Case study:Dunston Beck Restoration: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 32: Line 32:
}}
}}
{{Project background}}
{{Project background}}
{{Motivations}}
{{Motivations
|Biological quality elements=Habitat, trout
|Other motivation=Landscape enhancement,
}}
{{Measures
{{Measures
|Bank and bed modifications measure=faggot berms, Creation of wooden deflectors,  
|Bank and bed modifications measure=faggot berms, Creation of wooden deflectors,  

Revision as of 14:34, 10 January 2017

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 9' 11.91" N, 0° 23' 59.15" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Environmental flows and water resources, Habitat and biodiversity, Hydromorphology, Social benefits
Country England
Main contact forename -
Main contact surname -
Main contact user ID
Contact organisation Lincolnshire Rivers Trust
Contact organisation web site
Partner organisations The Wild Trout Trust, Environment Agency
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Local residents of Dunston, supported by the Wild Trout Trust have completed a section of in stream habitat improvements. Lincolnshire Rivers Trust are also supporting this project by volunteering at the work parties and publicising them too. This important work will help to improve the aesthetic value of the stream for local people and protect the wild trout populations that live here.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Anglian
River basin Witham

Subcatchment

River name Dunston Beck
Area category 10 - 100 km²
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 8484 m <br />0.084 km <br />8,400 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB105030056230



Site

Name
WFD water body codes GB105030056230
WFD (national) typology
WFD water body name Dunston Beck
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Habitat, trout
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications faggot berms, Creation of wooden deflectors
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Community involvement, Work with schools and communities
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information