Case study:Humber Estuary Erosion Protection Programme: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=53.725122920427786, -0.306329178597025 }} {{Project overview |Project title=Humber Estuary Erosion Protectio...")
 
No edit summary
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Humber Estuary Erosion Protection Programme
|Status=Planned
|Status=Planned
|Project web site url=www.therrc.co.uk/sites/default/files/projects/46_humber.pdf
|Country=England
|Country=England
|Main contact forename=Laur
|Main contact forename=Laur
Line 14: Line 14:
|Contact organisation url=www.gov.uk/government/organisations/environment-agency
|Contact organisation url=www.gov.uk/government/organisations/environment-agency
|Multi-site=No
|Multi-site=No
|Project picture=46 Humber Estuary.png
|Project summary=The defences around the Humber Estuary are affected by erosive forces as a result of strong currents and wave actio. These erosive forces cause damage to the defences and over time undermine the stability and integrity of the defences. If not addressed these defences are at risk of breaching, potentially causing significant flooding and risk to life. The Humber Estuary Erosion Protection Programme aims to remediate and manage the erosion caused to the defences. The programme is supported by the Defra-approved Humber Flood Risk Management Strategy. Alongside erosion protection works, the project also aims to achieve Water Framework Directive objectives through the design of schemes that deliver benefits to the environment.
The Humber Estuary (Map 1) is home to 921,000 people of whom nearly 400,000 are at risk of flooding, as are important industries, 32,500 business and a significant agricultural sector. The area hosts some of the highest value assets and critical infrastructure in the country, including power stations and refineries, the country’s largest port complex, a petrochemicals industry worth £6 billion per year and approximately 115,000ha of high grade agricultural land. There are some 230km of flood defences protecting the area to various standards of protection.
|Project title=Humber Estuary Erosion Protection Programme
}}
}}
{{Image gallery}}
{{Image gallery}}

Revision as of 13:51, 8 November 2018

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 43' 30.44" N, 0° 18' 22.79" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site http://www.therrc.co.uk/sites/default/files/projects/46_humber.pdf
Themes
Country England
Main contact forename Laur
Main contact surname Rhodes
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.gov.uk/government/organisations/environment-agency
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The defences around the Humber Estuary are affected by erosive forces as a result of strong currents and wave actio. These erosive forces cause damage to the defences and over time undermine the stability and integrity of the defences. If not addressed these defences are at risk of breaching, potentially causing significant flooding and risk to life. The Humber Estuary Erosion Protection Programme aims to remediate and manage the erosion caused to the defences. The programme is supported by the Defra-approved Humber Flood Risk Management Strategy. Alongside erosion protection works, the project also aims to achieve Water Framework Directive objectives through the design of schemes that deliver benefits to the environment. The Humber Estuary (Map 1) is home to 921,000 people of whom nearly 400,000 are at risk of flooding, as are important industries, 32,500 business and a significant agricultural sector. The area hosts some of the highest value assets and critical infrastructure in the country, including power stations and refineries, the country’s largest port complex, a petrochemicals industry worth £6 billion per year and approximately 115,000ha of high grade agricultural land. There are some 230km of flood defences protecting the area to various standards of protection.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information