Case study:Little Don Catchment Case Study: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Little Don Catchment Case Study
|Status=Complete
|Status=Complete
|Themes=Environmental flows and water resources
|Themes=Environmental flows and water resources
Line 15: Line 14:
|Contact organisation url=https://www.catchmentbasedapproach.org/index.php?option=com_k2&view=item&layout=item&id=29&Itemid=244
|Contact organisation url=https://www.catchmentbasedapproach.org/index.php?option=com_k2&view=item&layout=item&id=29&Itemid=244
|Multi-site=No
|Multi-site=No
|Project picture=River Don map.png
|Project summary=**Brief Outline of Scheme
The Little Don rises in the Peak District National Park and joins the River Don just south of Stocksbridge town, a river length of about 20km. Flow in the watercourses are heavily regulated and managed by three reservoirs and several smaller impounding weirs. The reservoirs are operated by Yorkshire Water, with Langsett and Midhope reservoirs being operated for water storage, and Underbank reservoir for a compensation flow release.
Langsett and Midhope reservoirs modify the downstream flow regimes by buffering the range and magnitude of flows. As a result the baseflow is lower than would be expected naturally and the timing and magnitude of autumn/winter high flows is dependent on the levels in the reservoirs during this time. A compensating flow is released from Underbank reservoir (the bottom reservoir of the group), although analysis of catchment inflows and rainfall patterns has shown this to be too high, a legacy of the industrial use of the Don catchment. Other Yorkshire Water reservoir compensation flow release trials have demonstrated that modifying flows to more naturally flow regimes can improve the quantity and diversity of the ecological community. The Little Don is defined as a Heavily Modified Water Body (HMWB) under the Water Framework Directive and assessed at moderate ecological potential, with an objective to improve to good ecological potential by 2027;
this WFD objective is the main driver for the scheme.
Barriers along the Little Don have been observed to significantly reduce ecological connectivity with large proportions of the watercourses under-used by trout and other fish. Whilst the barriers restrict the movement of coarse sediment, studies were inconclusive on the extent of the problem. Additional pressures within the catchment include water pollution (including minewater discharges) and invasive non-native species (such as the New Zealand mud snail).
|Project title=Little Don Catchment Case Study
}}
}}
{{Image gallery}}
{{Image gallery}}

Revision as of 18:49, 14 March 2018

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 29' 58.91" N, 1° 40' 10.60" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources
Country England
Main contact forename sarah
Main contact surname Hyde
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://https://www.catchmentbasedapproach.org/index.php?option=com k2&view=item&layout=item&id=29&Itemid=244
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


    • Brief Outline of Scheme

The Little Don rises in the Peak District National Park and joins the River Don just south of Stocksbridge town, a river length of about 20km. Flow in the watercourses are heavily regulated and managed by three reservoirs and several smaller impounding weirs. The reservoirs are operated by Yorkshire Water, with Langsett and Midhope reservoirs being operated for water storage, and Underbank reservoir for a compensation flow release. Langsett and Midhope reservoirs modify the downstream flow regimes by buffering the range and magnitude of flows. As a result the baseflow is lower than would be expected naturally and the timing and magnitude of autumn/winter high flows is dependent on the levels in the reservoirs during this time. A compensating flow is released from Underbank reservoir (the bottom reservoir of the group), although analysis of catchment inflows and rainfall patterns has shown this to be too high, a legacy of the industrial use of the Don catchment. Other Yorkshire Water reservoir compensation flow release trials have demonstrated that modifying flows to more naturally flow regimes can improve the quantity and diversity of the ecological community. The Little Don is defined as a Heavily Modified Water Body (HMWB) under the Water Framework Directive and assessed at moderate ecological potential, with an objective to improve to good ecological potential by 2027; this WFD objective is the main driver for the scheme.

Barriers along the Little Don have been observed to significantly reduce ecological connectivity with large proportions of the watercourses under-used by trout and other fish. Whilst the barriers restrict the movement of coarse sediment, studies were inconclusive on the extent of the problem. Additional pressures within the catchment include water pollution (including minewater discharges) and invasive non-native species (such as the New Zealand mud snail).


Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Abstraction
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information