|Project started=2010 | |Project started=2010 | ||
}} | }} | ||
{{Motivations}} | {{Motivations | ||
|Specific mitigation=Diffuse pollution from waste spoil heaps | |||
|Physico-chemical quality elements=Nutrient concentrations, | |||
}} | |||
{{Measures}} | {{Measures}} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Revision as of 11:50, 23 May 2017
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Habitat and biodiversity, Monitoring, Water quality |
Country | England |
Main contact forename | Hugh |
Main contact surname | Potter |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | |
Partner organisations | The Coal Authority (UK) |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Threlkeld mine was worked for lead and zinc between 1661 and 1928. The mine has a long history of causing pollution and fish kills, and the owners were first prosecuted in 1890. The mine is a significant source of heavy metal pollution, particularly cadmium and zinc, in Gategill Beck and the River Glenderamackin, which fails to achieve 'Good' status for the Water Framework Directive. The metal pollution also affects the River Derwent and Bassenthwaite Lake Special Area of Conservation (SAC) and Site of Special Scientific Interest (SSSI). The main source of metals is the Woodend Low Level but there is also diffuse pollution from waste spoil heaps.
Since 2010, we have been investigating the impacts from the mine with funding from Defra in partnership with the Coal Authority. Our monitoring confirms that the Woodend Low Level is one of the most polluting mine waters in the UK. Key findings from our monitoring are: • Immediately downstream of the mine, metal concentrations in Gategill Beck are up to 1,770 times the zinc environmental quality standard (EQS) and 525 times the cadmium EQS. Two km downstream, after dilution in the River Glenderamackin, zinc and cadmium are still up to 30 and 10 times the EQS respectively. • The mine discharges up to 29 tonnes of zinc, and 91 kg of cadmium each year. • At higher river flows, the spoil heaps contribute additional metal pollution. • Up to 16km of the River Glenderamackin, River Derwent and Bassenthwaite Lake fail the EQS for zinc and cadmium, so fail to achieve Good Status.
We're working with the Coal Authority to identify the best way to clean up the pollution with funding from Defra. Initial work has gathered information about how to capture the mine water, and during 2016 we have been reviewing suitable treatment technologies. The minewaters at Gategill are challenging due to their low pH and high metal concentrations which are different from water treated by other full, pilot and laboratory based passive systems in the UK. Passive treatment is still the preferred option but pilot testing may be required and operating costs may be higher than for other passive schemes. The Coal Authority will also investigate potential locations for a treatment system to be built. We will discuss the results of our recommended solution with local stakeholders. Cleaning up the mine water pollution is estimated to deliver environmental and economic benefits of up to £4m over 25 years.
Until recently there was another problem in Gategill Beck. The ‘Yellow Dam’ was created in the 1880’s to provide a water supply and power for mining activities. It consists of a wall and a culvert with mining spoil placed on top to create a dam across the beck. The dam grew weaker with age and the culvert underneath was corroded by the acidic mine water. This meant water built up behind the dam after heavy rain, putting pressure on the structure and creating a small risk that it could collapse. If this happened, any water that had built up behind the dam could quickly flow downstream to flood local properties and part of the A66.
The private owner of the dam was unable to resolve the issue so the Environment Agency worked with Cumbria County Council, Eden District Council, the Lake District National Park Authority and the Highways Agency to identify a solution and funding. During 2014 and 2015, the dam was made safe by lowering the crest height, sealing the culvert and installing a new overflow channel. The Coal Authority paid for the EA contractors to install a pipe through the dam to transfer mine water to a future treatment scheme.
Mine water discharge summary
- Length of watercourse affected: 16km
- Average metal concentration: Zinc = ~37,500μg/l (up to 18tonnes/yr), Cadmium = 78μg/l (up to 69kg/yr), Lead = 470μg/l, Nickel = 270μg/l
- Water body ecological status/potential: Moderate (River Glenderamackin, River Derwent) Flow = 6 l/s
Magnitude of impact:
- Zinc: up to 1,900 times EQS
- Cadmium: up to 375 times EQS
Benefits of remediation
- Bassenthwaite Lake SSSI would be protected from a major pollution source
- The river corridor in a Special Area of Conservation would be improved
- Ecological improvements would be made to up to 16km of river (Glenderamackin, Derwent)
- Local properties and infrastructure could be protected from a flooding and pollution event
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|