Case study:Big Yellow: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
(XML import) |
||
Line 4: | Line 4: | ||
{{Location | {{Location | ||
|Location= | |Location= | ||
}} | }} | ||
{{ | {{Project_overview | ||
|Status=Complete | |Status= | ||
|Themes= | |||
|Country=England | |||
|Main contact forename=Penelope | Complete | ||
|Main contact surname=Calver | |Project web site url= | ||
|Contact organisation= | |||
|Contact organisation url= | |Themes= | ||
|Multi-site= | |||
| | |Country= | ||
England | |||
|Main contact forename= | |||
Penelope | |||
|Main contact surname= | |||
Calver | |||
|Main contact id= | |||
|Contact organisation= | |||
|Contact organisation url= | |||
|Partner organisations= | |||
|Multi-site= | |||
|Name of parent multi-site project= | |||
|Project picture= | |||
|Picture description= | |||
|Project summary= | |||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle_button}} | |||
{{Toggle_content_start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name= | ||
|WFD water body code= | |WFD water body code= | ||
|WFD (national) typology= | |WFD (national) typology= | ||
|WFD water body name= | |WFD water body name= | ||
|Pre-project morphology= | |Pre-project morphology= | ||
|Reference morphology= | |Reference morphology= | ||
|Heavily modified water body= | |Heavily modified water body= | ||
|Local site designation= | |Local site designation= | ||
|Site designation= | |Site designation= | ||
|Protected species present= | |Protected species present= | ||
|Invasive species present= | |Invasive species present= | ||
|Species= | |Species= | ||
|Dominant hydrology= | |Dominant hydrology= | ||
|Dominant substrate= | |Dominant substrate= | ||
|River corridor land use= | |River corridor land use= | ||
|Average bankfull channel width category= | |Average bankfull channel width category= | ||
|Avrg bankfull channel width= | |Avrg bankfull channel width= | ||
|Average bankfull channel depth category= | |Average bankfull channel depth category= | ||
|Avrg1 bankfull channel depth= | |Avrg1 bankfull channel depth= | ||
|Mean discharge category= | |Mean discharge category= | ||
|Mn discharge= | |Mn discharge= | ||
|Average channel gradient category= | |Average channel gradient category= | ||
|Avrg channel gradient= | |Avrg channel gradient= | ||
}} | }} | ||
{{Project_background | {{Project_background | ||
|Reach length directly affected= | |Reach length directly affected= | ||
|Project started= | |Project started= | ||
|Works started= | |Works started= | ||
|Works completed= | |Works completed= | ||
|Project completed= | |Project completed= | ||
|Total cost category= | |Total cost category= | ||
|Total1 cost= | |Total1 cost= | ||
|Funding sources= | |Funding sources= | ||
|Investigation and design cost category= | |Investigation and design cost category= | ||
|Invst and design cost= | |Invst and design cost= | ||
|Investigation and design Lead organisation= | |Investigation and design Lead organisation= | ||
|Investigation and design Other contact forename= | |Investigation and design Other contact forename= | ||
|Investigation and design Other contact surname= | |Investigation and design Other contact surname= | ||
|Stakeholder1 engagement cost category= | |Stakeholder1 engagement cost category= | ||
|stk engagement cost= | |stk engagement cost= | ||
|Stakeholder engagement Lead organisation= | |Stakeholder engagement Lead organisation= | ||
|Stakeholder engagement Other contact forename= | |Stakeholder engagement Other contact forename= | ||
|Stakeholder engagement Other contact surname= | |Stakeholder engagement Other contact surname= | ||
|Works1 and supervision cost category= | |Works1 and supervision cost category= | ||
|Wrk and supervision cost= | |Wrk and supervision cost= | ||
|Works and supervision Lead organisation= | |Works and supervision Lead organisation= | ||
|Works and supervision Other contact forename= | |Works and supervision Other contact forename= | ||
|Works and supervision Other contact surname= | |Works and supervision Other contact surname= | ||
|Post-project1 management and maintenance cost category= | |Post-project1 management and maintenance cost category= | ||
|Post-project2 management and maintenance cost= | |Post-project2 management and maintenance cost= | ||
|Post-project management and maintenance Lead organisation= | |Post-project management and maintenance Lead organisation= | ||
|Post-project management and maintenance Other contact forename= | |Post-project management and maintenance Other contact forename= | ||
|Post-project management and maintenance Other contact surname= | |Post-project management and maintenance Other contact surname= | ||
|Monitoring1 cost category= | |Monitoring1 cost category= | ||
|Monitoring2 cost= | |Monitoring2 cost= | ||
|Monitoring Lead organisation= | |Monitoring Lead organisation= | ||
|Monitoring Other contact forename= | |Monitoring Other contact forename= | ||
|Monitoring Other contact surname= | |Monitoring Other contact surname= | ||
|Supplementary funding information= | |Supplementary funding information= | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Hydromorphological quality elements=Channel pattern/planform, Width & depth variation | |Hydromorphological quality elements= | ||
Channel pattern/planform, Width & depth variation | |||
|Biological quality elements= | |Biological quality elements= | ||
|Physico-chemical quality elements= | |Physico-chemical quality elements= | ||
|Specific mitigation= | |Specific mitigation= | ||
|Other motivation= | |Other motivation= | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Deculverting | |Bank and bed modifications measure= | ||
Deculverting | |||
|Floodplain / River corridor= | |Floodplain / River corridor= | ||
|Planform / Channel pattern= | |Planform / Channel pattern= | ||
|Other technical measure= | |Other technical measure= | ||
|Management interventions= | |Management interventions= | ||
|Social measures= | |Social measures= | ||
|Wider stakeholder / citizen engagement= | |Wider stakeholder / citizen engagement= | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header | {{Hydromorphological_quality_elements_header}} | ||
}} | {{End_table}} | ||
{{End_table | {{Biological_quality_elements_header}} | ||
}} | {{End_table}} | ||
{{Biological_quality_elements_header | {{Physico-chemical_quality_elements_header}} | ||
}} | {{End_table}} | ||
{{End_table | {{Other_responses_header}} | ||
}} | {{End_table}} | ||
{{Physico-chemical_quality_elements_header | {{Monitoring_documents}} | ||
}} | {{Monitoring_documents_end}} | ||
{{End_table | {{Additional_Documents}} | ||
}} | {{Additional_Documents_end}} | ||
{{Other_responses_header | {{Additional_links_and_references_header}} | ||
}} | {{Additional_links_and_references_footer}} | ||
{{End_table | |||
}} | |||
{{Monitoring_documents | |||
}} | |||
{{Monitoring_documents_end | |||
}} | |||
{{Additional_Documents | |||
}} | |||
{{Additional_Documents_end | |||
}} | |||
{{Additional_links_and_references_header | |||
}} | |||
{{Additional_links_and_references_footer | |||
}} | |||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Toggle_content_end | {{Toggle_content_end}} | ||
}} | {{Case_study_upload}} | ||
{{Case_study_upload | |||
}} |
Revision as of 15:38, 24 April 2014
This case study is pending approval by a RiverWiki administrator.
Location: none specified
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | England |
Main contact forename | Penelope |
Main contact surname | Calver |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|