |||
• No access for wheelchairs | |||
• Limited access points adding to ‘fear of crime’ | |||
• Ecologically and historically valuable site but no information for site users reed buting have been seen in the reeds adjacent to the site | |||
• Lack of seating areas within site for users/local school groups | |||
'''Enhancements''' | |||
• Enhanced planting within site including black poplars | |||
• Creation of riverside seating/viewing area | |||
• Provision of site wildlife and historical information boards | |||
• New wheelchair friendly site entrance and access route | |||
• Interpretation boards installed by just ecology | |||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} |
Revision as of 19:51, 22 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | User:Ascarr |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Previous site use/issues
• Nature area owned by LB Newham (little known/used by local people)
• No access for wheelchairs
• Limited access points adding to ‘fear of crime’
• Ecologically and historically valuable site but no information for site users reed buting have been seen in the reeds adjacent to the site
• Lack of seating areas within site for users/local school groups
Enhancements
• Enhanced planting within site including black poplars
• Creation of riverside seating/viewing area
• Provision of site wildlife and historical information boards
• New wheelchair friendly site entrance and access route
• Interpretation boards installed by just ecology
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information