Case study:River Petteril Evidence and Measures Project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(Created page with "{{Case study status |Approval status=Draft }} {{Location}} {{Project overview |Project title=River Petteril Evidence and Measures Project |Status=In progress |Themes=Economic ...")
 
No edit summary
Line 17: Line 17:
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site}}
{{Project background}}
{{Project background
|Project started=2011/09/01
|Works started=2011/09/01
|Total cost category=500 - 1000 k€
|Total1 cost=£720,000
|Funding sources=WFD
|Investigation and design cost category=1 - 10 k€
|Investigation and design Lead organisation=Environment Agency
|Investigation and design Other contact forename=Anne Marie
|Investigation and design Other contact surname=Bowman
|Stakeholder1 engagement cost category=1 - 10 k€
|Stakeholder engagement Lead organisation=Eden Rivers Trust
|Stakeholder engagement Other contact forename=Simon
|Stakeholder engagement Other contact surname=Johnson
|Works1 and supervision cost category=500 - 1000 k€
|Wrk and supervision cost=£720,000
|Works and supervision Lead organisation=Eden Rivers Trust
|Works and supervision Other contact forename=Simon
|Works and supervision Other contact surname=Johnson
|Monitoring1 cost category=1 - 10 k€
|Monitoring Lead organisation=Environment Agency
|Monitoring Other contact forename=Andy
|Monitoring Other contact surname=Gowans
}}
{{Motivations}}
{{Motivations}}
{{Measures}}
{{Measures}}

Revision as of 13:03, 11 October 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status In progress
Project web site
Themes Economic aspects, Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Land use management - forestry, Water quality
Country England
Main contact forename Olly
Main contact surname Southgate
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://environment-agency.gov.uk
Partner organisations
Parent multi-site project

Eden

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started 2011/09/01
Works started 2011/09/01
Works completed
Project completed
Total cost category 500 - 1000 k€
Total cost (k€) £720,000"£" is not declared as a valid unit of measurement for this property.
Benefit to cost ratio
Funding sources WFD

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design 1 - 10 k€ Environment Agency Anne Marie Bowman
Stakeholder engagement and communication 1 - 10 k€ Eden Rivers Trust Simon Johnson
Works and works supervision 500 - 1000 k€ £720,000"£" is not declared as a valid unit of measurement for this property. Eden Rivers Trust Simon Johnson
Post-project management and maintenance
Monitoring 1 - 10 k€ Environment Agency Andy Gowans



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information