Case study:Little Waltham Meadows Back Channel creation: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 28: Line 28:
|File name=The back channel comes together.jpg
|File name=The back channel comes together.jpg
}}
}}
{{Case study image
 
|File name=excavation of the channel
}}
{{Image gallery end}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle button}}

Revision as of 15:32, 31 October 2014

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

5.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 46' 26.36" N, 0° 28' 50.59" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity, Hydromorphology
Country England
Main contact forename Kieren
Main contact surname Alexander
Main contact user ID User:KierenAlexander
Contact organisation Essex Wildlife Trust
Contact organisation web site http://www.essexwt.org.uk
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


This is a multi-pronged project aimed at improving in channel morphological diversity, reducing diffuse pollution and sedimentation entering the main river Chelmer and Provide improvements to the riparian habitats and enhance the resilience of the wet woodland.

Funded by the Catchment restoration fund, as part of the Essex Healthy headwaters scheme, the earthworks will take place in late Summer, early Autumn 2014.

This aims of the project will be achieved by creating a new 280 backwater channel to provide refuges for fish and Macrophytes during high flow events. This will also enhance habitat variability by creating additional space for emergent vegetation and new bank side vegetation. An existing land drain which currently feeds directly into the Chelmer will be redirected to feed into two new settlement ponds which will filter out the diffuse pollution by a method of delay, settle out and filter. This land drain will then feed into the new backwater channel.

Additional habitat will be created by installing a new sluice to re-wet an existing piece of woodland to historical levels. Extra woodland will be planted on the river side to create shading of the river and the new channel. Water to the new back channel will be controlled via a new water control structure, maintaining the flows of the River Chelmer.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


The back channel comes together.jpg


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information