Case study:Butter Hill Phase 2: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=51.368764799145474, -0.1610929286107421 }} {{Project overview |Project title=Butter Hill Phase 2 |Status=Com...") |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Fisheries, Habitat and biodiversity, Social benefits, Urban | |Themes=Fisheries, Habitat and biodiversity, Social benefits, Urban | ||
Line 14: | Line 13: | ||
|Contact organisation=Wandle Trust | |Contact organisation=Wandle Trust | ||
|Contact organisation url=www.wandletrust.org | |Contact organisation url=www.wandletrust.org | ||
|Name of parent multi-site project=Case_study:Butter Hill restoration project, River Wandle | |||
|Multi-site=No | |Multi-site=No | ||
| | |Project picture=Butterhill Phase 2 Before and Afters.png | ||
|Picture description=Before and After of Restoration Works © Wandle Trust | |||
|Project summary=This Project is part of a larger scheme with the overall aim of establishing a population of brown trout in the Carshalton arm of the River Wandle for the first time in over 80 years. For more background on this larger scheme, please refer to the parent project "River Wandle Restoration Project". | |||
The weir at Millpond Place was notched to restore natural flow to the upstream channel. | |||
The over-wide and straightened channel was narrowed and a new bank line created with the help of volunteers by using chestnut faggot bundles pinned into place with chestnut stakes. | |||
Silt from the channel was then moved behind the faggot bundles to create a new bank. Brash and topsoil were added to stabilise this new bank and 1000 native aquatic plants and three planted coir rolls were installed to further stabilise it with the help of volunteers. | |||
Seventy tonnes of gravel were added to the newly modified channel and carefully distributed to create riffles, pools and bars giving rise to a variety of new habitat areas for fish, invertebrates and plants. | |||
Further habitat works were carried out in channel with volunteers, adding Large Woody Debris flow deflectors to diversify the flow. Two “Dragon’s Tooth” berms were created by installing logs and brash bundles. Almost 100 volunteers were involved over several weekends. | |||
|Monitoring surveys and results=Please see the parent project (River Wandle Restoration Project) for the final results on this work, combined with the other phases. | |||
|Lessons learn=- Urban nature of the site | |||
- Getting some local, neighbouring residents to understand and buy in to the project was difficult | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} |
Revision as of 14:33, 9 February 2016
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Social benefits, Urban |
Country | England |
Main contact forename | Tim |
Main contact surname | Longstaff |
Main contact user ID | |
Contact organisation | Wandle Trust |
Contact organisation web site | http://www.wandletrust.org |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This Project is part of a larger scheme with the overall aim of establishing a population of brown trout in the Carshalton arm of the River Wandle for the first time in over 80 years. For more background on this larger scheme, please refer to the parent project "River Wandle Restoration Project".
The weir at Millpond Place was notched to restore natural flow to the upstream channel. The over-wide and straightened channel was narrowed and a new bank line created with the help of volunteers by using chestnut faggot bundles pinned into place with chestnut stakes.
Silt from the channel was then moved behind the faggot bundles to create a new bank. Brash and topsoil were added to stabilise this new bank and 1000 native aquatic plants and three planted coir rolls were installed to further stabilise it with the help of volunteers.
Seventy tonnes of gravel were added to the newly modified channel and carefully distributed to create riffles, pools and bars giving rise to a variety of new habitat areas for fish, invertebrates and plants. Further habitat works were carried out in channel with volunteers, adding Large Woody Debris flow deflectors to diversify the flow. Two “Dragon’s Tooth” berms were created by installing logs and brash bundles. Almost 100 volunteers were involved over several weekends.
Monitoring surveys and results
Please see the parent project (River Wandle Restoration Project) for the final results on this work, combined with the other phases.
Lessons learnt
- Urban nature of the site
- Getting some local, neighbouring residents to understand and buy in to the project was difficult
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|