Case study:Meades water garden regeneration project: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 260: | Line 260: | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.therrc.co.uk/case_studies/meades%20water%20garden.pdf | |||
|Description=River Restoration Centre Case Study | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information |
Revision as of 11:44, 9 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 51° 42' 6.07" N, 0° 36' 41.97" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Monitoring, Water quality |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | River Restoration Centre |
Contact organisation web site | |
Partner organisations | Chiltern Chalk Streams Project |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
On the River Chess, The Meades Water Gardens are a public amenity area re-landscaped in the 1970s to create formal water gardens, through excavation of the beds and river. However, the ponds rapidly lost their wildlife and aesthetic value. The project planned to regenerate the Meade Water Gardens through the removal of weirs and the re-introduction of gravel beds.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Thames |
---|---|
River basin | Colne |
Subcatchment
River name | Chess |
---|---|
Area category | 10 - 100 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 278278 m <br />0.278 km <br />27,800 cm <br /> |
Dominant geology | Calcareous |
Ecoregion | Great Britain |
Dominant land cover | Improved grassland |
Waterbody ID | GB106039029870 |
Site
Name | Meades Water Garden |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Single channel, Straight, High width:depth |
Reference morphology | Single channel, Sinuous, Step-pool, Pool-riffle |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Groundwater |
Dominant substrate | Bedrock, Gravel |
River corridor land use | Urban |
Average bankfull channel width category | 5 - 10 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 120 m0.12 km <br />12,000 cm <br /> |
---|---|
Project started | 2007/01/01 |
Works started | |
Works completed | 2008/01/01 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 62 k€62,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Planting, Introduction of gravel, Two weir removed |
Floodplain / River corridor | Removal of diseased vegetation, Wetland created |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Macrophytes | Yes | Yes | Yes | Improvement | ||
Invertebrates | Yes | Yes | Improvement |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://www.therrc.co.uk/case studies/meades%20water%20garden.pdf | River Restoration Centre Case Study |