Case study:Wensum River Restoration Strategy: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
Line 13: | Line 13: | ||
52.781326,0.96066 | 52.781326,0.96066 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Habitat and biodiversity, Monitoring, Water quality | |||
|Country=England | |||
|Main contact forename=Nick | |||
|Main contact surname=Elbourne | |||
|Main contact id=NickRRC | |||
|Themes= | |Contact organisation=River Restoration Centre | ||
|Contact organisation url=www.therrc.co.uk | |||
|Country= | |Name of parent multi-site project=Case_study:Wensum River Restoration Strategy | ||
|Multi-site=Yes | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Main contact id= | |||
|Contact organisation= | |||
|Contact organisation url= | |||
|Name of parent multi-site project= | |||
| | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 08:37, 17 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 52° 46' 52.77" N, 0° 57' 38.38" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Monitoring, Water quality |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | River Restoration Centre |
Contact organisation web site | http://www.therrc.co.uk |
Partner organisations | |
This is a parent project encompassing the following projects |
Great Ryburgh End Restoration Scheme, Meander reinstatement on the River Wensum at the Ryburgh Loop, River Tat Restoration Scheme, River Wensum Rehabilitation Project - Bintree, River Wensum Restoration, Reach 10 Lenwade, River Wensum Restoration, Reach 3a Costessey, River rehabilitation on the River Wensum at Swanton Morley, Sculthorpe Moor Restoration Scheme, Upper Wensum Restoration Project |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Site
Name | Bintree |
---|---|
WFD water body codes | GB105034051100 |
WFD (national) typology | R19 |
WFD water body name | |
Pre-project morphology | Single channel |
Reference morphology | Single channel |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Groundwater |
Dominant substrate | Gravel |
River corridor land use | Intensive agriculture |
Average bankfull channel width category | 2 - 5 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2000/08/01 |
Works started | |
Works completed | 2000/10/01 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 73 k€73,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Environment Agency | Simon | Johnson | ||
Stakeholder engagement and communication | |||||
Works and works supervision | Environment Agency | Rob | Dryden | ||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Bed raising |
Floodplain / River corridor | |
Planform / Channel pattern | Channel narrowing |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other | Participation in maintenance |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Invertebrates: Taxonomic composition | Yes | Yes |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|