Case study:Langford Lakes project: Difference between revisions
Jump to navigation
Jump to search
Mattleeson (talk | contribs) No edit summary |
Mattleeson (talk | contribs) No edit summary |
||
Line 167: | Line 167: | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=publications.environment-agency.gov.uk/pdf/GESW0910BSTR-E-E.pdf | |||
|Description=WFD Status for Wylye - See P. 1355. | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information |
Revision as of 11:40, 9 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 51° 8' 10.69" N, 1° 57' 11.05" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.therrc.co.uk/rrc_case_studies1.php?csid=30 |
Themes | Economic aspects, Flood risk management, Land use management - agriculture, Social benefits, Spatial planning |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | |
Contact organisation web site | |
Partner organisations | Wiltshire Wildlife Trust, English Nature, Enviroment Agency and Wild Trout Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
This area comprises a series of large lakes with the River Wylye, a chalk stream, flowing through the centre of them. Langford lakes and the River Wylye are renowned for their popularity for angling but fish populations have declined over recent years. This has resulted in a partnership being formed between the Wiltshire Wildlife Trust, English Nature, the Environment Agency and the Wild Trout Trust to address this issue.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Site
Name | Steeple Langford |
---|---|
WFD water body codes | GB108043022550 |
WFD (national) typology | Low, Medium, Calcareous |
WFD water body name | Wylye (Middle) |
Pre-project morphology | Single channel, Straight, High width:depth |
Reference morphology | Sinuous, Pool-riffle |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | Quick run-off, Groundwater |
Dominant substrate | Bedrock, Cobble, Gravel |
River corridor land use | Extensive agriculture, Woodland |
Average bankfull channel width category | 5 - 10 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 0.30.3 m³/s <br />300 l/s <br /> |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 1000 m1 km <br />100,000 cm <br /> |
---|---|
Project started | 2002/10/01 |
Works started | |
Works completed | 2002/10/01 |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | Wiltshire wildlife trust, Natural England, Environment Agency |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Planting, Creation of a V weir |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://publications.environment-agency.gov.uk/pdf/GESW0910BSTR-E-E.pdf | WFD Status for Wylye - See P. 1355. |